 "pcon24cd": "S14000067",
 "name": "Argyll, Bute and South Lochaber",
 "nation": "Scotland",
 "number1": {
  "visible": true,
  "cost_gbp_12m": 1700000,
  "cost_gbp_12m_exact": 1668000,
  "curtailed_mwh_12m": 21651,
  "rank_of_visible": 15,
  "visible_seats": 19,
  "framings": {
   "hours_of_seat_homes_electricity": 504.7,
   "homes_for_a_year_energy_lost": 8700
  },
  "sites": [
   {
    "site_name": "Carraig Gheal",
    "repd_ref_id": 4619,
    "cost_gbp_12m": 1700000,
    "curtailed_mwh_12m": 21608,
    "homes_for_a_year": 8600,
    "mapping_confidence": "high"
   },
   {
    "site_name": "Cour Wind Farm",
    "repd_ref_id": 3772,
    "cost_gbp_12m": 4000,
    "curtailed_mwh_12m": 43,
    "homes_for_a_year": 0,
    "mapping_confidence": "high"
   }
  ],
  "invisible_wind": {
   "mw": 305.4,
   "sites": 15
  }
 },
 "number2": {
  "stuck_mw": 383.8,
  "stuck_mw_int": 384,
  "stuck_sites": 17,
  "homes_equivalent": 338000,
  "homes_vs_seat_households": 7.63,
  "stuck_mw_12m_cut": 554.5,
  "consented_not_built_mw_any_age": 555.3,
  "operational_mw": 459.6,
  "operational_homes_equivalent": 420000,
  "refused_5y_mw": 211.6,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 26.7,
  "rank": 10,
  "tech_mix": {
   "onshore wind": 373.7,
   "hydro": 9.9,
   "solar": 0.2
  },
  "tech_summary": "almost all onshore wind",
  "waiting_vs_running": 0.8,
  "projects": [
   {
    "site_name": "Rowan Wind Farm",
    "repd_ref_id": 8534,
    "technology": "Wind Onshore",
    "capacity_mw": 85.8,
    "homes_equivalent": 75000,
    "consented": "2024-04-26",
    "months_waiting": 27.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Blarghour Wind Farm",
    "repd_ref_id": 6405,
    "technology": "Wind Onshore",
    "capacity_mw": 84.0,
    "homes_equivalent": 73000,
    "consented": "2021-10-29",
    "months_waiting": 57.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Tangy 4 Wind Farm",
    "repd_ref_id": 6734,
    "technology": "Wind Onshore",
    "capacity_mw": 80.0,
    "homes_equivalent": 70000,
    "consented": "2019-12-20",
    "months_waiting": 79.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Clachaig Glen",
    "repd_ref_id": 8000,
    "technology": "Wind Onshore",
    "capacity_mw": 60.0,
    "homes_equivalent": 52000,
    "consented": "2024-11-05",
    "months_waiting": 20.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Ladyfield Renewable Energy Park",
    "repd_ref_id": 15784,
    "technology": "Wind Onshore",
    "capacity_mw": 58.5,
    "homes_equivalent": 51000,
    "consented": "2025-05-02",
    "months_waiting": 15.0,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Beinn an Tuirc Windfarm Phase 3",
    "repd_ref_id": 3387,
    "technology": "Wind Onshore",
    "capacity_mw": 49.9,
    "homes_equivalent": 44000,
    "consented": "2017-02-23",
    "months_waiting": 113.3,
    "status": "Under Construction"
   },
   {
    "site_name": "Glasvaar Wind Farm",
    "repd_ref_id": 9662,
    "technology": "Wind Onshore",
    "capacity_mw": 49.5,
    "homes_equivalent": 43000,
    "consented": "2024-12-20",
    "months_waiting": 19.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "High Constellation Wind Farm",
    "repd_ref_id": 7345,
    "technology": "Wind Onshore",
    "capacity_mw": 48.0,
    "homes_equivalent": 42000,
    "consented": "2020-06-26",
    "months_waiting": 73.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Eascairt Wind Farm",
    "repd_ref_id": 5123,
    "technology": "Wind Onshore",
    "capacity_mw": 26.0,
    "homes_equivalent": 23000,
    "consented": "2018-09-28",
    "months_waiting": 94.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Cnocbreac Inver Estate - Solar Generation",
    "repd_ref_id": 15481,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 2.1,
    "homes_equivalent": 800,
    "consented": "2024-10-28",
    "months_waiting": 21.2,
    "status": "Under Construction"
   },
   {
    "site_name": "Glen Noe River",
    "repd_ref_id": 5962,
    "technology": "Small Hydro",
    "capacity_mw": 2.0,
    "homes_equivalent": 2300,
    "consented": "2016-09-09",
    "months_waiting": 118.8,
    "status": "Under Construction"
   },
   {
    "site_name": "Allt Easach Hydro",
    "repd_ref_id": 6724,
    "technology": "Small Hydro",
    "capacity_mw": 2.0,
    "homes_equivalent": 2300,
    "consented": "2019-03-15",
    "months_waiting": 88.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Glen Etive Estate Phase I (Allt na Chaorainn)",
    "repd_ref_id": 6675,
    "technology": "Small Hydro",
    "capacity_mw": 1.4,
    "homes_equivalent": 1600,
    "consented": "2018-08-31",
    "months_waiting": 95.1,
    "status": "Under Construction"
   },
   {
    "site_name": "Allt Charnan",
    "repd_ref_id": 6657,
    "technology": "Small Hydro",
    "capacity_mw": 1.0,
    "homes_equivalent": 1100,
    "consented": "2019-03-05",
    "months_waiting": 89.0,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Glen Etive Estate Phase II (Allt Mheuran)",
    "repd_ref_id": 6676,
    "technology": "Small Hydro",
    "capacity_mw": 0.9,
    "homes_equivalent": 1000,
    "consented": "2019-03-22",
    "months_waiting": 88.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Blackwater Dam",
    "repd_ref_id": 6730,
    "technology": "Small Hydro",
    "capacity_mw": 0.8,
    "homes_equivalent": 900,
    "consented": "2019-03-29",
    "months_waiting": 88.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Allt Eilidh",
    "repd_ref_id": 7318,
    "technology": "Small Hydro",
    "capacity_mw": 0.6,
    "homes_equivalent": 700,
    "consented": "2019-08-16",
    "months_waiting": 83.6,
    "status": "Under Construction"
   },
   {
    "site_name": "Allt Beinn Ime - Hydroelectric Scheme",
    "repd_ref_id": 21025,
    "technology": "Small Hydro",
    "capacity_mw": 0.4,
    "homes_equivalent": 500,
    "consented": "2026-05-12",
    "months_waiting": 2.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Craig Farm",
    "repd_ref_id": 7313,
    "technology": "Small Hydro",
    "capacity_mw": 0.4,
    "homes_equivalent": 500,
    "consented": "2019-04-03",
    "months_waiting": 88.0,
    "status": "Under Construction"
   },
   {
    "site_name": "Garvie Burn",
    "repd_ref_id": 7305,
    "technology": "Small Hydro",
    "capacity_mw": 0.4,
    "homes_equivalent": 500,
    "consented": "2019-03-01",
    "months_waiting": 89.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Duror 2 Hydro Scheme",
    "repd_ref_id": 6741,
    "technology": "Small Hydro",
    "capacity_mw": 0.4,
    "homes_equivalent": 500,
    "consented": "2019-03-29",
    "months_waiting": 88.2,
    "status": "Under Construction"
   },
   {
    "site_name": "Allt Teanga Brideig, Uluvat - Hydro Electric Scheme",
    "repd_ref_id": 17230,
    "technology": "Small Hydro",
    "capacity_mw": 0.4,
    "homes_equivalent": 400,
    "consented": "2024-12-17",
    "months_waiting": 19.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Rothesay Waste Water Treatment - Solar Panels",
    "repd_ref_id": 15959,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2024-08-29",
    "months_waiting": 23.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Glenegedale Lotts, Turbine Lotts - Solar Pv Array",
    "repd_ref_id": 16036,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2024-06-20",
    "months_waiting": 25.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Cour Cour Burn, Carradale - Hydro Electric Scheme",
    "repd_ref_id": 16034,
    "technology": "Small Hydro",
    "capacity_mw": 0.1,
    "homes_equivalent": 200,
    "consented": "2025-10-16",
    "months_waiting": 9.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Ionad Iomairt Thiriodh, Crossapol - Solar Panels",
    "repd_ref_id": 19983,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.1,
    "homes_equivalent": 100,
    "consented": "2025-12-17",
    "months_waiting": 7.5,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 44349,
  "seat_total_gbp": 4100000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 0.0,
  "approved_mw": 181.8,
  "approved_24m_mw": 60.5,
  "refused_mw": 113.0,
  "submitted_mw": 196.6,
  "sites": [
   {
    "site_name": "Cnoc Buidhe Windfarm",
    "capacity_mw": 108.6,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 381000
   },
   {
    "site_name": "High Constellation Wind Farm",
    "capacity_mw": 55.5,
    "status": "approved",
    "year": 2020,
    "homes_while_discharging": 194000
   },
   {
    "site_name": "Ardencaple Farm - Battery Storage",
    "capacity_mw": 50.0,
    "status": "refused",
    "year": 2024,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "SSE Taynuilt Substation - Battery Energy Storage",
    "capacity_mw": 49.9,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Ladyfield Renewable Energy Park",
    "capacity_mw": 41.4,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 145000
   },
   {
    "site_name": "Sheirdrim Renewable Energy Development - Battery",
    "capacity_mw": 38.0,
    "status": "refused",
    "year": 2023,
    "homes_while_discharging": 133000
   },
   {
    "site_name": "Clachaig Glen",
    "capacity_mw": 30.0,
    "status": "approved",
    "year": 2024,
    "homes_while_discharging": 105000
   },
   {
    "site_name": "Earraghail Renewable Energy Development",
    "capacity_mw": 25.0,
    "status": "refused",
    "year": 2025,
    "homes_while_discharging": 88000
   },
   {
    "site_name": "Corr Chnoc Wind Farm",
    "capacity_mw": 25.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 88000
   },
   {
    "site_name": "Giants Burn Wind Farm -Batter Energy Storage",
    "capacity_mw": 23.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 81000
   },
   {
    "site_name": "West Torrisdale Wind Farm",
    "capacity_mw": 20.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 70000
   },
   {
    "site_name": "Cruach Clenamacrie Wind Farm",
    "capacity_mw": 20.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 70000
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Cruachan Hydro Expansion",
   "repd_ref_id": 9227,
   "technology": "Pumped Storage Hydroelectricity",
   "capacity_mw": 600.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2023-07-21",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004492",
   "operator": "Drax Power Limited / Stantec UK",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2030, 7 years after it was approved",
    "who": "the grid operator (NESO) and SP Transmission",
    "evidence": {
     "project": "Cruachan Expansion",
     "connection_date": "2030-10-31",
     "mw": 600.0,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2030",
   "tec": {
    "project": "Cruachan Expansion",
    "connection_date": "2030-10-31",
    "connection_year": 2030,
    "mw": 600.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Cnoc Buidhe Windfarm",
   "repd_ref_id": 13569,
   "technology": "Wind Onshore",
   "capacity_mw": 191.4,
   "homes_equivalent": 167000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004767",
   "operator": "Belltown Power Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 16 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-04-10",
     "months_waiting": 16
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Sheirdrim Renewable Energy Development - Wind",
   "repd_ref_id": 7337,
   "technology": "Wind Onshore",
   "capacity_mw": 114.0,
   "homes_equivalent": 100000,
   "status": "Appeal Refused",
   "consented": null,
   "refused": "2023-06-26",
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00001957",
   "operator": "ScottishPower Renewables",
   "reason": {
    "reason": "refused",
    "label": "Refused by the Scottish Government (it decides big energy projects) in 2023",
    "who": "the planning appeal inspector",
    "evidence": {
     "refusal_date": "2023-06-26"
    },
    "all_matches": [
     "refused"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Cnoc Buidhe Windfarm",
   "repd_ref_id": 13570,
   "technology": "Battery",
   "capacity_mw": 108.6,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004767",
   "operator": "Belltown Power Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 16 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-04-10",
     "months_waiting": 16
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Sloy Hydroelectric Power Station - Pumped Hydro Conversion",
   "repd_ref_id": 14006,
   "technology": "Pumped Storage Hydroelectricity",
   "capacity_mw": 100.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00006088",
   "operator": "Scottish & Southern Energy Renewables",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 18 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-01-21",
     "months_waiting": 18
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Loch Awe - Eredine Wind Farm",
   "repd_ref_id": 11667,
   "technology": "Wind Onshore",
   "capacity_mw": 100.0,
   "homes_equivalent": 87000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004517",
   "operator": "RWE Renewables UK Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 20 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2024-11-20",
     "months_waiting": 20
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Corr Chnoc Wind Farm",
   "repd_ref_id": 14299,
   "technology": "Wind Onshore",
   "capacity_mw": 86.4,
   "homes_equivalent": 76000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00006023",
   "operator": "Galileo Green Energy Scotland Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 17 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-03-04",
     "months_waiting": 17
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "An Carr Dubh Wind Farm",
   "repd_ref_id": 13805,
   "technology": "Wind Onshore",
   "capacity_mw": 85.8,
   "homes_equivalent": 75000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004781",
   "operator": "Statkraft UK Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 3.4 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2023-03-22",
     "months_waiting": 40
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Rowan Wind Farm",
   "repd_ref_id": 8534,
   "technology": "Wind Onshore",
   "capacity_mw": 85.8,
   "homes_equivalent": 75000,
   "status": "Awaiting Construction",
   "consented": "2024-04-26",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003230",
   "operator": "Energiekontor UK Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-04-26",
     "years_since_consent": 2.3
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Blarghour Wind Farm",
   "repd_ref_id": 6405,
   "technology": "Wind Onshore",
   "capacity_mw": 84.0,
   "homes_equivalent": 73000,
   "status": "Awaiting Construction",
   "consented": "2021-10-29",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "EC00005267",
   "operator": "Coriolis Energy / ESB",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2029, 8 years after it was approved",
    "who": "the grid operator (NESO) and SSEN Transmission",
    "evidence": {
     "project": "Blarghour Wind",
     "connection_date": "2029-04-01",
     "mw": 67.2,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2029",
   "tec": {
    "project": "Blarghour Wind",
    "connection_date": "2029-04-01",
    "connection_year": 2029,
    "mw": 67.2,
    "stage": null,
    "who": "the grid operator (NESO) and SSEN Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Tangy 4 Wind Farm",
   "repd_ref_id": 6734,
   "technology": "Wind Onshore",
   "capacity_mw": 80.0,
   "homes_equivalent": 70000,
   "status": "Awaiting Construction",
   "consented": "2019-12-20",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00000673",
   "operator": "Scottish & Southern (SSE)",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 7 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2019-12-20",
     "years_since_consent": 6.6
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Earraghail Renewable Energy Development",
   "repd_ref_id": 7873,
   "technology": "Wind Onshore",
   "capacity_mw": 78.0,
   "homes_equivalent": 68000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003421",
   "operator": "ScottishPower Renewables",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 4.4 years for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2022-02-21",
     "months_waiting": 53
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Narachan Wind Farm",
   "repd_ref_id": 7472,
   "technology": "Wind Onshore",
   "capacity_mw": 72.6,
   "homes_equivalent": 63000,
   "status": "Application Refused",
   "consented": null,
   "refused": "2024-03-08",
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00001884",
   "operator": "Energiekontor UK",
   "reason": {
    "reason": "refused",
    "label": "Refused by the Scottish Government (it decides big energy projects) in 2024",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "refusal_date": "2024-03-08"
    },
    "all_matches": [
     "refused"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "High Brenfield Wind Farm",
   "repd_ref_id": 15542,
   "technology": "Wind Onshore",
   "capacity_mw": 66.0,
   "homes_equivalent": 58000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004961",
   "operator": "Low Carbon Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 14 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-06-10",
     "months_waiting": 14
    },
    "all_matches": [
     "planning_overdue",
     "gate2",
     "connection_date"
    ]
   },
   "earliest": "2034",
   "tec": {
    "project": "High Brenfield 1",
    "connection_date": "2034-10-31",
    "connection_year": 2034,
    "mw": 52.8,
    "stage": null,
    "who": "the grid operator (NESO) and SSEN Transmission",
    "gate2_outcome": "Still in the grid queue review \u2014 no firm connection date yet",
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Allt Domhain Wind Farm, Glenbarr - Wind Turbines",
   "repd_ref_id": 19493,
   "technology": "Wind Onshore",
   "capacity_mw": 64.8,
   "homes_equivalent": 57000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003231",
   "operator": "Energiekontor UK Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 12 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-07-31",
     "months_waiting": 12
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Clachaig Glen",
   "repd_ref_id": 8000,
   "technology": "Wind Onshore",
   "capacity_mw": 60.0,
   "homes_equivalent": 52000,
   "status": "Awaiting Construction",
   "consented": "2024-11-05",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00002103",
   "operator": "RWE UK",
   "reason": {
    "reason": "connection_date",
    "label": "Its grid connection date of 2025 has passed and it is still not generating",
    "who": "the grid operator (NESO) and SSEN Transmission",
    "evidence": {
     "project": "Clachaig Glen Wind Farm",
     "connection_date": "2025-04-30",
     "mw": 52.8,
     "stage": 1.0,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2025",
   "tec": {
    "project": "Clachaig Glen Wind Farm",
    "connection_date": "2025-04-30",
    "connection_year": 2025,
    "mw": 52.8,
    "stage": 1.0,
    "who": "the grid operator (NESO) and SSEN Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Killean Wind Farm",
   "repd_ref_id": 14997,
   "technology": "Wind Onshore",
   "capacity_mw": 59.4,
   "homes_equivalent": 52000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004927",
   "operator": "RES Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 24 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2024-08-15",
     "months_waiting": 24
    },
    "all_matches": [
     "planning_overdue",
     "gate2",
     "connection_date"
    ]
   },
   "earliest": "2034",
   "tec": {
    "project": "Killean Wind Farm",
    "connection_date": "2034-10-31",
    "connection_year": 2034,
    "mw": 60.0,
    "stage": null,
    "who": "the grid operator (NESO) and SSEN Transmission",
    "gate2_outcome": "Still in the grid queue review \u2014 no firm connection date yet",
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Ladyfield Renewable Energy Park",
   "repd_ref_id": 15784,
   "technology": "Wind Onshore",
   "capacity_mw": 58.5,
   "homes_equivalent": 51000,
   "status": "Awaiting Construction",
   "consented": "2025-05-02",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003291",
   "operator": "Ridge Clean Energy Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-05-02",
     "years_since_consent": 1.3
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "High Constellation Wind Farm",
   "repd_ref_id": 10282,
   "technology": "Battery",
   "capacity_mw": 55.5,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2020-06-26",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00001857",
   "operator": "BayWa r.e. UK Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 6 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2020-06-26",
     "years_since_consent": 6.1
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "West Torrisdale Wind Farm",
   "repd_ref_id": 8490,
   "technology": "Wind Onshore",
   "capacity_mw": 54.0,
   "homes_equivalent": 47000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00002224",
   "operator": "ESB Asset Development UK",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 19 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-01-06",
     "months_waiting": 19
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Giants Burn Wind Farm-",
   "repd_ref_id": 16077,
   "technology": "Wind Onshore",
   "capacity_mw": 50.4,
   "homes_equivalent": 44000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00005007",
   "operator": "Statkraft UK Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 13 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-07-15",
     "months_waiting": 13
    },
    "all_matches": [
     "planning_overdue",
     "connection_date"
    ]
   },
   "earliest": "2023",
   "tec": {
    "project": "Pines Burn Wind Farm",
    "connection_date": "2023-08-02",
    "connection_year": 2023,
    "mw": 50.0,
    "stage": null,
    "who": "the grid operator (NESO) and SP Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Ardencaple Farm - Battery Storage",
   "repd_ref_id": 14381,
   "technology": "Battery",
   "capacity_mw": 50.0,
   "homes_equivalent": null,
   "status": "Application Refused",
   "consented": null,
   "refused": "2024-10-24",
   "planning_authority": "Argyll and Bute",
   "planning_ref": "23/02472/PP",
   "operator": "Ylem Energy Limited",
   "reason": {
    "reason": "refused",
    "label": "Refused by Argyll and Bute Council in 2024",
    "who": "Argyll and Bute Council",
    "evidence": {
     "refusal_date": "2024-10-24"
    },
    "all_matches": [
     "refused"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "SSE Taynuilt Substation - Battery Energy Storage",
   "repd_ref_id": 15648,
   "technology": "Battery",
   "capacity_mw": 49.9,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-11-14",
   "refused": null,
   "planning_authority": "Argyll and Bute",
   "planning_ref": "24/02083/PP",
   "operator": "Downing Energy Development Company Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-11-14",
     "years_since_consent": 0.7
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Beinn an Tuirc Windfarm Phase 3",
   "repd_ref_id": 3387,
   "technology": "Wind Onshore",
   "capacity_mw": 49.9,
   "homes_equivalent": 44000,
   "status": "Under Construction",
   "consented": "2017-02-23",
   "refused": null,
   "planning_authority": "Argyll and Bute",
   "planning_ref": "15/03057/PP",
   "operator": "Scottish Power Renewables",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2034, 17 years after it was approved",
    "who": "the grid operator (NESO) and SSEN Transmission",
    "evidence": {
     "project": "Beinn an Tuirc 1",
     "connection_date": "2034-10-31",
     "mw": 95.2,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "building"
    ]
   },
   "earliest": "2034",
   "tec": {
    "project": "Beinn an Tuirc 1",
    "connection_date": "2034-10-31",
    "connection_year": 2034,
    "mw": 95.2,
    "stage": null,
    "who": "the grid operator (NESO) and SSEN Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Glasvaar Wind Farm",
   "repd_ref_id": 9662,
   "technology": "Wind Onshore",
   "capacity_mw": 49.5,
   "homes_equivalent": 43000,
   "status": "Awaiting Construction",
   "consented": "2024-12-20",
   "refused": null,
   "planning_authority": "Argyll and Bute",
   "planning_ref": "22/01380/PP",
   "operator": "E Power Limited",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2037, 13 years after it was approved",
    "who": "the grid operator (NESO) and SSEN Transmission",
    "evidence": {
     "project": "Glasvaar",
     "connection_date": "2037-10-31",
     "mw": 36.0,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2037",
   "tec": {
    "project": "Glasvaar",
    "connection_date": "2037-10-31",
    "connection_year": 2037,
    "mw": 36.0,
    "stage": null,
    "who": "the grid operator (NESO) and SSEN Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "High Constellation Wind Farm",
   "repd_ref_id": 7345,
   "technology": "Wind Onshore",
   "capacity_mw": 48.0,
   "homes_equivalent": 42000,
   "status": "Awaiting Construction",
   "consented": "2020-06-26",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00001857",
   "operator": "BayWa r.e. UK Limited",
   "reason": {
    "reason": "gate2",
    "label": "Cleared the grid queue review, so it now has a firm connection date",
    "who": "the grid operator (NESO)",
    "evidence": {
     "project": "High Constellation Windfarm",
     "gate2_outcome": "Cleared the grid queue review, so it now has a firm connection date"
    },
    "all_matches": [
     "gate2",
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2028",
   "tec": {
    "project": "High Constellation Windfarm",
    "connection_date": "2028-10-31",
    "connection_year": 2028,
    "mw": 50.0,
    "stage": null,
    "who": "the grid operator (NESO) and SSEN Transmission",
    "gate2_outcome": "Cleared the grid queue review, so it now has a firm connection date",
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Cruach Clenamacrie Wind Farm",
   "repd_ref_id": 14548,
   "technology": "Wind Onshore",
   "capacity_mw": 45.0,
   "homes_equivalent": 39000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004841",
   "operator": "Voltalia",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 20 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2024-12-05",
     "months_waiting": 20
    },
    "all_matches": [
     "planning_overdue",
     "connection_date"
    ]
   },
   "earliest": "2034",
   "tec": {
    "project": "Cruach Glenamachrie Wind Farm",
    "connection_date": "2034-10-31",
    "connection_year": 2034,
    "mw": 50.0,
    "stage": null,
    "who": "the grid operator (NESO) and SSEN Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Ladyfield Renewable Energy Park",
   "repd_ref_id": 15785,
   "technology": "Battery",
   "capacity_mw": 41.4,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-05-02",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003291",
   "operator": "Ridge Clean Energy Limited",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2029, 4 years after it was approved",
    "who": "the grid operator (NESO) and SSEN Transmission",
    "evidence": {
     "project": "Ladyfield Renewable Energy Park",
     "connection_date": "2029-10-31",
     "mw": 68.0,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2029",
   "tec": {
    "project": "Ladyfield Renewable Energy Park",
    "connection_date": "2029-10-31",
    "connection_year": 2029,
    "mw": 68.0,
    "stage": null,
    "who": "the grid operator (NESO) and SSEN Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Cruachan Upgrade Project (Unis 3 & 4)",
   "repd_ref_id": 15543,
   "technology": "Pumped Storage Hydroelectricity",
   "capacity_mw": 40.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2023-12-14",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004537",
   "operator": "Drax Power Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-12-14",
     "years_since_consent": 2.6
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Sheirdrim Renewable Energy Development - Battery",
   "repd_ref_id": 7585,
   "technology": "Battery",
   "capacity_mw": 38.0,
   "homes_equivalent": null,
   "status": "Appeal Refused",
   "consented": null,
   "refused": "2023-06-26",
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00001957",
   "operator": "ScottishPower Renewables",
   "reason": {
    "reason": "refused",
    "label": "Refused by the Scottish Government (it decides big energy projects) in 2023",
    "who": "the planning appeal inspector",
    "evidence": {
     "refusal_date": "2023-06-26"
    },
    "all_matches": [
     "refused"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Beinn Ghlas Wind Farm - Repowering",
   "repd_ref_id": 11843,
   "technology": "Wind Onshore",
   "capacity_mw": 33.6,
   "homes_equivalent": 29000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "25/01240/PP",
   "operator": "Nadara Limited (Beaufort Wind Limited)",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2025, still waiting for a decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-08-27",
     "months_waiting": 11
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Clachaig Glen",
   "repd_ref_id": 10996,
   "technology": "Battery",
   "capacity_mw": 30.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2024-11-05",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00002103",
   "operator": "RWE UK",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-11-05",
     "years_since_consent": 1.7
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Creag Dhubh",
   "repd_ref_id": 7459,
   "technology": "Wind Onshore",
   "capacity_mw": 27.0,
   "homes_equivalent": 24000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Argyll and Bute",
   "planning_ref": "19/02544/PP",
   "operator": "Muirden Energy",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 6.7 years for a planning decision",
    "who": "Argyll and Bute Council",
    "evidence": {
     "submitted": "2019-12-05",
     "months_waiting": 80
    },
    "all_matches": [
     "planning_overdue",
     "connection_date"
    ]
   },
   "earliest": "2030",
   "tec": {
    "project": "Creag Dhubh",
    "connection_date": "2030-10-31",
    "connection_year": 2030,
    "mw": 38.34,
    "stage": null,
    "who": "the grid operator (NESO) and SSEN Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Eascairt Wind Farm",
   "repd_ref_id": 5123,
   "technology": "Wind Onshore",
   "capacity_mw": 26.0,
   "homes_equivalent": 23000,
   "status": "Awaiting Construction",
   "consented": "2018-09-28",
   "refused": "2016-09-21",
   "planning_authority": "Argyll and Bute",
   "planning_ref": "15/00205/PP",
   "operator": "Infinergy (formerly PI Renewables)",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 8 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2018-09-28",
     "years_since_consent": 7.8
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Corr Chnoc Wind Farm",
   "repd_ref_id": 14300,
   "technology": "Battery",
   "capacity_mw": 25.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00006023",
   "operator": "Galileo Green Energy Scotland Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 17 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-03-04",
     "months_waiting": 17
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Earraghail Renewable Energy Development",
   "repd_ref_id": 10712,
   "technology": "Battery",
   "capacity_mw": 25.0,
   "homes_equivalent": null,
   "status": "Application Refused",
   "consented": null,
   "refused": "2025-02-14",
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003421",
   "operator": "ScottishPower Renewables",
   "reason": {
    "reason": "refused",
    "label": "Refused by the Scottish Government (it decides big energy projects) in 2025",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "refusal_date": "2025-02-14"
    },
    "all_matches": [
     "refused"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Giants Burn Wind Farm -Batter Energy Storage",
   "repd_ref_id": 16078,
   "technology": "Battery",
   "capacity_mw": 23.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00005007",
   "operator": "Statkraft UK Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 13 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-07-15",
     "months_waiting": 13
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Sheirdrim Renewable Energy Development - Solar",
   "repd_ref_id": 7584,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 20.0,
   "homes_equivalent": 7300,
   "status": "Appeal Refused",
   "consented": null,
   "refused": "2023-06-26",
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00001957",
   "operator": "ScottishPower Renewables",
   "reason": {
    "reason": "refused",
    "label": "Refused by the Scottish Government (it decides big energy projects) in 2023",
    "who": "the planning appeal inspector",
    "evidence": {
     "refusal_date": "2023-06-26"
    },
    "all_matches": [
     "refused"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "West Torrisdale Wind Farm",
   "repd_ref_id": 12875,
   "technology": "Battery",
   "capacity_mw": 20.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00002224",
   "operator": "ESB Asset Development UK",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 19 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2025-01-06",
     "months_waiting": 19
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Cruach Clenamacrie Wind Farm",
   "repd_ref_id": 14549,
   "technology": "Battery",
   "capacity_mw": 20.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004841",
   "operator": "Voltalia",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 20 months for a planning decision",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "submitted": "2024-12-05",
     "months_waiting": 20
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Earraghail Renewable Energy Development",
   "repd_ref_id": 10711,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 5.0,
   "homes_equivalent": 1800,
   "status": "Application Refused",
   "consented": null,
   "refused": "2025-02-14",
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003421",
   "operator": "ScottishPower Renewables",
   "reason": {
    "reason": "refused",
    "label": "Refused by the Scottish Government (it decides big energy projects) in 2025",
    "who": "the Scottish Government (it decides big energy projects)",
    "evidence": {
     "refusal_date": "2025-02-14"
    },
    "all_matches": [
     "refused"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Rowan Wind Farm",
   "repd_ref_id": 16737,
   "technology": "Battery",
   "capacity_mw": 5.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2024-04-26",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00003230",
   "operator": "Energiekontor UK Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-04-26",
     "years_since_consent": 2.3
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Cnocbreac Inver Estate - Solar Generation",
   "repd_ref_id": 15481,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 2.1,
   "homes_equivalent": 800,
   "status": "Under Construction",
   "consented": "2024-10-28",
   "refused": null,
   "planning_authority": "Argyll and Bute",
   "planning_ref": "24/01390/PP",
   "operator": "Inver Hydro Limited",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Allt Easach Hydro",
   "repd_ref_id": 6724,
   "technology": "Small Hydro",
   "capacity_mw": 2.0,
   "homes_equivalent": 2300,
   "status": "Awaiting Construction",
   "consented": "2019-03-15",
   "refused": null,
   "planning_authority": "Argyll and Bute",
   "planning_ref": "18/01257/PP",
   "operator": "Green Highland Renewables",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 7 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2019-03-15",
     "years_since_consent": 7.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Glen Noe River",
   "repd_ref_id": 5962,
   "technology": "Small Hydro",
   "capacity_mw": 2.0,
   "homes_equivalent": 2300,
   "status": "Under Construction",
   "consented": "2016-09-09",
   "refused": null,
   "planning_authority": "Argyll and Bute",
   "planning_ref": "15/03129/PP",
   "operator": "RWE Npower Renewables / Innogy",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Glen Etive Estate Phase I (Allt na Chaorainn)",
   "repd_ref_id": 6675,
   "technology": "Small Hydro",
   "capacity_mw": 1.4,
   "homes_equivalent": 1600,
   "status": "Under Construction",
   "consented": "2018-08-31",
   "refused": null,
   "planning_authority": "Highland",
   "planning_ref": "18/02742/FUL",
   "operator": "Dickins Hydro Resources",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Allt Charnan",
   "repd_ref_id": 6657,
   "technology": "Small Hydro",
   "capacity_mw": 1.0,
   "homes_equivalent": 1100,
   "status": "Awaiting Construction",
   "consented": "2019-03-05",
   "refused": null,
   "planning_authority": "Highland",
   "planning_ref": "18/02738/FUL",
   "operator": "Dickins Hydro Resources",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 7 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2019-03-05",
     "years_since_consent": 7.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "S14000106",
  "S14000105",
  "S14000065",
  "S14000094"
 ],
 "flags": [],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}