No.70 of 650 · approved, not built MP: Edward Argar (Conservative) England

Melton and Syston

Melton and Syston has 99 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 36,000 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £116 a year per household, £4.7m across the constituency's 40,205 homes.

Not visible
here
7.2 MW of wind is running in this constituency, but it sits on the local network rather than the national grid — so if it is paid to switch off, no national record shows it. That is why this seat has no figure here: not because nothing happens, but because nobody publishes it. The £ figure for this seat is a floor, not a zero.
99 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 36,000 homes. Approved at least two years ago; waiting on the grid, not on planning. That is 2.9× the renewable capacity actually running here.
7 projects · planning database (REPD), July 2026 · how we worked this out
£4.7m
is what the grid gap costs this constituency's 40,205 households in a year between them — £116 each, about 65 days of one home's electricity.
The £116 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

3 of 7 waiting projects · years since approval
Syston Road - Solar Farm 26 MW
4.3 YRS
Jericho Covert Solar Farm 50 MW
4.2 YRS
Old Hall Solar farm 22 MW
2.2 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Jericho Covert Solar FarmE/O Jericho CovertSolar Photovoltaics18,000 homes49.9 MW2022-084.2 yrs
Syston Road - Solar FarmSyston RoadSolar Photovoltaics9,400 homes26.0 MW2022-084.3 yrs
Old Hall Solar farmE/O Six Hills Road RagdaleSolar Photovoltaics8,200 homes22.5 MW2024-092.2 yrs
Melton Commercial Park - Solar PanelsMelton Commercial Park, St Bartholomews Way, Melton MowbraySolar Photovoltaics200 homes0.6 MW2021-095.2 yrs
Brooksby Melton College, Hoby Road - Solar Photovoltaic PanelsBrooksby Melton College, Hoby Road, Melton MowbraySolar Photovoltaics100 homes0.2 MW2024-092.2 yrs
Ratcliffe College, Fosse Way - Solar PanelsRatcliffe College, 351 Fosse Way, CossingtonSolar Photovoltaics—— MW2023-063.4 yrs
Hall Farm, Wymondham Road - Solar PV PanelsHall Farm, Wymondham Road, Garthorpe, Melton MowbraySolar Photovoltaics—— MW2023-083.2 yrs

Plus 3 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
Asfordby Business Park (1)23 MWoperating 2016could supply ≈82,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →