No.306 of 650 · approved, not built MP: Samantha Dixon (Labour) England

Chester North and Neston

Chester North and Neston has 3.1 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 1,100 homes. Britain's grid bottlenecks still add to bills here: about £116 a year per household, £4.8m across the constituency's 41,601 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
3.1 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 1,100 homes. Approved at least two years ago; waiting on the grid, not on planning. That is 2.6× the renewable capacity actually running here.
9 projects · planning database (REPD), July 2026 · how we worked this out
£4.8m
is what the grid gap costs this constituency's 41,601 households in a year between them — £116 each, about 65 days of one home's electricity.
The £116 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

6 of 9 waiting projects · years since approval
Victoria Road - Solar Panels 0.1 MW
5.1 YRS
Mill Lane - Solar System 0.3 MW
4.6 YRS
City Road - Solar panel 1 MW
4.3 YRS
Big Storage Self Storage, Sealand Road - Solar Panels 0.2 MW
4.0 YRS
Urenco Uk Limited, Capenhurst Lane - Solar Panels 0.2 MW
3.3 YRS
Inchcape Volkswagen Chester, Sealand Road - Solar PV System 0.4 MW
3.2 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
City Road - Solar panelBelong Chester 36 City Road , ChesterSolar Photovoltaics400 homes1.0 MW2022-074.3 yrs
Inchcape Volkswagen Chester, Sealand Road - Solar PV SystemInchcape Volkswagen Chester, Sealand Road, ChesterSolar Photovoltaics100 homes0.4 MW2023-083.2 yrs
Sainsburys, Caldy Valley Road - Solar PanelsSainsburys, Caldy Valley Road, Great Boughton, ChesterSolar Photovoltaics100 homes0.4 MW2024-032.6 yrs
Mill Lane - Solar SystemMorrisons Mill Lane Upton ChesterSolar Photovoltaics100 homes0.3 MW2022-044.6 yrs
Chester Gates - Solar PanelsUnit 1A Chester GatesSolar Photovoltaics100 homes0.3 MW2024-012.9 yrs
Urenco Uk Limited, Capenhurst Lane - Solar PanelsCapenhurst Lane, Capenhurst, ChesterSolar Photovoltaics100 homes0.2 MW2023-073.3 yrs
Bumpers Lane - Solar Array2 Bumpers Lane, ChesterSolar Photovoltaics100 homes0.2 MW2024-102.1 yrs
Big Storage Self Storage, Sealand Road - Solar PanelsThe Printworks, Big Storage Self Storage Sealand RoadSolar Photovoltaics100 homes0.2 MW2022-104.0 yrs
Victoria Road - Solar PanelsNorthgate Arena Leisure Centre, Victoria Road, ChesterSolar Photovoltaics100 homes0.1 MW2021-105.1 yrs

Plus 2 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
Mollington - Battery Energy Storage240 MWapproved, not built 2026could supply ≈841,000 homes
Rectory Lane - Energy Storage System200 MWapproved, not built 2025could supply ≈701,000 homes
Capenhurst Lane, Capenhurst - Battery Storage100 MWapproved, not built 2023could supply ≈350,000 homes
National Grid Electricity Substation, Capenhurst Lane - Battery Storage100 MWoperating 2021could supply ≈350,000 homes
Native River57 MWoperating 2021could supply ≈200,000 homes
Capenhurst Lane, Capenhurst - Battery storage57 MWbeing built 2022could supply ≈200,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →