 "pcon24cd": "S14000073",
 "name": "Dumfries and Galloway",
 "nation": "Scotland",
 "number1": {
  "visible": true,
  "cost_gbp_12m": 11000000,
  "cost_gbp_12m_exact": 10998690,
  "curtailed_mwh_12m": 209591,
  "rank_of_visible": 7,
  "visible_seats": 19,
  "framings": {
   "hours_of_seat_homes_electricity": 3160.2,
   "homes_for_a_year_energy_lost": 84000
  },
  "sites": [
   {
    "site_name": "Kilgallioch wind farm",
    "repd_ref_id": 4386,
    "cost_gbp_12m": 6500000,
    "curtailed_mwh_12m": 83594,
    "homes_for_a_year": 33000,
    "mapping_confidence": "high"
   },
   {
    "site_name": "Brochloch Rig (formerly Windy Standard II)",
    "repd_ref_id": 4431,
    "cost_gbp_12m": 2200000,
    "curtailed_mwh_12m": 26882,
    "homes_for_a_year": 11000,
    "mapping_confidence": "medium"
   },
   {
    "site_name": "Windy Rig Wind Farm",
    "repd_ref_id": 7562,
    "cost_gbp_12m": 1600000,
    "curtailed_mwh_12m": 52962,
    "homes_for_a_year": 21000,
    "mapping_confidence": "high"
   },
   {
    "site_name": "Glen App",
    "repd_ref_id": 4593,
    "cost_gbp_12m": 430000,
    "curtailed_mwh_12m": 5607,
    "homes_for_a_year": 2200,
    "mapping_confidence": "high"
   },
   {
    "site_name": "Benbrack Wind Farm",
    "repd_ref_id": 3503,
    "cost_gbp_12m": 300000,
    "curtailed_mwh_12m": 40329,
    "homes_for_a_year": 16000,
    "mapping_confidence": "high"
   },
   {
    "site_name": "Blackcraig",
    "repd_ref_id": 4032,
    "cost_gbp_12m": 28000,
    "curtailed_mwh_12m": 217,
    "homes_for_a_year": 100,
    "mapping_confidence": "high"
   }
  ],
  "invisible_wind": {
   "mw": 118.7,
   "sites": 9
  }
 },
 "number2": {
  "stuck_mw": 560.1,
  "stuck_mw_int": 560,
  "stuck_sites": 24,
  "homes_equivalent": 488000,
  "homes_vs_seat_households": 10.45,
  "stuck_mw_12m_cut": 750.6,
  "consented_not_built_mw_any_age": 882.4,
  "operational_mw": 695.2,
  "operational_homes_equivalent": 608000,
  "refused_5y_mw": 0.3,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 11.9,
  "rank": 7,
  "tech_mix": {
   "onshore wind": 556.5,
   "solar": 3.6
  },
  "tech_summary": "almost all onshore wind",
  "waiting_vs_running": 0.8,
  "projects": [
   {
    "site_name": "Mid Moile Wind Farm",
    "repd_ref_id": 10537,
    "technology": "Wind Onshore",
    "capacity_mw": 99.4,
    "homes_equivalent": 87000,
    "consented": "2025-01-30",
    "months_waiting": 18.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Windy Standard III Wind Farm (Brockloch Rig Phase 2)",
    "repd_ref_id": 4615,
    "technology": "Wind Onshore",
    "capacity_mw": 87.6,
    "homes_equivalent": 77000,
    "consented": "2021-03-23",
    "months_waiting": 64.4,
    "status": "Under Construction"
   },
   {
    "site_name": "Stranoch 2",
    "repd_ref_id": 6600,
    "technology": "Wind Onshore",
    "capacity_mw": 84.0,
    "homes_equivalent": 73000,
    "consented": "2021-11-24",
    "months_waiting": 56.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Shepherd's Rig Wind Farm",
    "repd_ref_id": 3417,
    "technology": "Wind Onshore",
    "capacity_mw": 81.0,
    "homes_equivalent": 71000,
    "consented": "2023-08-21",
    "months_waiting": 35.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Troston Loch",
    "repd_ref_id": 6432,
    "technology": "Wind Onshore",
    "capacity_mw": 67.2,
    "homes_equivalent": 59000,
    "consented": "2020-12-18",
    "months_waiting": 67.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Lorg Windfarm",
    "repd_ref_id": 13175,
    "technology": "Wind Onshore",
    "capacity_mw": 64.0,
    "homes_equivalent": 56000,
    "consented": "2026-01-20",
    "months_waiting": 6.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Kilgallioch Windfarm (Extension)",
    "repd_ref_id": 7340,
    "technology": "Wind Onshore",
    "capacity_mw": 50.4,
    "homes_equivalent": 44000,
    "consented": "2021-12-08",
    "months_waiting": 55.8,
    "status": "Under Construction"
   },
   {
    "site_name": "Margree Windfarm",
    "repd_ref_id": 7848,
    "technology": "Wind Onshore",
    "capacity_mw": 49.9,
    "homes_equivalent": 44000,
    "consented": "2022-03-21",
    "months_waiting": 52.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "High Nunton Farm - Solar Farm & Battery Storage",
    "repd_ref_id": 10532,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 49.9,
    "homes_equivalent": 18000,
    "consented": "2025-01-22",
    "months_waiting": 18.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Windy Standard I Repower",
    "repd_ref_id": 10539,
    "technology": "Wind Onshore",
    "capacity_mw": 49.6,
    "homes_equivalent": 43000,
    "consented": "2025-08-26",
    "months_waiting": 11.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Fell Wind Farm",
    "repd_ref_id": 7398,
    "technology": "Wind Onshore",
    "capacity_mw": 49.0,
    "homes_equivalent": 43000,
    "consented": "2021-11-02",
    "months_waiting": 57.0,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Cornharrow Wind Farm",
    "repd_ref_id": 7654,
    "technology": "Wind Onshore",
    "capacity_mw": 38.4,
    "homes_equivalent": 34000,
    "consented": "2022-03-21",
    "months_waiting": 52.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Little Drum Solar Farm - Solar Park &  Battery Storage",
    "repd_ref_id": 16846,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 36.0,
    "homes_equivalent": 13000,
    "consented": "2025-07-28",
    "months_waiting": 12.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Glenshimmeroch Wind Farm",
    "repd_ref_id": 6444,
    "technology": "Wind Onshore",
    "capacity_mw": 36.0,
    "homes_equivalent": 31000,
    "consented": "2019-09-04",
    "months_waiting": 83.0,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Garvilland Farm",
    "repd_ref_id": 6751,
    "technology": "Wind Onshore",
    "capacity_mw": 18.0,
    "homes_equivalent": 16000,
    "consented": "2026-01-27",
    "months_waiting": 6.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Barlockhart Moor Wind Turbines",
    "repd_ref_id": 8400,
    "technology": "Wind Onshore",
    "capacity_mw": 8.4,
    "homes_equivalent": 7300,
    "consented": "2022-02-10",
    "months_waiting": 53.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Knockman Hill, Milnmark Farm - Wind Turbines",
    "repd_ref_id": 12426,
    "technology": "Wind Onshore",
    "capacity_mw": 5.0,
    "homes_equivalent": 4400,
    "consented": "2025-01-28",
    "months_waiting": 18.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Torrs Hill",
    "repd_ref_id": 4529,
    "technology": "Wind Onshore",
    "capacity_mw": 4.0,
    "homes_equivalent": 3500,
    "consented": "2004-03-23",
    "months_waiting": 268.3,
    "status": "Under Construction"
   },
   {
    "site_name": "Glenhead Of Aldouran - Solar Array & Water Source Heat Pump System",
    "repd_ref_id": 8807,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 1.0,
    "homes_equivalent": 400,
    "consented": "2021-04-28",
    "months_waiting": 63.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Tesco Extra Dumfries",
    "repd_ref_id": 14030,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.8,
    "homes_equivalent": 300,
    "consented": "2023-07-12",
    "months_waiting": 36.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Plascow Farm - Solar Array",
    "repd_ref_id": 15834,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.5,
    "homes_equivalent": 200,
    "consented": "2024-02-08",
    "months_waiting": 29.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Sandmill, Sandhead - Solar Panels",
    "repd_ref_id": 11173,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.5,
    "homes_equivalent": 200,
    "consented": "2022-12-21",
    "months_waiting": 43.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Knocknain Farm, Leswalt - Wind Turbine",
    "repd_ref_id": 14032,
    "technology": "Wind Onshore",
    "capacity_mw": 0.3,
    "homes_equivalent": 300,
    "consented": "2023-09-21",
    "months_waiting": 34.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Lochside Of Fell, Crocketford - Solar Array",
    "repd_ref_id": 12889,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2023-09-06",
    "months_waiting": 34.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Glaick Farm, Leswalt - Wind Turbine",
    "repd_ref_id": 13151,
    "technology": "Wind Onshore",
    "capacity_mw": 0.2,
    "homes_equivalent": 200,
    "consented": "2023-05-03",
    "months_waiting": 39.0,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Lochar Industrial Estate - Solar Panels & Battery Storage",
    "repd_ref_id": 17582,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2025-01-30",
    "months_waiting": 18.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Unit 4, Industrial Site - Solar Panels",
    "repd_ref_id": 15650,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2024-02-28",
    "months_waiting": 29.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Rerrick Park Farm, Dundrennan - Wind Turbine & Substation",
    "repd_ref_id": 19950,
    "technology": "Wind Onshore",
    "capacity_mw": 0.2,
    "homes_equivalent": 200,
    "consented": "2026-03-10",
    "months_waiting": 4.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Barwhillanty House, Barwhillanty Estate - Solar Array",
    "repd_ref_id": 15015,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2024-02-09",
    "months_waiting": 29.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Kellwood Road - Solar Panels",
    "repd_ref_id": 12835,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2023-01-13",
    "months_waiting": 42.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Plascow Wind Turbine",
    "repd_ref_id": 8263,
    "technology": "Wind Onshore",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2021-11-24",
    "months_waiting": 56.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Manquhill, Carsphairn - Wind Farm",
    "repd_ref_id": 12105,
    "technology": "Wind Onshore",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2024-07-08",
    "months_waiting": 24.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Divot Hill Wind Farm",
    "repd_ref_id": 13646,
    "technology": "Wind Onshore",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2024-07-10",
    "months_waiting": 24.8,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 46707,
  "seat_total_gbp": 4300000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 20.0,
  "approved_mw": 80.0,
  "approved_24m_mw": 28.0,
  "refused_mw": 0.0,
  "submitted_mw": 104.8,
  "sites": [
   {
    "site_name": "Quantans Hill Wind Farm",
    "capacity_mw": 50.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Kellwood Road - Battery Storage",
    "capacity_mw": 40.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 140000
   },
   {
    "site_name": "Stranoch 2",
    "capacity_mw": 20.0,
    "status": "building",
    "year": 2021,
    "homes_while_discharging": 70000
   },
   {
    "site_name": "Troston Loch Wind Farm",
    "capacity_mw": 20.0,
    "status": "approved",
    "year": 2020,
    "homes_while_discharging": 70000
   },
   {
    "site_name": "Lairdmannoch Energy Park",
    "capacity_mw": 20.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 70000
   },
   {
    "site_name": "High Mark Wind Farm - Wind Turbines",
    "capacity_mw": 15.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 53000
   },
   {
    "site_name": "Little Drum Solar Farm - Solar Park &  Battery Storage",
    "capacity_mw": 12.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 42000
   },
   {
    "site_name": "Larbrax Wind Farm",
    "capacity_mw": 10.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 35000
   },
   {
    "site_name": "Shepherd's Rig Wind Farm",
    "capacity_mw": 6.0,
    "status": "approved",
    "year": 2023,
    "homes_while_discharging": 21000
   },
   {
    "site_name": "Challoch, Barnkirk Road - Solar Array & Battery Energy Storage",
    "capacity_mw": 6.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 21000
   },
   {
    "site_name": "Craig Nab Wind Energy Hub - Wind Farm",
    "capacity_mw": 3.8,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 13000
   },
   {
    "site_name": "Knocknain Farm, Leswalt - Battery Storage Unit",
    "capacity_mw": 2.0,
    "status": "approved",
    "year": 2023,
    "homes_while_discharging": 7000
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Blair Hill Wind Farm",
   "repd_ref_id": 14770,
   "technology": "Wind Onshore",
   "capacity_mw": 145.0,
   "homes_equivalent": 127000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004878",
   "operator": "RES Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 17 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-03-03",
     "months_waiting": 17
    },
    "all_matches": [
     "planning_overdue",
     "gate2",
     "connection_date"
    ]
   },
   "earliest": "2036",
   "tec": {
    "project": "Blair Hill Wind Farm",
    "connection_date": "2036-10-31",
    "connection_year": 2036,
    "mw": 99.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": "Still in the grid queue review \u2014 no firm connection date yet",
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Mid Moile Wind Farm",
   "repd_ref_id": 10537,
   "technology": "Wind Onshore",
   "capacity_mw": 99.4,
   "homes_equivalent": 87000,
   "status": "Awaiting Construction",
   "consented": "2025-01-30",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003405",
   "operator": "EnergieKontor UK Limited",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2031, 6 years after it was approved",
    "who": "the grid operator (NESO) and SP Transmission",
    "evidence": {
     "project": "Mid Moile Wind Farm",
     "connection_date": "2031-10-31",
     "mw": 99.0,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2031",
   "tec": {
    "project": "Mid Moile Wind Farm",
    "connection_date": "2031-10-31",
    "connection_year": 2031,
    "mw": 99.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Quantans Hill Wind Farm",
   "repd_ref_id": 13237,
   "technology": "Wind Onshore",
   "capacity_mw": 96.0,
   "homes_equivalent": 84000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003399",
   "operator": "Vattenfall Wind Power Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 3.5 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2023-01-27",
     "months_waiting": 42
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Windy Standard III Wind Farm (Brockloch Rig Phase 2)",
   "repd_ref_id": 4615,
   "technology": "Wind Onshore",
   "capacity_mw": 87.6,
   "homes_equivalent": 77000,
   "status": "Under Construction",
   "consented": "2021-03-23",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00000335",
   "operator": "Fred Olsen Renewables",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Glenvernoch Wind Farm",
   "repd_ref_id": 14761,
   "technology": "Wind Onshore",
   "capacity_mw": 86.0,
   "homes_equivalent": 75000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004892",
   "operator": "Energiekontor (UK) Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 21 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2024-11-12",
     "months_waiting": 21
    },
    "all_matches": [
     "planning_overdue",
     "connection_date"
    ]
   },
   "earliest": "2037",
   "tec": {
    "project": "Glenvernoch",
    "connection_date": "2037-10-31",
    "connection_year": 2037,
    "mw": 95.8,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Stranoch 2",
   "repd_ref_id": 6600,
   "technology": "Wind Onshore",
   "capacity_mw": 84.0,
   "homes_equivalent": 73000,
   "status": "Awaiting Construction",
   "consented": "2021-11-24",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00000710",
   "operator": "EDF Energy",
   "reason": {
    "reason": "gate2",
    "label": "Cleared the grid queue review, so it now has a firm connection date",
    "who": "the grid operator (NESO)",
    "evidence": {
     "project": "Stranoch Wind Farm",
     "gate2_outcome": "Cleared the grid queue review, so it now has a firm connection date"
    },
    "all_matches": [
     "gate2",
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2026",
   "tec": {
    "project": "Stranoch Wind Farm",
    "connection_date": "2026-12-18",
    "connection_year": 2026,
    "mw": 102.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": "Cleared the grid queue review, so it now has a firm connection date",
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Shepherd's Rig Wind Farm",
   "repd_ref_id": 3417,
   "technology": "Wind Onshore",
   "capacity_mw": 81.0,
   "homes_equivalent": 71000,
   "status": "Awaiting Construction",
   "consented": "2023-08-21",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00000735",
   "operator": "Boralex/Infinergy",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-08-21",
     "years_since_consent": 3.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Troston Loch",
   "repd_ref_id": 6432,
   "technology": "Wind Onshore",
   "capacity_mw": 67.2,
   "homes_equivalent": 59000,
   "status": "Awaiting Construction",
   "consented": "2020-12-18",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00001785",
   "operator": "EDF Energy Renewables",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 6 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2020-12-18",
     "years_since_consent": 5.6
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Lorg Windfarm",
   "repd_ref_id": 13175,
   "technology": "Wind Onshore",
   "capacity_mw": 64.0,
   "homes_equivalent": 56000,
   "status": "Awaiting Construction",
   "consented": "2026-01-20",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003283",
   "operator": "RWE Npower Renewables",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2027, 1 year after it was approved",
    "who": "the grid operator (NESO) and SP Transmission",
    "evidence": {
     "project": "Lorg Wind Farm",
     "connection_date": "2027-04-07",
     "mw": 69.5,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2027",
   "tec": {
    "project": "Lorg Wind Farm",
    "connection_date": "2027-04-07",
    "connection_year": 2027,
    "mw": 69.5,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Lairdmannoch Energy Park",
   "repd_ref_id": 14764,
   "technology": "Wind Onshore",
   "capacity_mw": 60.0,
   "homes_equivalent": 52000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004900",
   "operator": "Wind2 / Octopus Energy",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 14 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-05-27",
     "months_waiting": 14
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "High Mark Wind Farm - Wind Turbines",
   "repd_ref_id": 12389,
   "technology": "Wind Onshore",
   "capacity_mw": 50.4,
   "homes_equivalent": 44000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00005159",
   "operator": "Wind Estate (UK) Ltd",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2026, still waiting for a decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2026-05-15",
     "months_waiting": 3
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Kilgallioch Windfarm (Extension)",
   "repd_ref_id": 7340,
   "technology": "Wind Onshore",
   "capacity_mw": 50.4,
   "homes_equivalent": 44000,
   "status": "Under Construction",
   "consented": "2021-12-08",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00001996",
   "operator": "ScottishPower Renewables",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Quantans Hill Wind Farm",
   "repd_ref_id": 13238,
   "technology": "Battery",
   "capacity_mw": 50.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003399",
   "operator": "Vattenfall Wind Power Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 3.5 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2023-01-27",
     "months_waiting": 42
    },
    "all_matches": [
     "planning_overdue",
     "connection_date"
    ]
   },
   "earliest": "2029",
   "tec": {
    "project": "Quantans Hill Wind Farm",
    "connection_date": "2029-07-02",
    "connection_year": 2029,
    "mw": 95.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Margree Windfarm",
   "repd_ref_id": 7848,
   "technology": "Wind Onshore",
   "capacity_mw": 49.9,
   "homes_equivalent": 44000,
   "status": "Awaiting Construction",
   "consented": "2022-03-21",
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "20/2085/FUL",
   "operator": "Energiekontor (UK) Limited",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2029, 7 years after it was approved",
    "who": "the grid operator (NESO) and SP Transmission",
    "evidence": {
     "project": "Margree Wind Farm",
     "connection_date": "2029-10-31",
     "mw": 50.0,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2029",
   "tec": {
    "project": "Margree Wind Farm",
    "connection_date": "2029-10-31",
    "connection_year": 2029,
    "mw": 50.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "High Nunton Farm - Solar Farm & Battery Storage",
   "repd_ref_id": 10532,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Awaiting Construction",
   "consented": "2025-01-22",
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "21/2490/FUL",
   "operator": "High Nunton Solar Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-01-22",
     "years_since_consent": 1.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Windy Standard I Repower",
   "repd_ref_id": 10539,
   "technology": "Wind Onshore",
   "capacity_mw": 49.6,
   "homes_equivalent": 43000,
   "status": "Awaiting Construction",
   "consented": "2025-08-26",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003324",
   "operator": "Fred Olsen Renewables",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-08-26",
     "years_since_consent": 0.9
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Fell Wind Farm",
   "repd_ref_id": 7398,
   "technology": "Wind Onshore",
   "capacity_mw": 49.0,
   "homes_equivalent": 43000,
   "status": "Awaiting Construction",
   "consented": "2021-11-02",
   "refused": "2021-11-02",
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "20/0148/FUL",
   "operator": "EnergieKontor UK",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2029, 8 years after it was approved",
    "who": "the grid operator (NESO) and SP Transmission",
    "evidence": {
     "project": "Fell Wind Farm",
     "connection_date": "2029-10-31",
     "mw": 50.0,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2029",
   "tec": {
    "project": "Fell Wind Farm",
    "connection_date": "2029-10-31",
    "connection_year": 2029,
    "mw": 50.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Harestanes South Windfarm Extension",
   "repd_ref_id": 7868,
   "technology": "Wind Onshore",
   "capacity_mw": 45.0,
   "homes_equivalent": 39000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00002185",
   "operator": "ScottishPower Renewables",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 5.7 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2020-12-07",
     "months_waiting": 68
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Kellwood Road - Battery Storage",
   "repd_ref_id": 16540,
   "technology": "Battery",
   "capacity_mw": 40.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-04-15",
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "24/1075/FUL",
   "operator": "Geocore Limited",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2027, 2 years after it was approved",
    "who": "the grid operator (NESO) and SP Transmission",
    "evidence": {
     "project": "Kellwood Road BESS",
     "connection_date": "2027-10-31",
     "mw": 40.0,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2027",
   "tec": {
    "project": "Kellwood Road BESS",
    "connection_date": "2027-10-31",
    "connection_year": 2027,
    "mw": 40.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Cornharrow Wind Farm",
   "repd_ref_id": 7654,
   "technology": "Wind Onshore",
   "capacity_mw": 38.4,
   "homes_equivalent": 34000,
   "status": "Awaiting Construction",
   "consented": "2022-03-21",
   "refused": "2020-08-21",
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "20/0159/FUL",
   "operator": "EnergieKontor UK",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2030, 8 years after it was approved",
    "who": "the grid operator (NESO) and SP Transmission",
    "evidence": {
     "project": "Cornharrow Wind Farm",
     "connection_date": "2030-10-31",
     "mw": 50.0,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2030",
   "tec": {
    "project": "Cornharrow Wind Farm",
    "connection_date": "2030-10-31",
    "connection_year": 2030,
    "mw": 50.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Little Drum Solar Farm - Solar Park &  Battery Storage",
   "repd_ref_id": 16846,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 36.0,
   "homes_equivalent": 13000,
   "status": "Awaiting Construction",
   "consented": "2025-07-28",
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "24/2616/FUL",
   "operator": "Grupotec Solar UK 5 Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-07-28",
     "years_since_consent": 1.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Glenshimmeroch Wind Farm",
   "repd_ref_id": 6444,
   "technology": "Wind Onshore",
   "capacity_mw": 36.0,
   "homes_equivalent": 31000,
   "status": "Awaiting Construction",
   "consented": "2019-09-04",
   "refused": "2019-03-05",
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "18/0992/FUL",
   "operator": "EnergieKontor UK",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2029, 10 years after it was approved",
    "who": "the grid operator (NESO) and SP Transmission",
    "evidence": {
     "project": "Glenshimmeroch Windfarm",
     "connection_date": "2029-10-31",
     "mw": 45.0,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2029",
   "tec": {
    "project": "Glenshimmeroch Windfarm",
    "connection_date": "2029-10-31",
    "connection_year": 2029,
    "mw": 45.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Craig Nab Wind Energy Hub - Wind Farm",
   "repd_ref_id": 12766,
   "technology": "Wind Onshore",
   "capacity_mw": 33.0,
   "homes_equivalent": 29000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "24/2545/FUL",
   "operator": "Belltown Power Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 19 months for a planning decision",
    "who": "Dumfries and Galloway Council",
    "evidence": {
     "submitted": "2024-12-20",
     "months_waiting": 19
    },
    "all_matches": [
     "planning_overdue",
     "connection_date"
    ]
   },
   "earliest": "2031",
   "tec": {
    "project": "Craig Nab Wind Energy Hub",
    "connection_date": "2031-08-29",
    "connection_year": 2031,
    "mw": 36.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Shennanton Wind Farm",
   "repd_ref_id": 16692,
   "technology": "Wind Onshore",
   "capacity_mw": 30.0,
   "homes_equivalent": 26000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "ECU00005101",
   "operator": "E Power Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 13 months for a planning decision",
    "who": "Dumfries and Galloway Council",
    "evidence": {
     "submitted": "2025-06-26",
     "months_waiting": 13
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Mochrum Fell Wind Farm",
   "repd_ref_id": 7891,
   "technology": "Wind Onshore",
   "capacity_mw": 24.0,
   "homes_equivalent": 21000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "20/1683/FUL",
   "operator": "Falck Renewables Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 5.8 years for a planning decision",
    "who": "Dumfries and Galloway Council",
    "evidence": {
     "submitted": "2020-10-01",
     "months_waiting": 70
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Lairdmannoch Energy Park",
   "repd_ref_id": 14766,
   "technology": "Battery",
   "capacity_mw": 20.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004900",
   "operator": "Wind2 / Octopus Energy",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 14 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-05-27",
     "months_waiting": 14
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Lairdmannoch Energy Park",
   "repd_ref_id": 14765,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 20.0,
   "homes_equivalent": 7300,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004900",
   "operator": "Wind2 / Octopus Energy",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 14 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-05-27",
     "months_waiting": 14
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Stranoch 2",
   "repd_ref_id": 7306,
   "technology": "Battery",
   "capacity_mw": 20.0,
   "homes_equivalent": null,
   "status": "Under Construction",
   "consented": "2021-11-24",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00000710",
   "operator": "EDF Energy",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Challoch, Barnkirk Road - Solar Array & Battery Energy Storage",
   "repd_ref_id": 17600,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 20.0,
   "homes_equivalent": 7300,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "25/1034/FUL",
   "operator": "Shropshire Council",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 14 months for a planning decision",
    "who": "Dumfries and Galloway Council",
    "evidence": {
     "submitted": "2025-06-05",
     "months_waiting": 14
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Troston Loch Wind Farm",
   "repd_ref_id": 7333,
   "technology": "Battery",
   "capacity_mw": 20.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2020-12-18",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00001785",
   "operator": "EDF Energy Renewables",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 6 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2020-12-18",
     "years_since_consent": 5.6
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Larbrax Wind Farm",
   "repd_ref_id": 15044,
   "technology": "Wind Onshore",
   "capacity_mw": 19.2,
   "homes_equivalent": 17000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "24/2623/FUL",
   "operator": "Orsted Onshore UK Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 19 months for a planning decision",
    "who": "Dumfries and Galloway Council",
    "evidence": {
     "submitted": "2025-01-08",
     "months_waiting": 19
    },
    "all_matches": [
     "planning_overdue",
     "connection_date"
    ]
   },
   "earliest": "2029",
   "tec": {
    "project": "Larbrax Wind Farm",
    "connection_date": "2029-11-02",
    "connection_year": 2029,
    "mw": 20.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Garvilland Farm",
   "repd_ref_id": 6751,
   "technology": "Wind Onshore",
   "capacity_mw": 18.0,
   "homes_equivalent": 16000,
   "status": "Awaiting Construction",
   "consented": "2026-01-27",
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "21/0595/FUL",
   "operator": "Green Cat Renewables Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2026-01-27",
     "years_since_consent": 0.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "High Mark Wind Farm - Wind Turbines",
   "repd_ref_id": 16807,
   "technology": "Battery",
   "capacity_mw": 15.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00005159",
   "operator": "Wind Estate (UK) Ltd",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2026, still waiting for a decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2026-05-15",
     "months_waiting": 3
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Little Drum Solar Farm - Solar Park &  Battery Storage",
   "repd_ref_id": 16847,
   "technology": "Battery",
