No.18 OF 650 · APPROVED, NOT BUILT MP: Seamus Logan (Scottish National Party) Scotland

Aberdeenshire North and Moray East

Aberdeenshire North and Moray East has 215 MW of clean power (almost all solar) approved and still not built: enough to supply a year's electricity to 88,000 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £92 a year per household, £4.2m across the constituency's 45,246 homes. There is also 121 MW of wind running here on the local network. If that gets switched off, no national record shows it. A 50 MW battery was refused planning here in 2025; while discharging it could have supplied about 175,000 homes.

Not visible
here
121 MW of wind is running in this constituency, but it sits on the local network rather than the national grid — so if it is paid to switch off, no national record shows it. That is why this seat has no figure here: not because nothing happens, but because nobody publishes it. The £ figure for this seat is a floor, not a zero.
215 MW
of clean power — almost all solar — approved and still not built, enough to supply a year's electricity to 88,000 homes — about as many homes as this constituency has. Approved at least two years ago; waiting on the grid, not on planning. That is 1.8× the renewable capacity actually running here.
17 projects · 196 MW solar, 19 MW onshore wind · planning database (REPD), July 2026 · how we worked this out
£4.2m
is what the grid gap costs this constituency's 45,246 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

6 of 17 waiting projects · years since approval
Lurg Hill Wind Farm 15 MW
7.4 YRS
Bilbo Solar Farm 37 MW
6.7 YRS
Hillhead Of Gask, Longhaven - Solar Array 14 MW
4.3 YRS
Fraserburgh Road - Kirkton Solar PV Farm & Energy Storage Facility 50 MW
3.6 YRS
Frodo Solar and Battery Energy Development 60 MW
3.2 YRS
Denhead - Solar Array 25 MW
2.3 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Frodo Solar and Battery Energy DevelopmentSolar Photovoltaics22,000 homes60.1 MW2023-053.2 yrs
Fraserburgh Road - Kirkton Solar PV Farm & Energy Storage FacilitySolar Photovoltaics18,000 homes50.0 MW2022-123.6 yrs
Bilbo Solar FarmSolar Photovoltaics13,000 homes36.6 MW2019-116.7 yrs
Denhead - Solar ArraySolar Photovoltaics9,100 homes25.0 MW2024-042.3 yrs
Lurg Hill Wind FarmWind Onshore13,000 homes15.0 MW2019-027.4 yrs
Hillhead Of Gask, Longhaven - Solar ArraySolar Photovoltaics5,200 homes14.2 MW2022-044.3 yrs
St Fergus Renewable Energy ParkSolar Photovoltaics1,800 homes5.0 MW2021-075.0 yrs
St Fergus Renewable Energy ParkWind Onshore2,600 homes3.0 MW2021-075.0 yrs
Bruxiehall FarmSolar Photovoltaics700 homes2.0 MW2015-1110.7 yrs
Wastewater Treatment Works, FraserburghSolar Photovoltaics400 homes1.0 MW2020-125.6 yrs
Little Byth Wind Turbines, New Byth - Wind TurbineWind Onshore900 homes1.0 MW2023-073.1 yrs
Mcrae Seafoods, Watermill Road - Solar ArraySolar Photovoltaics300 homes0.8 MW2023-122.7 yrs
Laeso Fish, Damhead Circle - Solar PanelsSolar Photovoltaics100 homes0.3 MW2023-043.3 yrs
Lunar Freezing & Cold Storage, Sandhaven Road - Solar panelsSolar Photovoltaics100 homes0.3 MW2022-093.9 yrs
G & J Jack, Harbour Road - Solar PanelsSolar Photovoltaics100 homes0.2 MW2023-082.9 yrs
Henderson Road - Solar PanelsSolar Photovoltaics100 homes0.2 MW2022-034.4 yrs
Hallmoss Workshop, Inverallochy - Solar PanelsSolar Photovoltaics100 homes0.2 MW2021-124.6 yrs

Plus 6 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
Greystone, Blackhills - Battery Energy Storage System500 MWcould supply ≈1,752,000 homes
Flushing, Longside - Battery Energy Storage System400 MWcould supply ≈1,402,000 homes
Netherton, Langside Road - Battery Energy Storage System400 MWcould supply ≈1,402,000 homes
Gibson Farm, Blackhillock - Battery Energy Storage System349 MWapproved, not built 2025could supply ≈1,223,000 homes
Blackhillock Electricity Substation - Battery Energy Storage System300 MWbeing built 2022could supply ≈1,051,000 homes
Salamander Offshore Wind Farm - Battery Storage and Onshore Connection180 MWapproved, not built 2025could supply ≈631,000 homes
Aultmore Forest - Buckie - Windfarm50 MWcould supply ≈175,000 homes
Electricity Sub Station, Strichen - Battery Storage Facility50 MWapproved, not built 2022could supply ≈175,000 homes
Frodo Solar and Battery Energy Development50 MWapproved, not built 2023could supply ≈175,000 homes
Greenbank Caravan & Trailers, Hillhead Of Phingask - Battery Storage50 MWapproved, not built 2023could supply ≈175,000 homes
Whitestones Birks Farm, Longmanhill - BESS50 MWrefused 2025could supply ≈175,000 homes
Smiddyhill, Strichen - Battery Energy Storage50 MWcould supply ≈175,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →

What has Seamus Logan said about the grid in Parliament? Search Hansard →

See the full league table Data (JSON)