 "pcon24cd": "N05000003",
 "name": "Belfast South and Mid Down",
 "nation": "Northern Ireland",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 0.2,
  "stuck_mw_int": 0,
  "stuck_sites": 1,
  "homes_equivalent": 200,
  "homes_vs_seat_households": 0.0,
  "stuck_mw_12m_cut": 0.2,
  "consented_not_built_mw_any_age": 0.2,
  "operational_mw": 0.0,
  "operational_homes_equivalent": 0,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 10.9,
  "rank": 535,
  "tech_mix": {
   "onshore wind": 0.2
  },
  "tech_summary": "all onshore wind",
  "waiting_vs_running": null,
  "projects": [
   {
    "site_name": "Ballynahinch Road",
    "repd_ref_id": 8237,
    "technology": "Wind Onshore",
    "capacity_mw": 0.2,
    "homes_equivalent": 200,
    "consented": "2021-09-01",
    "months_waiting": 59.0,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": false,
  "note": "Northern Ireland is part of the all-Ireland Single Electricity Market, not the GB grid, so GB bottleneck costs do not apply."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 0.0,
  "approved_mw": 36.0,
  "approved_24m_mw": 36.0,
  "refused_mw": 0.0,
  "submitted_mw": 0.0,
  "sites": [
   {
    "site_name": "Lisnabreeny Road",
    "capacity_mw": 36.0,
    "status": "approved",
    "year": 2019,
    "homes_while_discharging": 126000
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Lisnabreeny Road",
   "repd_ref_id": 7556,
   "technology": "Battery",
   "capacity_mw": 36.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2019-06-21",
   "refused": null,
   "planning_authority": "Lisburn and Castlereagh",
   "planning_ref": "LA05/2019/0675/F",
   "operator": "Energia Group",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 7 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2019-06-21",
     "years_since_consent": 7.1
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Solar PV Energy Alterations in Belfast",
   "repd_ref_id": 16445,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 2.0,
   "homes_equivalent": 700,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Belfast",
   "planning_ref": "LA03/2024/0255/F",
   "operator": "HHT  Management Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 2.3 years for a planning decision",
    "who": "Belfast Council",
    "evidence": {
     "submitted": "2024-04-10",
     "months_waiting": 28
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "N05000016",
  "N05000009",
  "N05000004",
  "N05000001",
  "N05000002"
 ],
 "flags": [
  "curtailment_not_visible",
  "ni_sem",
  "1_sites_geocoded_by_fallback"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}