Honiton and Sidmouth
Honiton and Sidmouth has 39 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 14,000 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.8m across the constituency's 41,238 homes. A 150 MW battery was refused planning here in 2025; while discharging it could have supplied about 526,000 homes.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| Beavor - Photovoltaic Solar Arrays | Solar Photovoltaics | 6,900 homes | 18.9 MW | 2022-02 | 4.5 yrs |
| Rockbeare Hill | Solar Photovoltaics | 5,400 homes | 15.0 MW | 2020-07 | 6.0 yrs |
| Little Toms - Solar Farm | Solar Photovoltaics | 1,800 homes | 5.0 MW | 2024-06 | 2.1 yrs |
Plus 2 more approved within the last two years.
Batteries
| Site | Size | Status | While discharging |
|---|---|---|---|
| Stammery Hill - Battery Energy Storage System | 150 MW | refused 2025 | could supply ≈526,000 homes |
| Pound Road, Hawkchurch - Battery Energy Storage | 120 MW | refused 2024 | could supply ≈420,000 homes |
| Pound Road, Hawkchurch - Battery Energy Storage System | 120 MW | refused 2023 | could supply ≈420,000 homes |
| Newlands Farm, Crewkerne Road - Battery Energy Storage | 80 MW | refused 2025 | could supply ≈280,000 homes |
| Wareham Road, Scouse Farm - Battery Storage | 50 MW | refused 2025 | could supply ≈175,000 homes |
| National Grid Axminster Substation | 50 MW | in planning | could supply ≈175,000 homes |
| Langford Solar Farm | 35 MW | 2022 | could supply ≈123,000 homes |
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →
What has Richard Foord said about the grid in Parliament? Search Hansard →