Blackpool North and Fleetwood
Blackpool North and Fleetwood has 1 MW of renewables running, enough for 500 homes over a year, and nothing large waiting in the planning queue. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.0m across the constituency's 43,949 homes.
here
Batteries
| Site | Size | Status | While discharging |
|---|---|---|---|
| Bristol Avenue - Battery Energy Storage Facility | 25 MW | approved, not built 2021 | could supply ≈88,000 homes |
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →
What has Lorraine Beavers said about the grid in Parliament? Search Hansard →