Bexhill and Battle
Bexhill and Battle has 1.9 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 700 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.7m across the constituency's 40,145 homes.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| Park Pale House, Mountfield Lane - Solar Panel Array | Solar Photovoltaics | 400 homes | 1.2 MW | 2024-04 | 2.3 yrs |
| Darvell Bruderhof Community, Brightling Road - Solar Panels | Solar Photovoltaics | 200 homes | 0.5 MW | 2022-11 | 3.7 yrs |
| Marley Lane - Solar Panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2024-01 | 2.6 yrs |
| Robertsbridge Works Solar Panels | Solar Photovoltaics | — | — MW | 2021-09 | 4.9 yrs |
Plus 4 more approved within the last two years.
Batteries
| Site | Size | Status | While discharging |
|---|---|---|---|
| Moor Hall Farm, Moor Hall Drive - Battery Energy Storage Facility | 400 MW | approved, not built 2025 | could supply ≈1,402,000 homes |
| Eastlands Farm, Catsfield - Catsfield Battery Energy Storage Facility | 240 MW | approved, not built 2025 | could supply ≈841,000 homes |
| Pashley Farm, Ninfield Road - Battery Energy Storage System | 130 MW | in planning | could supply ≈456,000 homes |
| Catsfield Christmas Tree Farm, The Stream - Battery Energy Storage System | 100 MW | in planning | could supply ≈350,000 homes |
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →
What has Dr Kieran Mullan said about the grid in Parliament? Search Hansard →