Calder Valley
Calder Valley has 1.4 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 500 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £92 a year per household, £4.1m across the constituency's 44,850 homes.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| Sandholme Iron Works, Halifax Road - Solar Panels | Solar Photovoltaics | 300 homes | 0.8 MW | 2024-02 | 2.4 yrs |
| Lowfields Business Park, Lowfields Way - Solar Panels | Solar Photovoltaics | 200 homes | 0.6 MW | 2023-08 | 2.9 yrs |
Plus 1 more approved within the last two years.
Batteries
| Site | Size | Status | While discharging |
|---|---|---|---|
| Ashday Hall Farm, Ashday Lane - Battery Energy Storage | 65 MW | approved, not built 2025 | could supply ≈228,000 homes |
| Lowfields Energy Storage Project | 50 MW | approved, not built 2023 | could supply ≈175,000 homes |
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →
What has Josh Fenton-Glynn said about the grid in Parliament? Search Hansard →