Gateshead Central and Whickham
Gateshead Central and Whickham has 3.4 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 1,200 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.1m across the constituency's 44,309 homes.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| Albany Road - Solar Array | Solar Photovoltaics | 700 homes | 2.0 MW | 2021-12 | 4.6 yrs |
| Metrocentre, St Michaels Way - Solar Panels | Solar Photovoltaics | 300 homes | 0.7 MW | 2023-08 | 2.9 yrs |
| Queen Elizabeth Avenue, Sheriff Hill - Solar Arrays | Solar Photovoltaics | 200 homes | 0.5 MW | 2022-04 | 4.3 yrs |
| Riverdale Paper, Earlsway - Solar Panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2022-11 | 3.7 yrs |
| Metrocentre Green Car Park, St Michaels Way - Photovoltaic Equipment | Solar Photovoltaics | — | — MW | 2023-01 | 3.6 yrs |
Plus 2 more approved within the last two years.
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →
What has Mark Ferguson said about the grid in Parliament? Search Hansard →