No.254 of 650 · approved, not built MP: Karl Turner (Independent) England

Kingston upon Hull East

Kingston upon Hull East has 5.6 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 2,000 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £92 a year per household, £4.0m across the constituency's 44,034 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
5.6 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 2,000 homes. Approved at least two years ago; waiting on the grid, not on planning. That is 0.7× the renewable capacity actually running here.
10 projects · planning database (REPD), July 2026 · how we worked this out
£4.0m
is what the grid gap costs this constituency's 44,034 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

6 of 10 waiting projects · years since approval
Morrisons Supermarket - PV Solar System 0.3 MW
4.3 YRS
Geneva Way Business Park - Solar PV Panels 0.3 MW
3.9 YRS
Bericap, Oslo Road - Solar Panels 1.3 MW
3.8 YRS
Cranswick Convenience Foods, Helsinki Road - Solar Panels 0.9 MW
3.8 YRS
Cranswick Foods, Helsinki Road - Solar Panels 0.7 MW
3.8 YRS
Cranswick Foods, Helsinki Road - Solar Panels 0.5 MW
3.8 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Bericap, Oslo Road - Solar PanelsSolar Photovoltaics500 homes1.3 MW2022-103.8 yrs
Cranswick Convenience Foods, Helsinki Road - Solar PanelsSolar Photovoltaics300 homes0.9 MW2022-103.8 yrs
Cranswick Foods, Helsinki Road - Solar PanelsSolar Photovoltaics200 homes0.7 MW2022-103.8 yrs
Caradon Ideal, National Avenue - Solar PanelsSolar Photovoltaics200 homes0.6 MW2023-102.8 yrs
Cranswick Foods, Helsinki Road - Solar PanelsSolar Photovoltaics200 homes0.5 MW2022-103.8 yrs
Cranswick Foods, Helsinki Road - Solar PhotovoltaicsSolar Photovoltaics200 homes0.5 MW2022-113.7 yrs
Morrisons Supermarket - PV Solar SystemSolar Photovoltaics100 homes0.3 MW2022-044.3 yrs
Kingspan Access Floors,Burma Drive - Solar PV SystemSolar Photovoltaics100 homes0.3 MW2023-033.3 yrs
Geneva Way Business Park - Solar PV PanelsSolar Photovoltaics100 homes0.3 MW2022-093.9 yrs
WJ Components Limited, Burma Drive - Solar PanelsSolar Photovoltaics100 homes0.1 MW2024-072.1 yrs

Plus 4 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
Hull East Stor Generation Compound - Battery energy storage20 MWapproved, not built 2021could supply ≈70,000 homes
Green Frog Power, Great Field Lane - Battery Energy Storage System20 MWapproved, not built 2025could supply ≈70,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →

What has Karl Turner said about the grid in Parliament? Search Hansard →

See the full league table Data (JSON)