 "pcon24cd": "S14000097",
 "name": "Mid Dunbartonshire",
 "nation": "Scotland",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 0.0,
  "stuck_mw_int": 0,
  "stuck_sites": 0,
  "homes_equivalent": 0,
  "homes_vs_seat_households": 0.0,
  "stuck_mw_12m_cut": 0.0,
  "consented_not_built_mw_any_age": 0.0,
  "operational_mw": 0.8,
  "operational_homes_equivalent": 300,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 1.9,
  "rank": 569,
  "tech_mix": {},
  "tech_summary": null,
  "waiting_vs_running": null,
  "projects": []
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 40272,
  "seat_total_gbp": 3700000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 200.0,
  "approved_mw": 560.0,
  "approved_24m_mw": 0.0,
  "refused_mw": 0.0,
  "submitted_mw": 0.0,
  "sites": [
   {
    "site_name": "Whitehall Battery Storage",
    "capacity_mw": 560.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 1962000
   },
   {
    "site_name": "Windyhill Battery Storage Facility",
    "capacity_mw": 200.0,
    "status": "building",
    "year": 2022,
    "homes_while_discharging": 701000
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Whitehall Battery Storage",
   "repd_ref_id": 15797,
   "technology": "Battery",
   "capacity_mw": 560.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-07-22",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004982",
   "operator": "Apatura",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-07-22",
     "years_since_consent": 1.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Windyhill Battery Storage Facility",
   "repd_ref_id": 10596,
   "technology": "Battery",
   "capacity_mw": 200.0,
   "homes_equivalent": null,
   "status": "Under Construction",
   "consented": "2022-06-16",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003361",
   "operator": "Energy GridPower Ltd / Revera Energy",
   "reason": {
    "reason": "gate2",
    "label": "Cleared the grid queue review, so it now has a firm connection date",
    "who": "the grid operator (NESO)",
    "evidence": {
     "project": "WindyHill Energy Storage Facility",
     "gate2_outcome": "Cleared the grid queue review, so it now has a firm connection date"
    },
    "all_matches": [
     "gate2",
     "connection_date",
     "building"
    ]
   },
   "earliest": "2027",
   "tec": {
    "project": "WindyHill Energy Storage Facility",
    "connection_date": "2027-12-31",
    "connection_year": 2027,
    "mw": 200.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": "Cleared the grid queue review, so it now has a firm connection date",
    "source": "NESO TEC register"
   }
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "S14000086",
  "S14000085",
  "S14000089",
  "S14000072",
  "S14000106",
  "S14000105"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}