Bradford West
Bradford West has 2.3 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 800 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.6m across the constituency's 39,290 homes.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| Morrisons, Thornton Road - Solar PV Panels | Solar Photovoltaics | 300 homes | 0.9 MW | 2022-03 | 4.4 yrs |
| University of Bradford, Richmond Road - Solar Panels | Solar Photovoltaics | 100 homes | 0.4 MW | 2022-11 | 3.8 yrs |
| Bradford Girls Grammar School, Squire Lane - Solar Panels | Solar Photovoltaics | 100 homes | 0.3 MW | 2024-04 | 2.3 yrs |
| Clayton Ce Primary School - Solar Panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2024-01 | 2.6 yrs |
| The University Of Bradford Stadium - Solar Panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2024-02 | 2.5 yrs |
| Bradford Girls Grammar School, Squire Lane - Solar panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2024-07 | 2.1 yrs |
| St James Church Primary School, Chelwood Drive - Solar Photovoltaic Panels | Solar Photovoltaics | 100 homes | 0.1 MW | 2024-01 | 2.6 yrs |
Batteries
| Site | Size | Status | While discharging |
|---|---|---|---|
| Bradford West, Harrop Lane, Wilsden - Battery Storage | 100 MW | approved, not built 2023 | could supply ≈350,000 homes |
| Peat Dykes Farm, Harrop Lane - Battery Energy Storage System | 100 MW | approved, not built 2026 | could supply ≈350,000 homes |
| Old Allen Road, Wilsden - Battery Energy Storage System | 100 MW | in planning | could supply ≈350,000 homes |
| Midland Road - Battery Energy Storage | 80 MW | approved, not built 2024 | could supply ≈280,000 homes |
| Bradford West Substation (Harrop Edge Farm) | 50 MW | being built 2020 | could supply ≈175,000 homes |
| Stor Generation Plant - Battery Storage | 12 MW | approved, not built 2025 | could supply ≈42,000 homes |
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →