Chichester
Chichester has 19 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 6,800 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.2m across the constituency's 45,526 homes.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| Ferry Farm - Solar array | Solar Photovoltaics | 4,000 homes | 11.0 MW | 2021-11 | 4.7 yrs |
| Sefter Farm, Pagham Road - Solar Panels | Solar Photovoltaics | 700 homes | 2.0 MW | 2023-09 | 2.9 yrs |
| Natures Way Food, Chichester Road - Solar Panels | Solar Photovoltaics | 700 homes | 1.8 MW | 2024-07 | 2.1 yrs |
| Baker Barracks Solar Development | Solar Photovoltaics | 500 homes | 1.5 MW | 2021-02 | 5.4 yrs |
| Chichester Food Park, Runcton Unit - Solar Panels | Solar Photovoltaics | 500 homes | 1.3 MW | 2024-07 | 2.1 yrs |
| Ham Farm, Bosham - Solar Panels | Solar Photovoltaics | 100 homes | 0.4 MW | 2024-04 | 2.3 yrs |
| Bartholomews, Merston Oving - Solar Array | Solar Photovoltaics | 100 homes | 0.3 MW | 2022-06 | 4.1 yrs |
| Teknoflex, Quarry Lane - Solar Panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2022-10 | 3.8 yrs |
| Walton Barn - Solar Panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2024-04 | 2.3 yrs |
| Via Ravenna - Solar Panel | Solar Photovoltaics | 100 homes | 0.2 MW | 2022-04 | 4.3 yrs |
Plus 3 more approved within the last two years.
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →
What has Jess Brown-Fuller said about the grid in Parliament? Search Hansard →