   "capacity_mw": 12.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-07-28",
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "24/2616/FUL",
   "operator": "Grupotec Solar UK 5 Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-07-28",
     "years_since_consent": 1.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Larbrax Wind Farm",
   "repd_ref_id": 15045,
   "technology": "Battery",
   "capacity_mw": 10.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "24/2623/FUL",
   "operator": "Orsted Onshore UK Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 19 months for a planning decision",
    "who": "Dumfries and Galloway Council",
    "evidence": {
     "submitted": "2025-01-08",
     "months_waiting": 19
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Barlockhart Moor Wind Turbines",
   "repd_ref_id": 8400,
   "technology": "Wind Onshore",
   "capacity_mw": 8.4,
   "homes_equivalent": 7300,
   "status": "Awaiting Construction",
   "consented": "2022-02-10",
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "21/0025/S42",
   "operator": "Barlockhart Moor Wind Energy Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-02-10",
     "years_since_consent": 4.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Shepherd's Rig Wind Farm",
   "repd_ref_id": 7179,
   "technology": "Battery",
   "capacity_mw": 6.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2023-08-21",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00000735",
   "operator": "Boralex/Infinergy",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-08-21",
     "years_since_consent": 3.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Challoch, Barnkirk Road - Solar Array & Battery Energy Storage",
   "repd_ref_id": 17601,
   "technology": "Battery",
   "capacity_mw": 6.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "25/1034/FUL",
   "operator": "Shropshire Council",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 14 months for a planning decision",
    "who": "Dumfries and Galloway Council",
    "evidence": {
     "submitted": "2025-06-05",
     "months_waiting": 14
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Knockman Hill, Milnmark Farm - Wind Turbines",
   "repd_ref_id": 12426,
   "technology": "Wind Onshore",
   "capacity_mw": 5.0,
   "homes_equivalent": 4400,
   "status": "Awaiting Construction",
   "consented": "2025-01-28",
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "22/0221/S42",
   "operator": "WJCR Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-01-28",
     "years_since_consent": 1.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Torrs Hill",
   "repd_ref_id": 4529,
   "technology": "Wind Onshore",
   "capacity_mw": 4.0,
   "homes_equivalent": 3500,
   "status": "Under Construction",
   "consented": "2004-03-23",
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "03/P/2/0252",
   "operator": "Torrs Hill Windfarm Ltd",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Craig Nab Wind Energy Hub - Wind Farm",
   "repd_ref_id": 17809,
   "technology": "Battery",
   "capacity_mw": 3.8,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "24/2545/FUL",
   "operator": "Belltown Power Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 19 months for a planning decision",
    "who": "Dumfries and Galloway Council",
    "evidence": {
     "submitted": "2024-12-20",
     "months_waiting": 19
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Knocknain Farm, Leswalt - Battery Storage Unit",
   "repd_ref_id": 14033,
   "technology": "Battery",
   "capacity_mw": 2.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2023-09-21",
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "23/0887/FUL",
   "operator": "Knocknain Developments Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-09-21",
     "years_since_consent": 2.9
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Glenhead Of Aldouran - Solar Array & Water Source Heat Pump System",
   "repd_ref_id": 8807,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 1.0,
   "homes_equivalent": 400,
   "status": "Awaiting Construction",
   "consented": "2021-04-28",
   "refused": null,
   "planning_authority": "Dumfries and Galloway",
   "planning_ref": "21/0329/FUL",
   "operator": "J & M Baxter",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 5 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2021-04-28",
     "years_since_consent": 5.3
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "S14000074",
  "S14000107"
 ],
 "flags": [],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}