 "pcon24cd": "S14000095",
 "name": "Livingston",
 "nation": "Scotland",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 64.0,
   "sites": 3
  }
 },
 "number2": {
  "stuck_mw": 118.2,
  "stuck_mw_int": 118,
  "stuck_sites": 10,
  "homes_equivalent": 91000,
  "homes_vs_seat_households": 2.07,
  "stuck_mw_12m_cut": 118.2,
  "consented_not_built_mw_any_age": 161.5,
  "operational_mw": 116.0,
  "operational_homes_equivalent": 101000,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 3.9,
  "rank": 51,
  "tech_mix": {
   "onshore wind": 94.8,
   "solar": 23.4
  },
  "tech_summary": "mostly onshore wind",
  "waiting_vs_running": 1.0,
  "projects": [
   {
    "site_name": "Longhill Burn Wind Farm",
    "repd_ref_id": 6327,
    "technology": "Wind Onshore",
    "capacity_mw": 45.6,
    "homes_equivalent": 40000,
    "consented": "2020-04-17",
    "months_waiting": 75.5,
    "status": "Under Construction"
   },
   {
    "site_name": "Gladsmuir Hills - Wind Farm",
    "repd_ref_id": 10585,
    "technology": "Wind Onshore",
    "capacity_mw": 41.0,
    "homes_equivalent": 36000,
    "consented": "2025-10-13",
    "months_waiting": 9.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Camilty Plantation - Wind Farm",
    "repd_ref_id": 8909,
    "technology": "Wind Onshore",
    "capacity_mw": 25.8,
    "homes_equivalent": 23000,
    "consented": "2021-10-05",
    "months_waiting": 57.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Selms Muir - Solar Farm",
    "repd_ref_id": 9463,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 18.0,
    "homes_equivalent": 6500,
    "consented": "2022-09-27",
    "months_waiting": 46.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Pearie Law 2 - Wind turbines",
    "repd_ref_id": 8847,
    "technology": "Wind Onshore",
    "capacity_mw": 14.4,
    "homes_equivalent": 13000,
    "consented": "2021-12-22",
    "months_waiting": 55.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Tormywheel Wind Farm Extension",
    "repd_ref_id": 6208,
    "technology": "Wind Onshore",
    "capacity_mw": 5.0,
    "homes_equivalent": 4400,
    "consented": "2020-03-06",
    "months_waiting": 76.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Harburnhead Windfarm - Wind Turbine",
    "repd_ref_id": 11980,
    "technology": "Wind Onshore",
    "capacity_mw": 4.0,
    "homes_equivalent": 3500,
    "consented": "2023-01-23",
    "months_waiting": 42.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Nettlehill Road - Solar Panels",
    "repd_ref_id": 15820,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 2.8,
    "homes_equivalent": 1000,
    "consented": "2024-02-29",
    "months_waiting": 29.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "The Wyman Gordon Facility, Nettlehill Road- Solar Farm",
    "repd_ref_id": 11955,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 2.0,
    "homes_equivalent": 700,
    "consented": "2023-01-10",
    "months_waiting": 42.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Brewster Brothers, Drumshoreland Road - Solar Panels",
    "repd_ref_id": 14041,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 1.7,
    "homes_equivalent": 600,
    "consented": "2025-09-19",
    "months_waiting": 10.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Firth Road, Houstoun Industrial Estate - Solar Panels",
    "repd_ref_id": 20186,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.6,
    "homes_equivalent": 200,
    "consented": "2026-03-04",
    "months_waiting": 5.0,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Uphall Business Park, Uphall - Solar PV Panels",
    "repd_ref_id": 10476,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2022-03-04",
    "months_waiting": 53.0,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Maxwell Square, Brucefield - Solar Panels",
    "repd_ref_id": 14263,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2023-07-31",
    "months_waiting": 36.1,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 44193,
  "seat_total_gbp": 4100000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 20.0,
  "building_mw": 0.0,
  "approved_mw": 180.9,
  "approved_24m_mw": 80.9,
  "refused_mw": 0.0,
  "submitted_mw": 9.0,
  "sites": [
   {
    "site_name": "Learielaw Farm, Learielaw -  Battery Energy Storage",
    "capacity_mw": 100.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 350000
   },
   {
    "site_name": "Drumshoreland Road Battery Storage Facility",
    "capacity_mw": 49.9,
    "status": "approved",
    "year": 2022,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Drumcross Battery Storage",
    "capacity_mw": 30.0,
    "status": "approved",
    "year": 2018,
    "homes_while_discharging": 105000
   },
   {
    "site_name": "Broxburn",
    "capacity_mw": 20.0,
    "status": "operating",
    "year": 2017,
    "homes_while_discharging": 70000
