 "pcon24cd": "N05000012",
 "name": "North Antrim",
 "nation": "Northern Ireland",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 118.9,
   "sites": 10
  }
 },
 "number2": {
  "stuck_mw": 22.1,
  "stuck_mw_int": 22,
  "stuck_sites": 8,
  "homes_equivalent": 19000,
  "homes_vs_seat_households": 0.46,
  "stuck_mw_12m_cut": 26.6,
  "consented_not_built_mw_any_age": 26.6,
  "operational_mw": 180.8,
  "operational_homes_equivalent": 126000,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.2,
  "median_months_to_decision": 11.1,
  "rank": 191,
  "tech_mix": {
   "onshore wind": 22.1
  },
  "tech_summary": "all onshore wind",
  "waiting_vs_running": 0.1,
  "projects": [
   {
    "site_name": "Corkey Windfarm (repowering)",
    "repd_ref_id": 7543,
    "technology": "Wind Onshore",
    "capacity_mw": 20.0,
    "homes_equivalent": 17000,
    "consented": "2022-03-02",
    "months_waiting": 53.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Solar PV Development in Ballymena",
    "repd_ref_id": 16454,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 2.5,
    "homes_equivalent": 900,
    "consented": "2024-08-16",
    "months_waiting": 23.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Solar PV Energy Development in Ballymena",
    "repd_ref_id": 16451,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 2.0,
    "homes_equivalent": 700,
    "consented": "2024-08-14",
    "months_waiting": 23.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "93 Caddy Road - Wind Turbine",
    "repd_ref_id": 13668,
    "technology": "Wind Onshore",
    "capacity_mw": 0.8,
    "homes_equivalent": 700,
    "consented": "2023-12-01",
    "months_waiting": 32.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Islandranny Road",
    "repd_ref_id": 6774,
    "technology": "Wind Onshore",
    "capacity_mw": 0.3,
    "homes_equivalent": 300,
    "consented": "2019-06-18",
    "months_waiting": 85.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Stroan Road",
    "repd_ref_id": 7931,
    "technology": "Wind Onshore",
    "capacity_mw": 0.3,
    "homes_equivalent": 300,
    "consented": "2022-06-29",
    "months_waiting": 49.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Moyarget Road",
    "repd_ref_id": 8135,
    "technology": "Wind Onshore",
    "capacity_mw": 0.3,
    "homes_equivalent": 300,
    "consented": "2022-04-06",
    "months_waiting": 51.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Carmagrim Road",
    "repd_ref_id": 7809,
    "technology": "Wind Onshore",
    "capacity_mw": 0.2,
    "homes_equivalent": 200,
    "consented": "2021-04-06",
    "months_waiting": 63.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Replacement Wind Turbine",
    "repd_ref_id": 8431,
    "technology": "Wind Onshore",
    "capacity_mw": 0.1,
    "homes_equivalent": 100,
    "consented": "2021-07-22",
    "months_waiting": 60.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Drumack Lane Replacement Turbine",
    "repd_ref_id": 8877,
    "technology": "Wind Onshore",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2022-02-23",
    "months_waiting": 53.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Solar PV Energy Development in Ballycastle",
    "repd_ref_id": 16293,
    "technology": "Solar Photovoltaics",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2024-10-08",
    "months_waiting": 21.8,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": false,
  "note": "Northern Ireland is part of the all-Ireland Single Electricity Market, not the GB grid, so GB bottleneck costs do not apply."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 0.0,
  "approved_mw": 1.0,
  "approved_24m_mw": 1.0,
  "refused_mw": 0.0,
  "submitted_mw": 100.0,
  "sites": [
   {
    "site_name": "Energy Storage System Installation in Rasharkin",
    "capacity_mw": 100.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 350000
   },
   {
    "site_name": "Battery Energy Storage System in Ballycastle",
    "capacity_mw": 1.0,
    "status": "approved",
    "year": 2024,
    "homes_while_discharging": 3500
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Energy Storage System Installation in Rasharkin",
   "repd_ref_id": 18463,
   "technology": "Battery",
   "capacity_mw": 100.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Causeway Coast and Glens",
   "planning_ref": "LA01/2025/0181/F",
   "operator": "Renewable Energy Systems (RES)",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 17 months for a planning decision",
    "who": "Causeway Coast and Glens Council",
    "evidence": {
     "submitted": "2025-02-28",
     "months_waiting": 17
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Corkey Windfarm (repowering)",
   "repd_ref_id": 7543,
   "technology": "Wind Onshore",
   "capacity_mw": 20.0,
   "homes_equivalent": 17000,
   "status": "Awaiting Construction",
   "consented": "2022-03-02",
   "refused": null,
   "planning_authority": "Causeway Coast and Glens",
   "planning_ref": "LA01/2019/0772/F",
   "operator": "ScottishPower Renewables",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-03-02",
     "years_since_consent": 4.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Solar PV Development in Ballymena",
   "repd_ref_id": 16454,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 2.5,
   "homes_equivalent": 900,
   "status": "Awaiting Construction",
   "consented": "2024-08-16",
   "refused": null,
   "planning_authority": "Mid and East Antrim",
   "planning_ref": "LA02/2024/0352/F",
   "operator": "HHT  Management Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-08-16",
     "years_since_consent": 2.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Solar PV Energy Development in Ballymena",
   "repd_ref_id": 16451,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 2.0,
   "homes_equivalent": 700,
   "status": "Awaiting Construction",
   "consented": "2024-08-14",
   "refused": null,
   "planning_authority": "Mid and East Antrim",
   "planning_ref": "LA02/2024/0353/F",
   "operator": "HHT  Management Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-08-14",
     "years_since_consent": 2.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Battery Energy Storage System in Ballycastle",
   "repd_ref_id": 15516,
   "technology": "Battery",
   "capacity_mw": 1.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2024-03-20",
   "refused": null,
   "planning_authority": "Causeway Coast and Glens",
   "planning_ref": "LA01/2023/1223/F",
   "operator": "HHT Renewables Ltd",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-03-20",
     "years_since_consent": 2.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "N05000014",
  "N05000010",
  "N05000005",
  "N05000006"
 ],
 "flags": [
  "curtailment_not_visible",
  "ni_sem",
  "11_sites_geocoded_by_fallback"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}