No.188 of 650 · approved, not built MP: Mr Joshua Reynolds (Liberal Democrat) England

Maidenhead

Maidenhead has 23 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 8,300 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.8m across the constituency's 41,692 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
23 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 8,300 homes. Approved at least two years ago; waiting on the grid, not on planning.
3 projects · planning database (REPD), July 2026 · how we worked this out
£3.8m
is what the grid gap costs this constituency's 41,692 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

3 of 3 waiting projects · years since approval
Furze Platt Senior School, Furze Platt Road - Solar Panels 0.2 MW
3.2 YRS
Car Park Legoland Windsor Resort, Winkfield Road - PV solar photovoltaic 1.2 MW
2.2 YRS
Billingbear Solar Farm 22 MW
2.0 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Billingbear Solar FarmSolar Photovoltaics7,800 homes21.5 MW2024-072.0 yrs
Car Park Legoland Windsor Resort, Winkfield Road - PV solar photovoltaicSolar Photovoltaics400 homes1.2 MW2024-062.2 yrs
Furze Platt Senior School, Furze Platt Road - Solar PanelsSolar Photovoltaics100 homes0.2 MW2023-053.2 yrs

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →