 "pcon24cd": "N05000009",
 "name": "Lagan Valley",
 "nation": "Northern Ireland",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 0.5,
  "stuck_mw_int": 0,
  "stuck_sites": 3,
  "homes_equivalent": 400,
  "homes_vs_seat_households": 0.01,
  "stuck_mw_12m_cut": 1.2,
  "consented_not_built_mw_any_age": 2.0,
  "operational_mw": 76.2,
  "operational_homes_equivalent": 28000,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 39.3,
  "rank": 486,
  "tech_mix": {
   "onshore wind": 0.5
  },
  "tech_summary": "all onshore wind",
  "waiting_vs_running": 0.0,
  "projects": [
   {
    "site_name": "8 Church Road, Dromara - Wind Turbine",
    "repd_ref_id": 14130,
    "technology": "Wind Onshore",
    "capacity_mw": 0.8,
    "homes_equivalent": 700,
    "consented": "2026-06-08",
    "months_waiting": 1.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Solar PV Development in Lisburn",
    "repd_ref_id": 17115,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.7,
    "homes_equivalent": 300,
    "consented": "2025-06-30",
    "months_waiting": 13.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Ballinderry Road",
    "repd_ref_id": 7603,
    "technology": "Wind Onshore",
    "capacity_mw": 0.3,
    "homes_equivalent": 300,
    "consented": "2020-11-10",
    "months_waiting": 68.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Lagangreen Road",
    "repd_ref_id": 7563,
    "technology": "Wind Onshore",
    "capacity_mw": 0.2,
    "homes_equivalent": 200,
    "consented": "2024-02-02",
    "months_waiting": 30.0,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Garvaghy Road Replacement Turbine",
    "repd_ref_id": 8872,
    "technology": "Wind Onshore",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2024-06-26",
    "months_waiting": 25.2,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": false,
  "note": "Northern Ireland is part of the all-Ireland Single Electricity Market, not the GB grid, so GB bottleneck costs do not apply."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 0.0,
  "approved_mw": 150.0,
  "approved_24m_mw": 0.0,
  "refused_mw": 0.0,
  "submitted_mw": 0.0,
  "sites": [
   {
    "site_name": "Battery Storage System Development in Lisburn",
    "capacity_mw": 150.0,
    "status": "approved",
    "year": 2026,
    "homes_while_discharging": 526000
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Battery Storage System Development in Lisburn",
   "repd_ref_id": 16478,
   "technology": "Battery",
   "capacity_mw": 150.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2026-01-30",
   "refused": null,
   "planning_authority": "Stockton-on-Tees",
   "planning_ref": "LA05/2024/0401/F",
   "operator": "Lisburn Energy Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2026-01-30",
     "years_since_consent": 0.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Castor Bay Water Treatment Works, Castor Bay Road - Solar Farm",
   "repd_ref_id": 18205,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 5.0,
   "homes_equivalent": 1800,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Armagh City, Banbridge and Craigavon",
   "planning_ref": "LA08/2025/0042/F",
   "operator": "NI Water",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 19 months for a planning decision",
    "who": "Armagh City, Banbridge and Craigavon Council",
    "evidence": {
     "submitted": "2025-01-13",
     "months_waiting": 19
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "N05000015",
  "N05000016",
  "N05000017",
  "N05000003",
  "N05000004",
  "N05000014",
  "N05000010"
 ],
 "flags": [
  "curtailment_not_visible",
  "ni_sem",
  "5_sites_geocoded_by_fallback"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}