 "pcon24cd": "N05000013",
 "name": "North Down",
 "nation": "Northern Ireland",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 0.0,
  "stuck_mw_int": 0,
  "stuck_sites": 0,
  "homes_equivalent": 0,
  "homes_vs_seat_households": 0.0,
  "stuck_mw_12m_cut": 0.0,
  "consented_not_built_mw_any_age": 0.0,
  "operational_mw": 0.0,
  "operational_homes_equivalent": 0,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": null,
  "rank": 569,
  "tech_mix": {},
  "tech_summary": null,
  "waiting_vs_running": null,
  "projects": []
 },
 "number3": {
  "applicable": false,
  "note": "Northern Ireland is part of the all-Ireland Single Electricity Market, not the GB grid, so GB bottleneck costs do not apply."
 },
 "batteries": {
  "operating_mw": 0,
  "building_mw": 0,
  "approved_mw": 0,
  "approved_24m_mw": 0,
  "refused_mw": 0,
  "submitted_mw": 0,
  "sites": []
 },
 "pipeline_projects": [],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "N05000016",
  "N05000001"
 ],
 "flags": [
  "curtailment_not_visible",
  "ni_sem"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}