Mid and South Pembrokeshire
Mid and South Pembrokeshire has 9.5 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 3,400 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £92 a year per household, £4.2m across the constituency's 45,486 homes.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| West Farm, Cosheston - Solar Farm | Solar Photovoltaics | 3,300 homes | 9.0 MW | 2024-03 | 2.4 yrs |
| Heatherton World Of Activity, Heatherton Sports Park - Solar Arrays | Solar Photovoltaics | 100 homes | 0.2 MW | 2023-03 | 3.3 yrs |
| Kiln Park Holiday Centre, Marsh Road - Solar Photovoltaic Panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2023-11 | 2.7 yrs |
Plus 4 more approved within the last two years.
Batteries
| Site | Size | Status | While discharging |
|---|---|---|---|
| Pembroke Power Station, Pwllcrochan - Battery Storage | 350 MW | approved, not built 2025 | could supply ≈1,226,000 homes |
| Goldborough Road, Hundleton - Battery Energy Storage | 350 MW | approved, not built 2025 | could supply ≈1,226,000 homes |
| The Greenlink Converter Station - Lambeeth Battery Energy Storage | 50 MW | approved, not built 2024 | could supply ≈175,000 homes |
| White House Farm | 12 MW | in planning | could supply ≈42,000 homes |
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →
What has Henry Tufnell said about the grid in Parliament? Search Hansard →