No.546 of 650 · approved, not built MP: Daniel Francis (Labour) England

Bexleyheath and Crayford

Bexleyheath and Crayford has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.5m across the constituency's 37,938 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
0.2 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 100 homes. Approved at least two years ago; waiting on the grid, not on planning.
1 project · planning database (REPD), July 2026 · how we worked this out
£3.5m
is what the grid gap costs this constituency's 37,938 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

1 of 1 waiting projects · years since approval
Bexleyheath Superbowl, Albion Road - Solar Panels 0.2 MW
2.8 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Bexleyheath Superbowl, Albion Road - Solar PanelsSolar Photovoltaics100 homes0.2 MW2023-102.8 yrs

Plus 1 more approved within the last two years.

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →