 "pcon24cd": "S14000100",
 "name": "North East Fife",
 "nation": "Scotland",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 1.5,
   "sites": 1
  }
 },
 "number2": {
  "stuck_mw": 20.7,
  "stuck_mw_int": 21,
  "stuck_sites": 6,
  "homes_equivalent": 14000,
  "homes_vs_seat_households": 0.34,
  "stuck_mw_12m_cut": 21.1,
  "consented_not_built_mw_any_age": 21.1,
  "operational_mw": 7.1,
  "operational_homes_equivalent": 3400,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.2,
  "median_months_to_decision": 2.1,
  "rank": 196,
  "tech_mix": {
   "onshore wind": 12.3,
   "solar": 8.4
  },
  "tech_summary": "mostly onshore wind",
  "waiting_vs_running": 2.9,
  "projects": [
   {
    "site_name": "Kenly Wind Farm",
    "repd_ref_id": 6082,
    "technology": "Wind Onshore",
    "capacity_mw": 12.3,
    "homes_equivalent": 11000,
    "consented": "2016-08-25",
    "months_waiting": 119.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Banbeath Industrial Estate Solar Array",
    "repd_ref_id": 9500,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 4.2,
    "homes_equivalent": 1500,
    "consented": "2022-09-30",
    "months_waiting": 46.1,
    "status": "Under Construction"
   },
   {
    "site_name": "Uthrogle Mills - Solar Farm",
    "repd_ref_id": 13536,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 3.5,
    "homes_equivalent": 1300,
    "consented": "2023-08-15",
    "months_waiting": 35.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Clayton Caravan Park , Clayton - Solar Panel Array",
    "repd_ref_id": 15664,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2024-01-29",
    "months_waiting": 30.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Kirkmay Farm, Crail - Wind Turbine",
    "repd_ref_id": 17400,
    "technology": "Wind Onshore",
    "capacity_mw": 0.2,
    "homes_equivalent": 200,
    "consented": "2024-12-11",
    "months_waiting": 19.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Banbeath Industrial Estate",
    "repd_ref_id": 7806,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2020-04-28",
    "months_waiting": 75.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Former Madras College, Kilrymont Road - Solar panels",
    "repd_ref_id": 15414,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2024-01-30",
    "months_waiting": 30.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Priorletham Farmhouse - Solar PV Array",
    "repd_ref_id": 17278,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2024-10-22",
    "months_waiting": 21.4,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 40975,
  "seat_total_gbp": 3800000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 49.9,
  "approved_mw": 50.1,
  "approved_24m_mw": 0.0,
  "refused_mw": 12.5,
  "submitted_mw": 35.0,
  "sites": [
   {
    "site_name": "Ferrymuir",
    "capacity_mw": 49.9,
    "status": "building",
    "year": 2020,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Duniface Gas Peaking Plant - Battery Energy Storage System",
    "capacity_mw": 49.9,
    "status": "approved",
    "year": 2024,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "West Springfield Solar Farm - Solar Panels & BESS",
    "capacity_mw": 35.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 123000
   },
   {
    "site_name": "Fife Tractors, Drum Road - Battery Energy Storage",
    "capacity_mw": 12.5,
    "status": "refused",
    "year": 2025,
    "homes_while_discharging": 44000
   },
   {
    "site_name": "Micro Energy Storage, Kennoway Road - Energy Storage Battery",
    "capacity_mw": 0.2,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 700
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Ferrymuir",
   "repd_ref_id": 7371,
   "technology": "Battery",
   "capacity_mw": 49.9,
   "homes_equivalent": null,
   "status": "Under Construction",
   "consented": "2020-01-10",
   "refused": null,
   "planning_authority": "Fife",
   "planning_ref": "19/02750/FULL",
   "operator": "Gore Street Energy Storage Fund",
   "reason": {
    "reason": "connection_date",
    "label": "Its grid connection date of 2022 has passed and it is still not generating",
    "who": "the grid operator (NESO) and SP Transmission",
    "evidence": {
     "project": "Ferrymuir Energy Storage",
     "connection_date": "2022-10-31",
     "mw": 49.9,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "building"
    ]
