No.322 of 650 · approved, not built MP: Ayoub Khan (Independent) England

Birmingham Perry Barr

Birmingham Perry Barr has 2.4 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 900 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.6m across the constituency's 39,446 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
2.4 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 900 homes. Approved at least two years ago; waiting on the grid, not on planning.
8 projects · planning database (REPD), July 2026 · how we worked this out
£3.6m
is what the grid gap costs this constituency's 39,446 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

6 of 8 waiting projects · years since approval
Altitude, Deykin Avenue - Solar Panels
3.8 YRS
Farrow Road Industrial Estate, Farrow Road - Solar Panels 0.2 MW
3.3 YRS
Tameside Drive, Holford Industrial Estate - Solar Panels 1 MW
3.3 YRS
Estone Drive, Aston - Solar Pv Panels 0.3 MW
3.0 YRS
Perry Barr Bus Depot, Wellhead Road - Solar Pv Panels 0.2 MW
2.9 YRS
David Lloyd Leisure Centre, Shady Lane - Solar Panels 0.3 MW
2.4 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Tameside Drive, Holford Industrial Estate - Solar PanelsSolar Photovoltaics400 homes1.0 MW2023-043.3 yrs
Estone Drive, Aston - Solar Pv PanelsSolar Photovoltaics100 homes0.3 MW2023-073.0 yrs
David Lloyd Leisure Centre, Shady Lane - Solar PanelsSolar Photovoltaics100 homes0.3 MW2024-032.4 yrs
Perry Barr Bus Depot, Wellhead Road - Solar Pv PanelsSolar Photovoltaics100 homes0.2 MW2023-092.9 yrs
Holyhead Road - Roof Mounted Solar PV solar panelsSolar Photovoltaics100 homes0.2 MW2024-072.0 yrs
Farrow Road Industrial Estate, Farrow Road - Solar PanelsSolar Photovoltaics100 homes0.2 MW2023-043.3 yrs
Barr View Primary And Nursery Academy, Aldridge Road - Solar PV SystemsSolar Photovoltaics100 homes0.2 MW2024-052.2 yrs
Altitude, Deykin Avenue - Solar PanelsSolar Photovoltaics— MW2022-103.8 yrs

Plus 3 more approved within the last two years.

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →

What has Ayoub Khan said about the grid in Parliament? Search Hansard →

See the full league table Data (JSON)