 "pcon24cd": "W07000088",
 "name": "Caerphilly",
 "nation": "Wales",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 20.0,
  "stuck_mw_int": 20,
  "stuck_sites": 1,
  "homes_equivalent": 7300,
  "homes_vs_seat_households": 0.18,
  "stuck_mw_12m_cut": 112.4,
  "consented_not_built_mw_any_age": 112.4,
  "operational_mw": 31.9,
  "operational_homes_equivalent": 12000,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 16.2,
  "rank": 199,
  "tech_mix": {
   "solar": 20.0
  },
  "tech_summary": "all solar",
  "waiting_vs_running": 0.6,
  "projects": [
   {
    "site_name": "Twyn Hywel Wind Farm",
    "repd_ref_id": 9468,
    "technology": "Wind Onshore",
    "capacity_mw": 92.4,
    "homes_equivalent": 81000,
    "consented": "2024-11-05",
    "months_waiting": 20.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Cwm Ivor Penyrheol Solar Farm",
    "repd_ref_id": 9398,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 20.0,
    "homes_equivalent": 7300,
    "consented": "2024-05-23",
    "months_waiting": 26.3,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 41345,
  "seat_total_gbp": 3800000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0,
  "building_mw": 0,
  "approved_mw": 0,
  "approved_24m_mw": 0,
  "refused_mw": 0,
  "submitted_mw": 0,
  "sites": []
 },
 "pipeline_projects": [
  {
   "site_name": "Twyn Hywel Wind Farm",
   "repd_ref_id": 9468,
   "technology": "Wind Onshore",
   "capacity_mw": 92.4,
   "homes_equivalent": 81000,
   "status": "Awaiting Construction",
   "consented": "2024-11-05",
   "refused": null,
   "planning_authority": "Welsh Government (NSIP)",
   "planning_ref": "DNS/3272053",
   "operator": "Bute Energy",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-11-05",
     "years_since_consent": 1.7
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Cwm Ivor Penyrheol Solar Farm",
   "repd_ref_id": 9398,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 20.0,
   "homes_equivalent": 7300,
   "status": "Awaiting Construction",
   "consented": "2024-05-23",
   "refused": null,
   "planning_authority": "Welsh Government (NSIP)",
   "planning_ref": "DNS/3266623",
   "operator": "Caerphilly County Borough Council",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-05-23",
     "years_since_consent": 2.2
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "W07000090",
  "W07000106",
  "W07000105",
  "W07000099",
  "W07000084"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}