Bridgend
Bridgend has 41 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 15,000 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £116 a year per household, £4.7m across the constituency's 40,589 homes.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| Ty’n y Waun - Solar Farm (Bridgend Energy Hub)Btw Heol Laethog and Heol Y Cyw, Bridgend | Solar Photovoltaics | 15,000 homes | 40.0 MW | 2024-10 | 2.1 yrs |
| SAS International, Unit 1 - Solar PV PanelsSAS International Parc Crescent Waterton Industrial Estate, Bridgend | Solar Photovoltaics | 300 homes | 0.8 MW | 2021-10 | 5.0 yrs |
Plus 1 more approved within the last two years.
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →
What has Chris Elmore said about the grid in Parliament? Search Hansard →