Hamble Valley has 8.3 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 3,000 homes. Britain's grid bottlenecks still add to bills here: about £116 a year per household, £4.9m across the constituency's 42,337 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
8.3 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 3,000 homes. Approved at least two years ago; waiting on the grid, not on planning. That is 0.5× the renewable capacity actually running here.
9 projects · planning database (REPD), July 2026 · how we worked this out
£4.9m
is what the grid gap costs this constituency's 42,337 households in a year between them — £116 each, about 65 days of one home's electricity.
The £116 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

6 of 9 waiting projects · years since approval
Unit 1, Strategic Park, Comines Way - Solar Panels 0.3 MW
4.2 YRS
Concorde Way, Segensworth - Solar Panels 1 MW
3.9 YRS
Fusion, Parkway - Solar Panels 0.2 MW
3.4 YRS
Fusion, Parkway - Solar Panels 0.2 MW
3.4 YRS
National Air Traffic Services, Sopwith Way - Solar Panels 1 MW
3.2 YRS
Octagon House, Concorde Way - Solar Panels 0.4 MW
2.9 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
ATS, Sopwith Way - Ground Mounted Solar Photovoltaic ArraysNo/ Nats, Sopwith Way, SouthamptonSolar Photovoltaics1,200 homes3.3 MW2024-062.4 yrs
CooperVision, Ensign Way - Solar PanelsCooper Vision, South Point 3 And 4, Ensign Way, SouthamptonSolar Photovoltaics500 homes1.4 MW2024-092.2 yrs
Concorde Way, Segensworth - Solar PanelsTurbomeca UK Concorde Way Segensworth FarehamSolar Photovoltaics400 homes1.0 MW2022-113.9 yrs
National Air Traffic Services, Sopwith Way - Solar PanelsNational Air Traffic Services Limited, Sopwith Way, Swanwick, SouthamptonSolar Photovoltaics400 homes1.0 MW2023-083.2 yrs
South Point, Hamble-Le-Rice - Solar PanelsSouth Point 1 and 2, Ensign Way, Hamble Le RiceSolar Photovoltaics200 homes0.5 MW2024-092.1 yrs
Octagon House, Concorde Way - Solar PanelsOctagon House, Concorde Way, Segensworth, FarehamSolar Photovoltaics100 homes0.4 MW2023-122.9 yrs
Unit 1, Strategic Park, Comines Way - Solar PanelsUnit 1, Strategic Park, Comines Way, Hedge EndSolar Photovoltaics100 homes0.3 MW2022-094.2 yrs
Fusion, Parkway - Solar PanelsFusion 3, 1200 Parkway, FarehamSolar Photovoltaics100 homes0.2 MW2023-073.4 yrs
Fusion, Parkway - Solar PanelsFusion 1, Parkway, FarehamSolar Photovoltaics100 homes0.2 MW2023-073.4 yrs

Plus 2 more approved within the last two years.

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →

What has Paul Holmes said about the grid in Parliament? Search Hansard →

See the full league table Data (JSON)