{
 "pcon24cd": "E14001560",
 "name": "Wakefield and Rothwell",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 3.4,
  "stuck_mw_int": 3,
  "stuck_sites": 2,
  "homes_equivalent": 1200,
  "homes_vs_seat_households": 0.03,
  "stuck_mw_12m_cut": 4.4,
  "consented_not_built_mw_any_age": 5.0,
  "operational_mw": 0.0,
  "operational_homes_equivalent": 0,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 1.6,
  "rank": 289,
  "tech_mix": {
   "solar": 3.4
  },
  "tech_summary": "all solar",
  "waiting_vs_running": null,
  "projects": [
   {
    "site_name": "Phoenix Healthcare Distribution Centre - Solar Panels",
    "repd_ref_id": 15806,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 3.2,
    "homes_equivalent": 1200,
    "consented": "2024-02-29",
    "months_waiting": 29.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Headways, Unit 3 - Solar Panels",
    "repd_ref_id": 17203,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 1.0,
    "homes_equivalent": 400,
    "consented": "2024-10-21",
    "months_waiting": 21.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Vehicle Testing Station, Patrick Green - Solar Panels",
    "repd_ref_id": 19551,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2025-10-09",
    "months_waiting": 9.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Unit 11, Albert Drive - Solar Panels",
    "repd_ref_id": 13946,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2023-07-06",
    "months_waiting": 36.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Manheim Car Auctions, Rothwell - Solar Panels",
    "repd_ref_id": 19566,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2025-10-20",
    "months_waiting": 9.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Carshop Wakefield, Calder Island Way - Solar Panels",
    "repd_ref_id": 19979,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.1,
    "homes_equivalent": 100,
    "consented": "2025-12-17",
    "months_waiting": 7.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Pinderfields General Hospital, Aberford Road - Solar PV Panels",
    "repd_ref_id": 19632,
    "technology": "Solar Photovoltaics",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2025-10-28",
    "months_waiting": 9.2,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 45225,
  "seat_total_gbp": 4200000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 0.0,
  "approved_mw": 53.4,
  "approved_24m_mw": 3.4,
  "refused_mw": 0.0,
  "submitted_mw": 0.0,
  "sites": [
   {
    "site_name": "Westfield Road, Carlton - Battery Storage",
    "capacity_mw": 50.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Phoenix Healthcare Distribution Centre - Battery Storage",
    "capacity_mw": 3.4,
    "status": "approved",
    "year": 2024,
    "homes_while_discharging": 12000
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Westfield Road, Carlton - Battery Storage",
   "repd_ref_id": 15338,
   "technology": "Battery",
   "capacity_mw": 50.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-07-14",
   "refused": "2024-05-03",
   "planning_authority": "Leeds",
   "planning_ref": "23/06404/FU",
   "operator": "Firma Vogt Solar Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-07-14",
     "years_since_consent": 1.1
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Phoenix Healthcare Distribution Centre - Battery Storage",
   "repd_ref_id": 15807,
   "technology": "Battery",
   "capacity_mw": 3.4,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2024-02-29",
   "refused": null,
   "planning_authority": "Wakefield",
   "planning_ref": "23/02235/FUL",
   "operator": "Phoenix Medical Supplies",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-02-29",
     "years_since_consent": 2.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Phoenix Healthcare Distribution Centre - Solar Panels",
   "repd_ref_id": 15806,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 3.2,
   "homes_equivalent": 1200,
   "status": "Awaiting Construction",
   "consented": "2024-02-29",
   "refused": null,
   "planning_authority": "Wakefield",
   "planning_ref": "23/02235/FUL",
   "operator": "Phoenix Medical Supplies",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-02-29",
     "years_since_consent": 2.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Headways, Unit 3 - Solar Panels",
   "repd_ref_id": 17203,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 1.0,
   "homes_equivalent": 400,
   "status": "Awaiting Construction",
   "consented": "2024-10-21",
   "refused": null,
   "planning_authority": "Wakefield",
   "planning_ref": "24/01632/SPN",
   "operator": "Harvest Green Developments",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-10-21",
     "years_since_consent": 1.8
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001418",
  "E14001383",
  "E14001324",
  "E14001323",
  "E14001320",
  "E14001428",
  "E14001464"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}