 "pcon24cd": "S14000090",
 "name": "Glenrothes and Mid Fife",
 "nation": "Scotland",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 37.8,
   "sites": 5
  }
 },
 "number2": {
  "stuck_mw": 121.0,
  "stuck_mw_int": 121,
  "stuck_sites": 10,
  "homes_equivalent": 44000,
  "homes_vs_seat_households": 1.02,
  "stuck_mw_12m_cut": 121.0,
  "consented_not_built_mw_any_age": 121.5,
  "operational_mw": 48.1,
  "operational_homes_equivalent": 37000,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 2.0,
  "rank": 49,
  "tech_mix": {
   "solar": 121.0
  },
  "tech_summary": "all solar",
  "waiting_vs_running": 2.5,
  "projects": [
   {
    "site_name": "Wemyss Estate - Randolph Solar Farm & Battery Energy Storage",
    "repd_ref_id": 6383,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 50.0,
    "homes_equivalent": 18000,
    "consented": "2022-05-24",
    "months_waiting": 50.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Westfield Solar Farm & Battery",
    "repd_ref_id": 20391,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 30.0,
    "homes_equivalent": 11000,
    "consented": "2021-02-12",
    "months_waiting": 65.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Strathruddie, Kinglassie - Solar farm",
    "repd_ref_id": 9403,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 25.0,
    "homes_equivalent": 9100,
    "consented": "2022-03-16",
    "months_waiting": 52.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Land North of Balbeggie Avenue",
    "repd_ref_id": 5800,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 12.0,
    "homes_equivalent": 4400,
    "consented": "2016-03-29",
    "months_waiting": 124.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Flexcon, Whitworth Road - Solar Panels",
    "repd_ref_id": 14782,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 1.5,
    "homes_equivalent": 500,
    "consented": "2023-10-13",
    "months_waiting": 33.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Leviton, Viewfield Industrial Estate - Solar Panels",
    "repd_ref_id": 12324,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 1.0,
    "homes_equivalent": 400,
    "consented": "2022-11-25",
    "months_waiting": 44.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Elmpark Sawmill, Leven Mills - Solar PV Panels",
    "repd_ref_id": 15437,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.9,
    "homes_equivalent": 300,
    "consented": "2024-01-24",
    "months_waiting": 30.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Westwood One, James Watt Avenue - Solar Array",
    "repd_ref_id": 20632,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.5,
    "homes_equivalent": 200,
    "consented": "2026-04-14",
    "months_waiting": 3.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Donaldson Timber Engineering, Muiredge Industrial Estate - Solar Panels",
    "repd_ref_id": 15354,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2024-01-17",
    "months_waiting": 30.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Flexel International, Telford Road - Solar Array",
    "repd_ref_id": 13683,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2023-06-06",
    "months_waiting": 37.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Police scotland, Detroit Road - Solar Panels",
    "repd_ref_id": 13152,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.1,
    "homes_equivalent": 100,
    "consented": "2023-03-09",
    "months_waiting": 40.8,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 42861,
  "seat_total_gbp": 3900000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 19.9,
  "approved_mw": 177.5,
  "approved_24m_mw": 176.9,
  "refused_mw": 0.0,
  "submitted_mw": 160.0,
  "sites": [
   {
    "site_name": "Former Fife Power Station - Battery Energy Storage System",
    "capacity_mw": 100.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 350000
   },
   {
    "site_name": "Roaring Hill, Whinnyknowe - Battery Energy Storage System",
    "capacity_mw": 60.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 210000
   },
   {
    "site_name": "Wester Balbeggie Farm, Balbeggie Avenue - Battery Storage",
    "capacity_mw": 49.0,
    "status": "approved",
    "year": 2023,
    "homes_while_discharging": 172000
   },
   {
    "site_name": "Ballingall Farm, Leslie - Battery Energy Storage System",
    "capacity_mw": 43.0,
    "status": "approved",
    "year": 2023,
    "homes_while_discharging": 151000
   },
   {
    "site_name": "Wemyss Estate - Randolph Solar Farm & Battery Energy Storage",
    "capacity_mw": 25.0,
    "status": "approved",
    "year": 2022,
    "homes_while_discharging": 88000
   },
   {
    "site_name": "Strathruddie, Kinglassie - Solar farm",
    "capacity_mw": 20.0,
    "status": "approved",
    "year": 2022,
    "homes_while_discharging": 70000
   },
   {
    "site_name": "Westfield Solar Farm & Battery",
    "capacity_mw": 20.0,
    "status": "approved",
    "year": 2021,
    "homes_while_discharging": 70000
   },
   {
    "site_name": "Land North of Thornton Road",
    "capacity_mw": 19.9,
    "status": "approved",
    "year": 2016,
    "homes_while_discharging": 70000
   },
   {
    "site_name": "Balsillie Avenue - Roaring Hill Energy Storage Facility",
    "capacity_mw": 19.9,
    "status": "building",
    "year": 2021,
    "homes_while_discharging": 70000
   },
   {
    "site_name": "Cable Road - Energy Storage Battery Box",
    "capacity_mw": 0.2,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 700
   },
   {
    "site_name": "Rainbow Nursery, Saltire Centre, Pentland Park - Energy Storage Battery",
    "capacity_mw": 0.2,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 700
   },
   {
    "site_name": "Micro Energy Storage Project, Colquhally Road - Energy Storage Battery",
    "capacity_mw": 0.2,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 700
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Former Fife Power Station - Battery Energy Storage System",
   "repd_ref_id": 17018,
   "technology": "Battery",
   "capacity_mw": 100.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00005188",
   "operator": "Fife Power 1 Ltd",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 18 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-02-06",
     "months_waiting": 18
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Roaring Hill, Whinnyknowe - Battery Energy Storage System",
   "repd_ref_id": 16676,
   "technology": "Battery",
   "capacity_mw": 60.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00005104",
   "operator": "ELM Power Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 12 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-07-23",
     "months_waiting": 12
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Wemyss Estate - Randolph Solar Farm & Battery Energy Storage",
   "repd_ref_id": 6383,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 50.0,
   "homes_equivalent": 18000,
   "status": "Awaiting Construction",
   "consented": "2022-05-24",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00002222",
   "operator": "Elgin Energy",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-05-24",
     "years_since_consent": 4.2
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Wester Balbeggie Farm, Balbeggie Avenue - Battery Storage",
   "repd_ref_id": 12350,
   "technology": "Battery",
   "capacity_mw": 49.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2023-08-17",
   "refused": null,
   "planning_authority": "Fife",
   "planning_ref": "23/00701/FULL",
   "operator": "Relay Balbeggie Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-08-17",
     "years_since_consent": 3.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Ballingall Farm, Leslie - Battery Energy Storage System",
   "repd_ref_id": 10825,
   "technology": "Battery",
   "capacity_mw": 43.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2023-09-14",
   "refused": null,
   "planning_authority": "Fife",
   "planning_ref": "23/00971/FULL",
   "operator": "EcoDev Group Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-09-14",
     "years_since_consent": 2.9
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Westfield Solar Farm & Battery",
   "repd_ref_id": 20391,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 30.0,
   "homes_equivalent": 11000,
   "status": "Awaiting Construction",
   "consented": "2021-02-12",
   "refused": null,
   "planning_authority": "Fife",
   "planning_ref": "20/02221/ARC",
   "operator": "Brockwell Energy Limited",
   "reason": {
    "reason": "connection_date",
    "label": "Its grid connection date of 2025 has passed and it is still not generating",
    "who": "the grid operator (NESO) and SP Transmission",
    "evidence": {
     "project": "Westfield PV Park",
     "connection_date": "2025-12-01",
     "mw": 29.9,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2025",
   "tec": {
    "project": "Westfield PV Park",
    "connection_date": "2025-12-01",
    "connection_year": 2025,
    "mw": 29.9,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Strathruddie, Kinglassie - Solar farm",
   "repd_ref_id": 9403,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 25.0,
   "homes_equivalent": 9100,
   "status": "Awaiting Construction",
   "consented": "2022-03-16",
   "refused": null,
   "planning_authority": "Fife",
   "planning_ref": "21/03531/FULL",
   "operator": "Renewable Connection Developments Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-03-16",
