No.183 of 650 · approved, not built MP: Stephen Doughty (Labour (Co-op)) Wales

Cardiff South and Penarth

Cardiff South and Penarth has 25 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 9,000 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.9m across the constituency's 42,951 homes. A 50 MW battery was refused planning here in 2025; while discharging it could have supplied about 175,000 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
25 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 9,000 homes. Approved at least two years ago; waiting on the grid, not on planning. That is 2.2× the renewable capacity actually running here.
7 projects · planning database (REPD), July 2026 · how we worked this out
£3.9m
is what the grid gap costs this constituency's 42,951 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

6 of 7 waiting projects · years since approval
University Hospital, Penlan Road - Solar Arrays 0.7 MW
3.8 YRS
Brynwell Farm 21 MW
3.7 YRS
Portmanmoor Road Industrial Estate, Portmanmoor Road - Solar Panels 0.4 MW
3.1 YRS
Techniquest, Stuart Street - Solar Panels 0.2 MW
3.0 YRS
Momentive Speciality Chemicals, Sully Moors Road - Solar Panels 1.3 MW
3.0 YRS
The Maltings East, Tyndall Street - Solar Panels 0.6 MW
2.7 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Brynwell FarmSolar Photovoltaics7,600 homes21.0 MW2022-113.7 yrs
Momentive Speciality Chemicals, Sully Moors Road - Solar PanelsSolar Photovoltaics500 homes1.3 MW2023-073.0 yrs
University Hospital, Penlan Road - Solar ArraysSolar Photovoltaics300 homes0.7 MW2022-103.8 yrs
Llandough Hospital, Llandough - Solar PanelsSolar Photovoltaics300 homes0.7 MW2024-022.5 yrs
The Maltings East, Tyndall Street - Solar PanelsSolar Photovoltaics200 homes0.6 MW2023-112.7 yrs
Portmanmoor Road Industrial Estate, Portmanmoor Road - Solar PanelsSolar Photovoltaics100 homes0.4 MW2023-063.1 yrs
Techniquest, Stuart Street - Solar PanelsSolar Photovoltaics100 homes0.2 MW2023-073.0 yrs

Plus 2 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
Rover Way, Splott - Energy Park & Data Centre1,000 MWapproved, not built 2025could supply ≈3,504,000 homes
Pen Y Maes, Ashby Road - Battery Energy Storage50 MWrefused 2025could supply ≈175,000 homes
Sully Moors Road - Battery Energy Storage Facility50 MWapproved, not built 2026could supply ≈175,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →

What has Stephen Doughty said about the grid in Parliament? Search Hansard →