No.273 of 650 · approved, not built MP: Chris Curtis (Labour) England

Milton Keynes North

Milton Keynes North has 4.2 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 1,500 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £92 a year per household, £3.7m across the constituency's 40,657 homes.

Not visible
here
14 MW of wind is running in this constituency, but it sits on the local network rather than the national grid — so if it is paid to switch off, no national record shows it. That is why this seat has no figure here: not because nothing happens, but because nobody publishes it. The £ figure for this seat is a floor, not a zero.
4.2 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 1,500 homes. Approved at least two years ago; waiting on the grid, not on planning. That is 0.1× the renewable capacity actually running here.
6 projects · planning database (REPD), July 2026 · how we worked this out
£3.7m
is what the grid gap costs this constituency's 40,657 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

6 of 6 waiting projects · years since approval
Mercedes Benz UK - Solar array car port 2 MW
4.9 YRS
Vodafone, Fingle Drive - Solar PV Panels 0.3 MW
3.4 YRS
Caldecote Farm - Storage & Distribution Unit 0.3 MW
3.1 YRS
Ingram Content Group UK, Chapter House - Solar Panels 1 MW
3.0 YRS
Tanners Drive, Blakelands - Solar Panels 0.2 MW
2.9 YRS
Linford Wood Business Park, Linford Wood - Solar Panels 0.4 MW
2.4 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Mercedes Benz UK - Solar array car portSolar Photovoltaics700 homes2.0 MW2021-094.9 yrs
Ingram Content Group UK, Chapter House - Solar PanelsSolar Photovoltaics400 homes1.0 MW2023-083.0 yrs
Linford Wood Business Park, Linford Wood - Solar PanelsSolar Photovoltaics100 homes0.4 MW2024-032.4 yrs
Vodafone, Fingle Drive - Solar PV PanelsSolar Photovoltaics100 homes0.3 MW2023-033.4 yrs
Caldecote Farm - Storage & Distribution UnitSolar Photovoltaics100 homes0.3 MW2023-073.1 yrs
Tanners Drive, Blakelands - Solar PanelsSolar Photovoltaics100 homes0.2 MW2023-092.9 yrs

Plus 6 more approved within the last two years.

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →