Glasgow North has 20 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 7,300 homes. Britain's grid bottlenecks still add to bills here: about £116 a year per household, £5.7m across the constituency's 49,545 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
20 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 7,300 homes. Approved at least two years ago; waiting on the grid, not on planning.
5 projects · planning database (REPD), July 2026 · how we worked this out
£5.7m
is what the grid gap costs this constituency's 49,545 households in a year between them — £116 each, about 65 days of one home's electricity.
The £116 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

5 of 5 waiting projects · years since approval
Caledonian Solar Park 18 MW
3.4 YRS
Garscube Road - Solar Panels 0.5 MW
3.4 YRS
Balmore Road - Solar Panels 0.2 MW
3.3 YRS
Morrison Bowmore Distillery, Carlisle Street - Solar solar PV System 0.2 MW
3.0 YRS
Kelvin Hall Sports Arena, Argyle Street - Solar Panels 0.6 MW
2.3 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Caledonian Solar ParkLochfauld Road or Balmore RoadSolar Photovoltaics6,700 homes18.4 MW2023-063.4 yrs
Kelvin Hall Sports Arena, Argyle Street - Solar PanelsKelvin Hall Sports Arena, 1431 Argyle StreetSolar Photovoltaics200 homes0.6 MW2024-082.3 yrs
Garscube Road - Solar Panels210 Garscube RoadSolar Photovoltaics200 homes0.5 MW2023-063.4 yrs
Balmore Road - Solar Panels419 Balmore Road GlasgowSolar Photovoltaics100 homes0.2 MW2023-073.3 yrs
Morrison Bowmore Distillery, Carlisle Street - Solar solar PV SystemMorrison Bowmore Distillery 200 Carlisle StreetSolar Photovoltaics100 homes0.2 MW2023-113.0 yrs

Plus 2 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
Port of Dundas - Battery Storage90 MWapproved, not built 2026could supply ≈315,000 homes
Ravengill Energy Park - Wind Farm & Battery Energy Storage50 MWcould supply ≈175,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →

What has Martin Rhodes said about the grid in Parliament? Search Hansard →

See the full league table Data (JSON)