   },
   {
    "site_name": "Leyden Road -  Battery Energy Storage",
    "capacity_mw": 9.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 32000
   },
   {
    "site_name": "Tormywheel Wind Farm Extension",
    "capacity_mw": 1.0,
    "status": "approved",
    "year": 2020,
    "homes_while_discharging": 3500
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Learielaw Farm, Learielaw -  Battery Energy Storage",
   "repd_ref_id": 13368,
   "technology": "Battery",
   "capacity_mw": 100.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-05-19",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004983",
   "operator": "Intelligent Land Investments Group",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-05-19",
     "years_since_consent": 1.2
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Drumshoreland Road Battery Storage Facility",
   "repd_ref_id": 8920,
   "technology": "Battery",
   "capacity_mw": 49.9,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2022-07-07",
   "refused": null,
   "planning_authority": "West Lothian",
   "planning_ref": "0255/FUL/22",
   "operator": "Sirius Renewables",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-07-07",
     "years_since_consent": 4.1
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Longhill Burn Wind Farm",
   "repd_ref_id": 6327,
   "technology": "Wind Onshore",
   "capacity_mw": 45.6,
   "homes_equivalent": 40000,
   "status": "Under Construction",
   "consented": "2020-04-17",
   "refused": null,
   "planning_authority": "West Lothian",
   "planning_ref": "0359/FUL/19",
   "operator": "EnergieKontor UK",
   "reason": {
    "reason": "connection_date",
    "label": "Its grid connection date of 2022 has passed and it is still not generating",
    "who": "the grid operator (NESO) and SP Transmission",
    "evidence": {
     "project": "Longhill Burn Wind Farm",
     "connection_date": "2022-10-31",
     "mw": 50.0,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "building"
    ]
   },
   "earliest": "2022",
   "tec": {
    "project": "Longhill Burn Wind Farm",
    "connection_date": "2022-10-31",
    "connection_year": 2022,
    "mw": 50.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Gladsmuir Hills - Wind Farm",
   "repd_ref_id": 10585,
   "technology": "Wind Onshore",
   "capacity_mw": 41.0,
   "homes_equivalent": 36000,
   "status": "Awaiting Construction",
   "consented": "2025-10-13",
   "refused": null,
   "planning_authority": "West Lothian",
   "planning_ref": "0706/FUL/22",
   "operator": "Wind Estate (UK) Ltd",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2032, 7 years after it was approved",
    "who": "the grid operator (NESO) and SP Transmission",
    "evidence": {
     "project": "Gladsmuir Wind Farm",
     "connection_date": "2032-10-29",
     "mw": 43.0,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2032",
   "tec": {
    "project": "Gladsmuir Wind Farm",
    "connection_date": "2032-10-29",
    "connection_year": 2032,
    "mw": 43.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Leyden Road - Solar Array",
   "repd_ref_id": 19085,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 40.0,
   "homes_equivalent": 15000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "West Lothian",
   "planning_ref": "0998/FUL/25",
   "operator": "Trio Power Limited",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2025, still waiting for a decision",
    "who": "West Lothian Council",
    "evidence": {
     "submitted": "2025-12-22",
     "months_waiting": 7
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Drumcross Battery Storage",
   "repd_ref_id": 8155,
   "technology": "Battery",
   "capacity_mw": 30.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2018-06-12",
   "refused": null,
   "planning_authority": "West Lothian",
   "planning_ref": "0114/FUL/18",
   "operator": "Muirhall Energy",
   "reason": {
    "reason": "connection_date",
    "label": "Its grid connection date of 2024 has passed and it is still not generating",
    "who": "the grid operator (NESO) and SP Transmission",
    "evidence": {
     "project": "Drumcross ESS",
     "connection_date": "2024-12-31",
     "mw": 29.9,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2024",
   "tec": {
    "project": "Drumcross ESS",
    "connection_date": "2024-12-31",
    "connection_year": 2024,
    "mw": 29.9,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Camilty Plantation - Wind Farm",
   "repd_ref_id": 8909,
   "technology": "Wind Onshore",
   "capacity_mw": 25.8,
   "homes_equivalent": 23000,
   "status": "Awaiting Construction",
   "consented": "2021-10-05",
   "refused": null,
   "planning_authority": "West Lothian",
   "planning_ref": "0320/FUL/21",
   "operator": "EDF Energy Renewables",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 5 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2021-10-05",
