No.176 of 650 · approved, not built MP: Linsey Farnsworth (Labour) England

Amber Valley

Amber Valley has 28 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 10,000 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.7m across the constituency's 40,413 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
28 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 10,000 homes. Approved at least two years ago; waiting on the grid, not on planning.
7 projects · planning database (REPD), July 2026 · how we worked this out
£3.7m
is what the grid gap costs this constituency's 40,413 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

6 of 7 waiting projects · years since approval
Meadow Lane Solar Farm 20 MW
4.8 YRS
SC Johnson, Denby - Solar Panels 0.6 MW
3.9 YRS
Factory Tencate Advanced Composites Limited, Amber Drive - Solar Panels 0.5 MW
3.6 YRS
Guilford Europe, Cotes Park Lane - Solar Panels 2.4 MW
3.3 YRS
Alfreton Leisure Centre Car Park, Church Street - Solar Panels 0.4 MW
2.9 YRS
Ripley Leisure Centre, Derby Road - Solar PV Panels 0.2 MW
2.9 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Meadow Lane Solar FarmSolar Photovoltaics7,100 homes19.6 MW2021-104.8 yrs
Hl Plastics Extrusions, Flamstead House Hall Road - Solar PanelsSolar Photovoltaics1,500 homes4.1 MW2024-042.3 yrs
Guilford Europe, Cotes Park Lane - Solar PanelsSolar Photovoltaics900 homes2.4 MW2023-043.3 yrs
SC Johnson, Denby - Solar PanelsSolar Photovoltaics200 homes0.6 MW2022-093.9 yrs
Factory Tencate Advanced Composites Limited, Amber Drive - Solar PanelsSolar Photovoltaics200 homes0.5 MW2022-123.6 yrs
Alfreton Leisure Centre Car Park, Church Street - Solar PanelsSolar Photovoltaics100 homes0.4 MW2023-092.9 yrs
Ripley Leisure Centre, Derby Road - Solar PV PanelsSolar Photovoltaics100 homes0.2 MW2023-092.9 yrs

Plus 5 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
Heanor Road - Battery Energy Storage System40 MWapproved, not built 2025could supply ≈140,000 homes
Derby Road - Battery Energy Storage System40 MWcould supply ≈140,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →