 "pcon24cd": "S14000051",
 "name": "Orkney and Shetland",
 "nation": "Scotland",
 "number1": {
  "visible": true,
  "cost_gbp_12m": 15000000,
  "cost_gbp_12m_exact": 14903316,
  "curtailed_mwh_12m": 1276439,
  "rank_of_visible": 6,
  "visible_seats": 19,
  "framings": {
   "hours_of_seat_homes_electricity": 9432.4,
   "homes_for_a_year_energy_lost": 511000
  },
  "sites": [
   {
    "site_name": "Viking Wind Farm",
    "repd_ref_id": 6828,
    "cost_gbp_12m": 15000000,
    "curtailed_mwh_12m": 1276439,
    "homes_for_a_year": 511000,
    "mapping_confidence": "high"
   }
  ],
  "invisible_wind": {
   "mw": 50.4,
   "sites": 16
  }
 },
 "number2": {
  "stuck_mw": 332.6,
  "stuck_mw_int": 333,
  "stuck_sites": 11,
  "homes_equivalent": 291000,
  "homes_vs_seat_households": 13.72,
  "stuck_mw_12m_cut": 338.1,
  "consented_not_built_mw_any_age": 338.1,
  "operational_mw": 493.4,
  "operational_homes_equivalent": 432000,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 1.8,
  "median_months_to_decision": 7.5,
  "rank": 12,
  "tech_mix": {
   "onshore wind": 332.6
  },
  "tech_summary": "all onshore wind",
  "waiting_vs_running": 0.7,
  "projects": [
   {
    "site_name": "Energy Isles Wind Farm",
    "repd_ref_id": 14999,
    "technology": "Wind Onshore",
    "capacity_mw": 126.0,
    "homes_equivalent": 110000,
    "consented": "2023-10-02",
    "months_waiting": 34.0,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Beaw Field Wind Farm",
    "repd_ref_id": 3516,
    "technology": "Wind Onshore",
    "capacity_mw": 59.5,
    "homes_equivalent": 52000,
    "consented": "2017-11-30",
    "months_waiting": 104.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Mossy Hill",
    "repd_ref_id": 6384,
    "technology": "Wind Onshore",
    "capacity_mw": 46.8,
    "homes_equivalent": 41000,
    "consented": "2019-05-27",
    "months_waiting": 86.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Orkney\u2019s Community Wind Farm Project - Qanterness",
    "repd_ref_id": 7394,
    "technology": "Wind Onshore",
    "capacity_mw": 28.8,
    "homes_equivalent": 25000,
    "consented": "2021-12-21",
    "months_waiting": 55.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Orkney\u2019s Community Wind Farm Project - Hoy",
    "repd_ref_id": 8397,
    "technology": "Wind Onshore",
    "capacity_mw": 28.8,
    "homes_equivalent": 25000,
    "consented": "2021-12-21",
    "months_waiting": 55.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Hesta Head Wind Farm",
    "repd_ref_id": 5198,
    "technology": "Wind Onshore",
    "capacity_mw": 20.4,
    "homes_equivalent": 18000,
    "consented": "2019-04-18",
    "months_waiting": 87.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Costa Head Wind Farm",
    "repd_ref_id": 5188,
    "technology": "Wind Onshore",
    "capacity_mw": 16.3,
    "homes_equivalent": 14000,
    "consented": "2019-04-18",
    "months_waiting": 87.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Luggies Knowe, Hill Of Gremista - Wind Turbines & Battery Storage",
    "repd_ref_id": 15822,
    "technology": "Wind Onshore",
    "capacity_mw": 5.0,
    "homes_equivalent": 4400,
    "consented": "2025-04-18",
    "months_waiting": 15.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Akla",
    "repd_ref_id": 3789,
    "technology": "Wind Onshore",
    "capacity_mw": 2.7,
    "homes_equivalent": 2400,
    "consented": "2012-12-17",
    "months_waiting": 163.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "North Hoo Fields",
    "repd_ref_id": 17799,
    "technology": "Wind Onshore",
    "capacity_mw": 2.3,
    "homes_equivalent": 2000,
    "consented": "2024-07-11",
    "months_waiting": 24.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Hammer, Skelwick - Wind Turbine",
    "repd_ref_id": 13407,
    "technology": "Wind Onshore",
    "capacity_mw": 0.5,
    "homes_equivalent": 400,
    "consented": "2023-12-01",
    "months_waiting": 32.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Ludenhill, Lochside Road - Wind Turbine",
    "repd_ref_id": 13412,
    "technology": "Wind Onshore",
    "capacity_mw": 0.5,
    "homes_equivalent": 400,
    "consented": "2024-03-26",
    "months_waiting": 28.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "New Holland, Stratheast Road -Wind Turbine",
    "repd_ref_id": 17370,
    "technology": "Wind Onshore",
    "capacity_mw": 0.5,
    "homes_equivalent": 400,
    "consented": "2025-02-24",
    "months_waiting": 17.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Newark, Skelwick - Wind Turbine",
    "repd_ref_id": 17113,
    "technology": "Wind Onshore",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2025-02-13",
    "months_waiting": 17.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Harbour Authority Building, St Ola - Wind Turbine",
    "repd_ref_id": 17434,
    "technology": "Wind Onshore",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2025-02-06",
    "months_waiting": 17.8,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 21204,
  "seat_total_gbp": 1900000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 3.0,
  "building_mw": 70.0,
  "approved_mw": 14.9,
  "approved_24m_mw": 0.0,
  "refused_mw": 0.0,
  "submitted_mw": 10.0,
  "sites": [
   {
    "site_name": "Shetland Battery Energy Storage System",
    "capacity_mw": 70.0,
    "status": "building",
    "year": 2024,
    "homes_while_discharging": 245000
   },
   {
    "site_name": "Luggies Knowe, Hill Of Gremista - Wind Turbines & Battery Storage",
    "capacity_mw": 14.9,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 52000
   },
   {
    "site_name": "Greentoft, Neven Point, Eday - Wind Turbines &  BESS",
    "capacity_mw": 10.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 35000
   },
   {
    "site_name": "Orkney Storage Park Project",
    "capacity_mw": 2.0,
    "status": "operating",
    "year": null,
    "homes_while_discharging": 7000
   },
   {
    "site_name": "Northern Isles New Energy Solution (NINES) 1",
    "capacity_mw": 1.0,
    "status": "operating",
    "year": null,
    "homes_while_discharging": 3500
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Energy Isles Wind Farm",
   "repd_ref_id": 14999,
   "technology": "Wind Onshore",
   "capacity_mw": 126.0,
   "homes_equivalent": 110000,
   "status": "Awaiting Construction",
   "consented": "2023-10-02",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00001844",
   "operator": "Energy Isles / Stratcraft",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2032, 9 years after it was approved",
    "who": "the grid operator (NESO) and SSEN Transmission",
    "evidence": {
     "project": "Energy Isles",
     "connection_date": "2032-10-30",
     "mw": 120.3,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2032",
   "tec": {
    "project": "Energy Isles",
    "connection_date": "2032-10-30",
    "connection_year": 2032,
    "mw": 120.3,
    "stage": null,
    "who": "the grid operator (NESO) and SSEN Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Shetland Battery Energy Storage System",
   "repd_ref_id": 12856,
   "technology": "Battery",
   "capacity_mw": 70.0,
   "homes_equivalent": null,
   "status": "Under Construction",
   "consented": "2024-02-21",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "ECU00004881",
   "operator": "Zenobe Energy",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Beaw Field Wind Farm",
   "repd_ref_id": 3516,
   "technology": "Wind Onshore",
   "capacity_mw": 59.5,
   "homes_equivalent": 52000,
   "status": "Awaiting Construction",
   "consented": "2017-11-30",
   "refused": null,
   "planning_authority": "Scottish Government (S36)",
   "planning_ref": "EC00003121",
   "operator": "Peel Wind Farms",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2032, 15 years after it was approved",
    "who": "the grid operator (NESO) and SSEN Transmission",
    "evidence": {
     "project": "Beaw Field Wind Farm",
     "connection_date": "2032-10-29",
     "mw": 102.0,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2032",
   "tec": {
    "project": "Beaw Field Wind Farm",
    "connection_date": "2032-10-29",
    "connection_year": 2032,
    "mw": 102.0,
    "stage": null,
    "who": "the grid operator (NESO) and SSEN Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Mossy Hill",
   "repd_ref_id": 6384,
   "technology": "Wind Onshore",
   "capacity_mw": 46.8,
   "homes_equivalent": 41000,
   "status": "Awaiting Construction",
   "consented": "2019-05-27",
   "refused": null,
   "planning_authority": "Shetland Islands",
   "planning_ref": "2018/186/PPF",
   "operator": "Peel Wind Farms (Peel Energy)",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2028, 9 years after it was approved",
    "who": "the grid operator (NESO) and SSEN Transmission",
    "evidence": {
     "project": "Mossy Hill Wind Farm",
     "connection_date": "2028-11-30",
     "mw": 48.0,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2028",
   "tec": {
    "project": "Mossy Hill Wind Farm",
    "connection_date": "2028-11-30",
    "connection_year": 2028,
    "mw": 48.0,
    "stage": null,
    "who": "the grid operator (NESO) and SSEN Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Orkney\u2019s Community Wind Farm Project - Qanterness",
   "repd_ref_id": 7394,
   "technology": "Wind Onshore",
   "capacity_mw": 28.8,
   "homes_equivalent": 25000,
   "status": "Awaiting Construction",
   "consented": "2021-12-21",
   "refused": null,
   "planning_authority": "Orkney Islands",
   "planning_ref": "20/037/TPPMAJ",
   "operator": "Orkney Islands Council",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2028, 7 years after it was approved",
    "who": "the grid operator (NESO) and SSEN Transmission",
    "evidence": {
     "project": "Orkney community wind farm - Quanterness",
     "connection_date": "2028-06-30",
     "mw": 30.0,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2028",
   "tec": {
    "project": "Orkney community wind farm - Quanterness",
    "connection_date": "2028-06-30",
    "connection_year": 2028,
    "mw": 30.0,
    "stage": null,
    "who": "the grid operator (NESO) and SSEN Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Orkney\u2019s Community Wind Farm Project - Hoy",
   "repd_ref_id": 8397,
   "technology": "Wind Onshore",
   "capacity_mw": 28.8,
   "homes_equivalent": 25000,
   "status": "Awaiting Construction",
   "consented": "2021-12-21",
   "refused": null,
   "planning_authority": "Orkney Islands",
   "planning_ref": "20/313/TPPMAJ",
   "operator": "Orkney Islands Council",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2028, 7 years after it was approved",
    "who": "the grid operator (NESO) and SSEN Transmission",
    "evidence": {
     "project": "Orkney Community Wind Farm - Hoy",
     "connection_date": "2028-06-30",
     "mw": 30.0,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2028",
   "tec": {
    "project": "Orkney Community Wind Farm - Hoy",
    "connection_date": "2028-06-30",
    "connection_year": 2028,
    "mw": 30.0,
    "stage": null,
    "who": "the grid operator (NESO) and SSEN Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Orkney\u2019s Community Wind Farm Project - Faray",
   "repd_ref_id": 9300,
   "technology": "Wind Onshore",
   "capacity_mw": 28.8,
   "homes_equivalent": 25000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Orkney Islands",
   "planning_ref": "21/240/TPPMAJ",
   "operator": "Orkney Islands Council",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 5.1 years for a planning decision",
    "who": "Orkney Islands Council",
    "evidence": {
     "submitted": "2021-06-25",
     "months_waiting": 61
    },
    "all_matches": [
     "planning_overdue",
     "connection_date"
    ]
   },
   "earliest": "2030",
   "tec": {
    "project": "Orkney Community Wind Farm - Faray",
    "connection_date": "2030-05-30",
    "connection_year": 2030,
    "mw": 30.0,
    "stage": null,
    "who": "the grid operator (NESO) and SSEN Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Nitshill Wind Farm, Hundland Hill",
   "repd_ref_id": 10883,
   "technology": "Wind Onshore",
   "capacity_mw": 26.4,
   "homes_equivalent": 23000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Orkney Islands",
   "planning_ref": "22/320/TPPMAJ",
   "operator": "Nisthill Wind Farm Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 3.9 years for a planning decision",
    "who": "Orkney Islands Council",
    "evidence": {
     "submitted": "2022-09-07",
     "months_waiting": 47
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Greentoft, Neven Point, Eday - Wind Turbines &  BESS",
   "repd_ref_id": 19258,
   "technology": "Wind Onshore",
   "capacity_mw": 24.0,
   "homes_equivalent": 21000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Orkney Islands",
   "planning_ref": "25/203/TPPMAJ",
   "operator": "Green Power (International) Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 13 months for a planning decision",
    "who": "Orkney Islands Council",
    "evidence": {
     "submitted": "2025-06-23",
     "months_waiting": 13
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Hesta Head Wind Farm",
   "repd_ref_id": 5198,
   "technology": "Wind Onshore",
   "capacity_mw": 20.4,
   "homes_equivalent": 18000,
   "status": "Awaiting Construction",
   "consented": "2019-04-18",
   "refused": "2018-09-21",
   "planning_authority": "Orkney Islands",
   "planning_ref": "17/083/TPPMAJ",
   "operator": "Hoolan Energy/ Hesta Head Wind Farm",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2029, 10 years after it was approved",
    "who": "the grid operator (NESO) and SSEN Transmission",
    "evidence": {
     "project": "Hesta Head",
     "connection_date": "2029-04-06",
     "mw": 20.4,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2029",
   "tec": {
    "project": "Hesta Head",
    "connection_date": "2029-04-06",
    "connection_year": 2029,
    "mw": 20.4,
    "stage": null,
    "who": "the grid operator (NESO) and SSEN Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Costa Head Wind Farm",
   "repd_ref_id": 5188,
   "technology": "Wind Onshore",
   "capacity_mw": 16.3,
   "homes_equivalent": 14000,
   "status": "Awaiting Construction",
   "consented": "2019-04-18",
   "refused": "2018-09-21",
   "planning_authority": "Orkney Islands",
   "planning_ref": "16/580/TPPMAJ",
   "operator": "Hoolan Energy",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2029, 10 years after it was approved",
    "who": "the grid operator (NESO) and SSEN Transmission",
    "evidence": {
     "project": "Costa Head",
     "connection_date": "2029-04-06",
     "mw": 16.32,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2029",
   "tec": {
    "project": "Costa Head",
    "connection_date": "2029-04-06",
    "connection_year": 2029,
    "mw": 16.32,
    "stage": null,
    "who": "the grid operator (NESO) and SSEN Transmission",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Luggies Knowe, Hill Of Gremista - Wind Turbines & Battery Storage",
   "repd_ref_id": 15823,
   "technology": "Battery",
   "capacity_mw": 14.9,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-04-18",
   "refused": null,
   "planning_authority": "Shetland Islands",
   "planning_ref": "2024/006/PPF",
   "operator": "Shetland Aerogenerators Ltd",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-04-18",
     "years_since_consent": 1.3
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Greentoft, Neven Point, Eday - Wind Turbines &  BESS",
   "repd_ref_id": 19259,
   "technology": "Battery",
   "capacity_mw": 10.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Orkney Islands",
   "planning_ref": "25/203/TPPMAJ",
   "operator": "Green Power (International) Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 13 months for a planning decision",
    "who": "Orkney Islands Council",
    "evidence": {
     "submitted": "2025-06-23",
     "months_waiting": 13
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Hill Of Wethersta - Wind Turbines",
   "repd_ref_id": 20622,
   "technology": "Wind Onshore",
   "capacity_mw": 10.0,
   "homes_equivalent": 8700,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Shetland Islands",
   "planning_ref": "2026/052/PPF",
   "operator": "Wetha Wind Limited",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2026, still waiting for a decision",
    "who": "Shetland Islands Council",
    "evidence": {
     "submitted": "2026-03-10",
     "months_waiting": 5
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Sullom Voe Terminal, Callbackness - Wind Turbines",
   "repd_ref_id": 17510,
   "technology": "Wind Onshore",
   "capacity_mw": 9.6,
   "homes_equivalent": 8400,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Shetland Islands",
   "planning_ref": "2025/317/PPF",
   "operator": "EnQuest Plc",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2025, still waiting for a decision",
    "who": "Shetland Islands Council",
    "evidence": {
     "submitted": "2025-12-19",
     "months_waiting": 7
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Luggies Knowe, Hill Of Gremista - Wind Turbines & Battery Storage",
   "repd_ref_id": 15822,
   "technology": "Wind Onshore",
   "capacity_mw": 5.0,
   "homes_equivalent": 4400,
   "status": "Awaiting Construction",
   "consented": "2025-04-18",
   "refused": null,
   "planning_authority": "Shetland Islands",
   "planning_ref": "2024/006/PPF",
   "operator": "Shetland Aerogenerators Ltd",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-04-18",
     "years_since_consent": 1.3
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Akla",
   "repd_ref_id": 3789,
   "technology": "Wind Onshore",
   "capacity_mw": 2.7,
   "homes_equivalent": 2400,
   "status": "Awaiting Construction",
   "consented": "2012-12-17",
   "refused": null,
   "planning_authority": "Orkney Islands",
   "planning_ref": "10/631/PP",
   "operator": "Orkney Sustainable Energy",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 14 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2012-12-17",
     "years_since_consent": 13.6
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Culterfield, Cunningsburgh Wind",
   "repd_ref_id": 9031,
   "technology": "Wind Onshore",
   "capacity_mw": 2.7,
   "homes_equivalent": 2400,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Shetland Islands",
   "planning_ref": "2021/136/PPF",
   "operator": "Freelight (Shetland) Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 5.2 years for a planning decision",
    "who": "Shetland Islands Council",
    "evidence": {
     "submitted": "2021-05-05",
     "months_waiting": 63
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "North Hoo Fields",
   "repd_ref_id": 17799,
   "technology": "Wind Onshore",
   "capacity_mw": 2.3,
   "homes_equivalent": 2000,
   "status": "Awaiting Construction",
   "consented": "2024-07-11",
   "refused": null,
   "planning_authority": "Shetland Islands",
   "planning_ref": "2023/275/PPF",
   "operator": "North Fish",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-07-11",
     "years_since_consent": 2.1
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Akla Wind Energy Project - Wind Turbine",
   "repd_ref_id": 18712,
   "technology": "Wind Onshore",
   "capacity_mw": 2.0,
   "homes_equivalent": 1700,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Orkney Islands",
   "planning_ref": "25/079/TPP",
   "operator": "Orkney Renewables Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 16 months for a planning decision",
    "who": "Orkney Islands Council",
    "evidence": {
     "submitted": "2025-04-08",
     "months_waiting": 16
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "S14000069",
  "S14000062",
  "S14000091"
 ],
 "flags": [],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}