Gainsborough
Gainsborough has 583 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 212,000 homes. No wind farm here is paid to switch off. Almost every pound of that money goes to wind farms in Scotland, held back by the crowded wires at the border. The cost is shared across every bill in Britain, so households here pay too: about £92 a year per household, £3.9m across the constituency's 42,345 homes.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| Gate Burton - Solar & Energy Storage Park | Solar Photovoltaics | 193,000 homes | 531.0 MW | 2024-07 | 2.1 yrs |
| The Old Airfield Solar Photovoltaic Farm | Solar Photovoltaics | 18,000 homes | 49.9 MW | 2021-05 | 5.2 yrs |
| A Poucher & Sons, Lodge Farm - Solar Panels | Solar Photovoltaics | 300 homes | 0.8 MW | 2023-12 | 2.7 yrs |
| Gainsborough Educational Village, Sweyn Lane - Solar PV Panels | Solar Photovoltaics | 200 homes | 0.5 MW | 2023-12 | 2.6 yrs |
| David Lloyd Leisure, Burton Waters - Solar PV Panels | Solar Photovoltaics | 100 homes | 0.3 MW | 2023-08 | 2.9 yrs |
| Ping Europe Limited, Corringham Road - Solar Array | Solar Photovoltaics | 100 homes | 0.3 MW | 2023-03 | 3.4 yrs |
| River Cottage, Scampton - Solar Panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2022-07 | 4.0 yrs |
| Harvest Pet Products Limited - Solar Panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2022-08 | 4.0 yrs |
Plus 10 more approved within the last two years.
Batteries
| Site | Size | Status | While discharging |
|---|---|---|---|
| Barfield Lane, Reepham - Battery Energy Storage System | 53 MW | in planning | could supply ≈186,000 homes |
| West Burton Solar Project | 20 MW | approved, not built 2025 | could supply ≈70,000 homes |
| Leverton Farm - Energy Barn | 10 MW | could supply ≈35,000 homes | |
| Marton Sewage Works, High Street - Battery Energy Storage | 10 MW | in planning | could supply ≈35,000 homes |
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
What has Sir Edward Leigh said about the grid in Parliament? Search Hansard →