No.188 of 650 · approved, not built MP: Chris Coghlan (Liberal Democrat) England

Dorking and Horley

Dorking and Horley has 27 MW of clean power (almost all solar) approved and still not built: enough to supply a year's electricity to 9,800 homes. Britain's grid bottlenecks still add to bills here: about £116 a year per household, £4.5m across the constituency's 39,123 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
27 MW
of clean power — almost all solar — approved and still not built, enough to supply a year's electricity to 9,800 homes. Approved at least two years ago; waiting on the grid, not on planning.
4 projects · 26 MW solar, 0.2 MW hydro · planning database (REPD), July 2026 · how we worked this out
£4.5m
is what the grid gap costs this constituency's 39,123 households in a year between them — £116 each, about 65 days of one home's electricity.
The £116 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

4 of 4 waiting projects · years since approval
Betchworth Weir 0.2 MW
7.3 YRS
Bucher Municipal, Curtis Road - Solar Panels 0.2 MW
3.8 YRS
Surrey Hills Business Park, Sheephouse Lane - Solar Panels 0.2 MW
3.1 YRS
Duxhurst Farm, Duxhurst Lane - Solar Farm 26 MW
2.9 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Duxhurst Farm, Duxhurst Lane - Solar FarmDuxhurst Farm Duxhurst Lane SidlowSolar Photovoltaics9,400 homes26.0 MW2023-122.9 yrs
Betchworth WeirBetchworth House, The Street, Betchworth, SurreySmall Hydro200 homes0.2 MW2019-077.3 yrs
Bucher Municipal, Curtis Road - Solar PanelsBucher Municiple, Curtis Road, Dorking, DorkingSolar Photovoltaics100 homes0.2 MW2023-023.8 yrs
Surrey Hills Business Park, Sheephouse Lane - Solar PanelsSurrey Hills Business Park, Sheephouse Lane, Wotton, DorkingSolar Photovoltaics100 homes0.2 MW2023-093.1 yrs

Plus 3 more approved within the last two years.

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →