Guildford
Guildford has 1.1 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 400 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.6m across the constituency's 38,996 homes.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| Surrey Sports Park, Richard Meyjes Road - Solar Panels | Solar Photovoltaics | 300 homes | 0.9 MW | 2023-06 | 3.1 yrs |
| Slyfield Industrial Estate, Slyfield - Solar PV System | Solar Photovoltaics | 100 homes | 0.1 MW | 2024-07 | 2.1 yrs |
Plus 2 more approved within the last two years.
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →
What has Zöe Franklin said about the grid in Parliament? Search Hansard →