     "years_since_consent": 4.8
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Selms Muir - Solar Farm",
   "repd_ref_id": 9463,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 18.0,
   "homes_equivalent": 6500,
   "status": "Awaiting Construction",
   "consented": "2022-09-27",
   "refused": null,
   "planning_authority": "West Lothian",
   "planning_ref": "0442/FUL/22",
   "operator": "Renewable Connections",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-09-27",
     "years_since_consent": 3.8
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Pearie Law 2 - Wind turbines",
   "repd_ref_id": 8847,
   "technology": "Wind Onshore",
   "capacity_mw": 14.4,
   "homes_equivalent": 13000,
   "status": "Awaiting Construction",
   "consented": "2021-12-22",
   "refused": null,
   "planning_authority": "West Lothian",
   "planning_ref": "0124/FUL/21",
   "operator": "Wind Estate (UK) Ltd",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 5 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2021-12-22",
     "years_since_consent": 4.6
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Leyden Road -  Battery Energy Storage",
   "repd_ref_id": 19086,
   "technology": "Battery",
   "capacity_mw": 9.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "West Lothian",
   "planning_ref": "0998/FUL/25",
   "operator": "Trio Power Limited",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2025, still waiting for a decision",
    "who": "West Lothian Council",
    "evidence": {
     "submitted": "2025-12-22",
     "months_waiting": 7
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Tormywheel Wind Farm Extension",
   "repd_ref_id": 6208,
   "technology": "Wind Onshore",
   "capacity_mw": 5.0,
   "homes_equivalent": 4400,
   "status": "Awaiting Construction",
   "consented": "2020-03-06",
   "refused": null,
   "planning_authority": "West Lothian",
   "planning_ref": "LIVE/0226/FUL/17",
   "operator": "Muirhall Energy",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 6 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2020-03-06",
     "years_since_consent": 6.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Harburnhead Windfarm - Wind Turbine",
   "repd_ref_id": 11980,
   "technology": "Wind Onshore",
   "capacity_mw": 4.0,
   "homes_equivalent": 3500,
   "status": "Awaiting Construction",
   "consented": "2023-01-23",
   "refused": null,
   "planning_authority": "West Lothian",
   "planning_ref": "0907/FUL/22",
   "operator": "Caber Energy Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-01-23",
     "years_since_consent": 3.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Nettlehill Road - Solar Panels",
   "repd_ref_id": 15820,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 2.8,
   "homes_equivalent": 1000,
   "status": "Awaiting Construction",
   "consented": "2024-02-29",
   "refused": null,
   "planning_authority": "West Lothian",
   "planning_ref": "0042/FUL/24",
   "operator": "Zestec Renewable Energy",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-02-29",
     "years_since_consent": 2.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "The Wyman Gordon Facility, Nettlehill Road- Solar Farm",
   "repd_ref_id": 11955,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 2.0,
   "homes_equivalent": 700,
   "status": "Awaiting Construction",
   "consented": "2023-01-10",
   "refused": null,
   "planning_authority": "West Lothian",
   "planning_ref": "0708/FUL/22",
   "operator": "Wyman-Gordon Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-01-10",
     "years_since_consent": 3.6
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Brewster Brothers, Drumshoreland Road - Solar Panels",
   "repd_ref_id": 14041,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 1.7,
   "homes_equivalent": 600,
   "status": "Awaiting Construction",
   "consented": "2025-09-19",
   "refused": null,
   "planning_authority": "West Lothian",
   "planning_ref": "0316/FUL/25",
   "operator": "Brewster Brothers Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-09-19",
     "years_since_consent": 0.9
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Tormywheel Wind Farm Extension",
   "repd_ref_id": 6989,
   "technology": "Battery",
   "capacity_mw": 1.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2020-03-06",
   "refused": null,
   "planning_authority": "West Lothian",
   "planning_ref": "LIVE/0226/FUL/17",
   "operator": "Muirhall Energy",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 6 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2020-03-06",
     "years_since_consent": 6.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "S14000074",
  "S14000081",
  "S14000068",
  "S14000099",
  "S14000063",
  "S14000082"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}