No.82 of 650 · approved, not built MP: Dr Luke Evans (Conservative) England

Hinckley and Bosworth

Hinckley and Bosworth has 80 MW of clean power (almost all solar) approved and still not built: enough to supply a year's electricity to 30,000 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £92 a year per household, £3.9m across the constituency's 42,853 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
80 MW
of clean power — almost all solar — approved and still not built, enough to supply a year's electricity to 30,000 homes. Approved at least two years ago; waiting on the grid, not on planning. That is 2.7× the renewable capacity actually running here.
11 projects · 78 MW solar, 2 MW onshore wind · planning database (REPD), July 2026 · how we worked this out
£3.9m
is what the grid gap costs this constituency's 42,853 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

6 of 11 waiting projects · years since approval
Manor Park, Twycross - Solar Photovoltaic Panels 0.2 MW
4.9 YRS
Stoneshollow Solar Farm 50 MW
4.0 YRS
Kirkby Road 24 MW
3.8 YRS
Morrison Supermarkets, Cloverfield - Solar Panels 0.4 MW
3.7 YRS
Barns Heath Farm - Wind Turbines 2 MW
3.4 YRS
Mercia Park, Burton Road - Solar PV Panels 1 MW
3.4 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Stoneshollow Solar FarmSolar Photovoltaics18,000 homes49.9 MW2022-084.0 yrs
Kirkby RoadSolar Photovoltaics8,500 homes23.5 MW2022-103.8 yrs
Barns Heath Farm - Wind TurbinesWind Onshore1,700 homes2.0 MW2023-023.4 yrs
Triumph Motorcycles, Normandy Way - Solar PV ArraySolar Photovoltaics500 homes1.3 MW2023-112.8 yrs
Mercia Park, Burton Road - Solar PV PanelsSolar Photovoltaics400 homes1.0 MW2023-033.4 yrs
Dpd International Gateway, Logix Road Phase 1 - Solar PanelsSolar Photovoltaics300 homes0.8 MW2023-102.8 yrs
DPD International Gateway, Logix Road - Phase 2, Solar PanelsSolar Photovoltaics200 homes0.5 MW2024-042.3 yrs
Morrison Supermarkets, Cloverfield - Solar PanelsSolar Photovoltaics200 homes0.4 MW2022-113.7 yrs
Burbage House - Solar ArraySolar Photovoltaics100 homes0.3 MW2023-073.1 yrs
E M E B Sports & Social Club, Nutts Lane - Solar ArraySolar Photovoltaics100 homes0.3 MW2023-112.7 yrs
Manor Park, Twycross - Solar Photovoltaic PanelsSolar Photovoltaics100 homes0.2 MW2021-094.9 yrs

Plus 6 more approved within the last two years.

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →