Foyle
Foyle has no significant clean power approved and waiting to be built, and none running. Northern Ireland is on the all-Ireland grid, so Britain's grid bottlenecks do not reach bills here in the same way.
here
grid
Batteries
| Site | Size | Status | While discharging |
|---|---|---|---|
| Coolkeeragh - Battery Storage | 140 MW | approved, not built 2024 | could supply ≈491,000 homes |
| Maydown Road - Battery Energy Storage System | 140 MW | in planning | could supply ≈491,000 homes |
| Mullaghmeash Road & Feeny - Battery Energy Storage | 100 MW | in planning | could supply ≈350,000 homes |
| Battery Energy Storage Facility in Londonderry | 34 MW | approved, not built 2024 | could supply ≈119,000 homes |
| Battery Energy Storage Facility Development in Derry | 17 MW | approved, not built 2025 | could supply ≈60,000 homes |
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →