No.45 of 650 · approved, not built MP: Richard Tice (Reform UK) England

Boston and Skegness

Boston and Skegness has 125 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 46,000 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £92 a year per household, £4.6m across the constituency's 50,378 homes. There is also 29 MW of wind running here on the local network. If that gets switched off, no national record shows it.

Not visible
here
29 MW of wind is running in this constituency, but it sits on the local network rather than the national grid — so if it is paid to switch off, no national record shows it. That is why this seat has no figure here: not because nothing happens, but because nobody publishes it. The £ figure for this seat is a floor, not a zero.
125 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 46,000 homes. Approved at least two years ago; waiting on the grid, not on planning. That is 1.1× the renewable capacity actually running here.
12 projects · planning database (REPD), July 2026 · how we worked this out
£4.6m
is what the grid gap costs this constituency's 50,378 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

3 of 12 waiting projects · years since approval
Low Farm Solar Farm 50 MW
5.4 YRS
Mallows Lane - Solar Farm & Battery Storage 10 MW
3.6 YRS
Vicarage Drove - Solar farm & Battery storage 50 MW
2.5 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Low Farm Solar FarmSolar Photovoltaics18,000 homes49.9 MW2021-035.4 yrs
Vicarage Drove - Solar farm & Battery storageSolar Photovoltaics18,000 homes49.9 MW2024-012.5 yrs
Mallows Lane - Solar Farm & Battery StorageSolar Photovoltaics3,600 homes10.0 MW2022-123.6 yrs
Boston Landfill, Wyberton - Solar PV ArraySolar Photovoltaics3,500 homes9.7 MW2022-014.5 yrs
Marsh Farm, Sea Lane - Solar ArraySolar Photovoltaics700 homes1.9 MW2023-053.2 yrs
The Hollies Solar Park - Skegness - extensionSolar Photovoltaics500 homes1.4 MW2013-1212.7 yrs
Riverside Industrial Estate - Solar PV PanelsSolar Photovoltaics300 homes0.9 MW2022-064.1 yrs
Greenyard Frozen, Marsh Lane - Solar PanelsSolar Photovoltaics200 homes0.5 MW2023-053.2 yrs
Southview Leisure Park, Burgh Road - Solar panelsSolar Photovoltaics100 homes0.4 MW2024-062.1 yrs
TB Containers Limited, Brenton Villa - Solar PanelsSolar Photovoltaics100 homes0.4 MW2023-013.5 yrs
Station Road, Swineshead - Solar PV SystemSolar Photovoltaics100 homes0.2 MW2021-124.6 yrs
E & M Hames, Hawthorn Road - Solar PanelsSolar Photovoltaics100 homes0.2 MW2024-012.5 yrs

Plus 1 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
Bicker Fen Bess, Vicarage Drove - Battery Storage400 MWapproved, not built 2025could supply ≈1,402,000 homes
Bicker Drove - Battery Energy Storage System100 MWapproved, not built 2025could supply ≈350,000 homes
Vicarage Drove - Solar farm & Battery storage20 MWapproved, not built 2024could supply ≈72,000 homes
Manor Farm Energy Storage10 MWapproved, not built 2017could supply ≈35,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →

What has Richard Tice said about the grid in Parliament? Search Hansard →

See the full league table Data (JSON)