   },
   "earliest": "2022",
   "tec": {
    "project": "Ferrymuir Energy Storage",
    "connection_date": "2022-10-31",
    "connection_year": 2022,
    "mw": 49.9,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Duniface Gas Peaking Plant - Battery Energy Storage System",
   "repd_ref_id": 15749,
   "technology": "Battery",
   "capacity_mw": 49.9,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2024-09-26",
   "refused": null,
   "planning_authority": "Fife",
   "planning_ref": "24/00713/FULL",
   "operator": "Forsa Energy Gas Holdings Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-09-26",
     "years_since_consent": 1.9
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "West Springfield Solar Farm - Solar Panels & BESS",
   "repd_ref_id": 18944,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00006134",
   "operator": "BLC Energy",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 16 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-04-02",
     "months_waiting": 16
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "West Springfield Solar Farm - Solar Panels & BESS",
   "repd_ref_id": 18945,
   "technology": "Battery",
   "capacity_mw": 35.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00006134",
   "operator": "BLC Energy",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 16 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-04-02",
     "months_waiting": 16
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Over Rankeilour Farm - Solar Farm",
   "repd_ref_id": 16630,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 29.9,
   "homes_equivalent": 11000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Fife",
   "planning_ref": "25/01330/FULL",
   "operator": "Balance Power Projects Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 14 months for a planning decision",
    "who": "Fife Council",
    "evidence": {
     "submitted": "2025-05-20",
     "months_waiting": 14
    },
    "all_matches": [
     "planning_overdue",
     "connection_date"
    ]
   },
   "earliest": "2026",
   "tec": {
    "project": "Over Rankeilour Farms PV Park",
    "connection_date": "2026-10-31",
    "connection_year": 2026,
    "mw": 29.9,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Fife Tractors, Drum Road - Battery Energy Storage",
   "repd_ref_id": 16664,
   "technology": "Battery",
   "capacity_mw": 12.5,
   "homes_equivalent": null,
   "status": "Application Refused",
   "consented": null,
   "refused": "2025-10-06",
   "planning_authority": "Fife",
   "planning_ref": "24/01082/FULL",
   "operator": "Downing Renewable Developments",
   "reason": {
    "reason": "refused",
    "label": "Refused by Fife Council in 2025",
    "who": "Fife Council",
    "evidence": {
     "refusal_date": "2025-10-06"
    },
    "all_matches": [
     "refused"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Kenly Wind Farm",
   "repd_ref_id": 6082,
   "technology": "Wind Onshore",
   "capacity_mw": 12.3,
   "homes_equivalent": 11000,
   "status": "Awaiting Construction",
   "consented": "2016-08-25",
   "refused": null,
   "planning_authority": "Fife",
   "planning_ref": "16/01425/EIA",
   "operator": "University of St Andrews",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 10 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2016-08-25",
     "years_since_consent": 9.9
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Banbeath Industrial Estate Solar Array",
   "repd_ref_id": 9500,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 4.2,
   "homes_equivalent": 1500,
   "status": "Under Construction",
   "consented": "2022-09-30",
   "refused": null,
   "planning_authority": "Fife",
   "planning_ref": "21/02380/FULL",
   "operator": "RWE Renewables UK Limited",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Uthrogle Mills - Solar Farm",
   "repd_ref_id": 13536,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 3.5,
   "homes_equivalent": 1300,
   "status": "Awaiting Construction",
   "consented": "2023-08-15",
   "refused": null,
   "planning_authority": "Fife",
   "planning_ref": "23/00993/FULL",
   "operator": "BayWa R.e Operation Services Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-08-15",
     "years_since_consent": 3.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "S14000090",
  "S14000103"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}