     "years_since_consent": 4.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Wemyss Estate - Randolph Solar Farm & Battery Energy Storage",
   "repd_ref_id": 11482,
   "technology": "Battery",
   "capacity_mw": 25.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2022-05-24",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00002222",
   "operator": "Elgin Energy",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-05-24",
     "years_since_consent": 4.2
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Westfield (former Opencast Coal Mine)",
   "repd_ref_id": 6262,
   "technology": "EfW Incineration",
   "capacity_mw": 23.7,
   "homes_equivalent": null,
   "status": "Under Construction",
   "consented": "2019-02-07",
   "refused": null,
   "planning_authority": "Fife",
   "planning_ref": "18/02342/ARC",
   "operator": "Brockwell Energy",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Strathruddie, Kinglassie - Solar farm",
   "repd_ref_id": 10828,
   "technology": "Battery",
   "capacity_mw": 20.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2022-03-16",
   "refused": null,
   "planning_authority": "Fife",
   "planning_ref": "21/03531/FULL",
   "operator": "Renewable Connection Developments Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-03-16",
     "years_since_consent": 4.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Westfield Solar Farm & Battery",
   "repd_ref_id": 20392,
   "technology": "Battery",
   "capacity_mw": 20.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2021-02-12",
   "refused": null,
   "planning_authority": "Fife",
   "planning_ref": "20/02221/ARC",
   "operator": "Brockwell Energy Limited",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2026, 5 years after it was approved",
    "who": "the grid operator (NESO) and SP Transmission",
    "evidence": {
     "project": "Westfield GSP",
     "connection_date": "2026-10-31",
     "mw": 20.0,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2026",
   "tec": {
    "project": "Westfield GSP",
    "connection_date": "2026-10-31",
    "connection_year": 2026,
    "mw": 20.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Land North of Thornton Road",
   "repd_ref_id": 7131,
   "technology": "Battery",
   "capacity_mw": 19.9,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2016-02-10",
   "refused": null,
   "planning_authority": "Fife",
   "planning_ref": "15/04010/FULL",
   "operator": "South Redhouse",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 10 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2016-02-10",
     "years_since_consent": 10.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Balsillie Avenue - Roaring Hill Energy Storage Facility",
   "repd_ref_id": 9224,
   "technology": "Battery",
   "capacity_mw": 19.9,
   "homes_equivalent": null,
   "status": "Under Construction",
   "consented": "2021-09-03",
   "refused": null,
   "planning_authority": "Fife",
   "planning_ref": "21/01438/FULL",
   "operator": "Tag Energy UK",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Land North of Balbeggie Avenue",
   "repd_ref_id": 5800,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 12.0,
   "homes_equivalent": 4400,
   "status": "Awaiting Construction",
   "consented": "2016-03-29",
   "refused": null,
   "planning_authority": "Fife",
   "planning_ref": "15/03472/FULL",
   "operator": "North Gisborne",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 10 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2016-03-29",
     "years_since_consent": 10.3
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Flexcon, Whitworth Road - Solar Panels",
   "repd_ref_id": 14782,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 1.5,
   "homes_equivalent": 500,
   "status": "Awaiting Construction",
   "consented": "2023-10-13",
   "refused": null,
   "planning_authority": "Fife",
   "planning_ref": "23/02030/FULL",
   "operator": "Flexcon Europe",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-10-13",
     "years_since_consent": 2.8
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Leviton, Viewfield Industrial Estate - Solar Panels",
   "repd_ref_id": 12324,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 1.0,
   "homes_equivalent": 400,
   "status": "Awaiting Construction",
   "consented": "2022-11-25",
   "refused": null,
   "planning_authority": "Fife",
   "planning_ref": "22/03215/FULL",
   "operator": "Leviton Network Solutions europe",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-11-25",
     "years_since_consent": 3.7
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "S14000071",
  "S14000076",
  "S14000100",
  "S14000103"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}