Central Suffolk and North Ipswich has 177 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 64,000 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.6m across the constituency's 39,508 homes.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| Tye Lane - Solar Farm | Solar Photovoltaics | 18,000 homes | 49.9 MW | 2023-12 | 2.6 yrs |
| New Road Solar Farm | Solar Photovoltaics | 18,000 homes | 49.9 MW | 2021-10 | 4.8 yrs |
| Church Farm, The Channel - Bramford Solar Farm and Battery Storage | Solar Photovoltaics | 18,000 homes | 49.9 MW | 2023-09 | 2.9 yrs |
| Park Farm - Solar Panels | Solar Photovoltaics | 7,600 homes | 21.0 MW | 2024-06 | 2.1 yrs |
| Masons Landfill, Bramford Road, Great Blakenham - Solar Farm | Solar Photovoltaics | 2,200 homes | 6.1 MW | 2024-03 | 2.4 yrs |
| White House Road - Solar PV System | Solar Photovoltaics | 100 homes | 0.2 MW | 2023-09 | 2.9 yrs |
Plus 1 more approved within the last two years.
Batteries
| Site | Size | Status | While discharging |
|---|---|---|---|
| Bullen Lane, Bramford - Battery Energy Storage | 400 MW | approved, not built 2025 | could supply ≈1,402,000 homes |
| Bullen Lane - Battery Storage | 100 MW | being built 2022 | could supply ≈350,000 homes |
| Bramford Substation | 57 MW | 2021 | could supply ≈200,000 homes |
| Greybarn Solar Energy Farm | 55 MW | in planning | could supply ≈193,000 homes |
| Kettleburgh Road Easton - Solar Panels & Battery Storage | 50 MW | in planning | could supply ≈175,000 homes |
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →
What has Patrick Spencer said about the grid in Parliament? Search Hansard →