No.272 of 650 · approved, not built MP: Douglas Lumsden (Conservative) Scotland

Aberdeen South

Aberdeen South has 4.2 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 1,500 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £5.1m across the constituency's 55,629 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
4.2 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 1,500 homes. Approved at least two years ago; waiting on the grid, not on planning.
10 projects · planning database (REPD), July 2026 · how we worked this out
£5.1m
is what the grid gap costs this constituency's 55,629 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

6 of 10 waiting projects · years since approval
Peterseat Drive - Solar PV Panels
4.6 YRS
North East Scotland College - Solar panels 0.2 MW
4.4 YRS
North East Scotland College - Solar Panels 0.3 MW
4.4 YRS
Ithaca Energy, Hill Of Rubislaw - Solar Panels 0.2 MW
3.9 YRS
First Aberdeen, King Street - Solar Array 0.2 MW
3.3 YRS
Joseph Robertson Limited, Sinclair Road - Solar Panels 0.3 MW
3.2 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Nigg Waste Water Plant, Coast Road - Solar PV ArraysSolar Photovoltaics400 homes1.1 MW2023-092.9 yrs
Airyhall Distribution Service Reservoir, St Johns Terrace - Solar PanelsSolar Photovoltaics400 homes1.1 MW2023-092.9 yrs
Pitfodels House, North Deeside Road - Solar panelsSolar Photovoltaics200 homes0.6 MW2024-012.6 yrs
David Lloyd, Garthdee Road - Solar PanelsSolar Photovoltaics100 homes0.3 MW2024-052.2 yrs
North East Scotland College - Solar PanelsSolar Photovoltaics100 homes0.3 MW2022-034.4 yrs
Joseph Robertson Limited, Sinclair Road - Solar PanelsSolar Photovoltaics100 homes0.3 MW2023-063.2 yrs
First Aberdeen, King Street - Solar ArraySolar Photovoltaics100 homes0.2 MW2023-043.3 yrs
North East Scotland College - Solar panelsSolar Photovoltaics100 homes0.2 MW2022-034.4 yrs
Ithaca Energy, Hill Of Rubislaw - Solar PanelsSolar Photovoltaics100 homes0.2 MW2022-093.9 yrs
Peterseat Drive - Solar PV PanelsSolar Photovoltaics— MW2022-014.6 yrs

Plus 1 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
Rigifa Cove Road - Battery Storage50 MWapproved, not built 2024could supply ≈175,000 homes
Newton Of Pitfodels - Battery Storage40 MWapproved, not built 2025could supply ≈140,000 homes
A981 Fraserburgh - Battery Energy Storage25 MWapproved, not built 2022could supply ≈88,000 homes
Craigshaw Drive - Battery Storage Facility & Electric Vehicle Charging Hub20 MWapproved, not built 2024could supply ≈70,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →

What has Douglas Lumsden said about the grid in Parliament? Search Hansard →

See the full league table Data (JSON)