 "pcon24cd": "E14001508",
 "name": "St Austell and Newquay",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 9.6,
   "sites": 3
  }
 },
 "number2": {
  "stuck_mw": 10.9,
  "stuck_mw_int": 11,
  "stuck_sites": 5,
  "homes_equivalent": 8900,
  "homes_vs_seat_households": 0.21,
  "stuck_mw_12m_cut": 19.5,
  "consented_not_built_mw_any_age": 37.0,
  "operational_mw": 95.9,
  "operational_homes_equivalent": 40000,
  "refused_5y_mw": 6.2,
  "withdrawn_5y_mw": 0.5,
  "median_months_to_decision": 7.1,
  "rank": 222,
  "tech_mix": {
   "onshore wind": 9.7,
   "solar": 1.2
  },
  "tech_summary": "almost all onshore wind",
  "waiting_vs_running": 0.1,
  "projects": [
   {
    "site_name": "Menear Road - Solar & Battery storage",
    "repd_ref_id": 11076,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 17.5,
    "homes_equivalent": 6400,
    "consented": "2026-02-13",
    "months_waiting": 5.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Woodland Barton Farm -Solar Farm",
    "repd_ref_id": 17357,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 4.5,
    "homes_equivalent": 1600,
    "consented": "2024-11-01",
    "months_waiting": 21.0,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Goonamarth Farm - Wind Turbine",
    "repd_ref_id": 15275,
    "technology": "Wind Onshore",
    "capacity_mw": 4.3,
    "homes_equivalent": 3800,
    "consented": "2024-05-01",
    "months_waiting": 27.1,
    "status": "Under Construction"
   },
   {
    "site_name": "Lower Longstones, St Mewan Wind Turbine",
    "repd_ref_id": 7952,
    "technology": "Wind Onshore",
    "capacity_mw": 4.1,
    "homes_equivalent": 3600,
    "consented": "2021-03-01",
    "months_waiting": 65.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Burngullow Common - Wind Turbine",
    "repd_ref_id": 9725,
    "technology": "Wind Onshore",
    "capacity_mw": 4.1,
    "homes_equivalent": 3600,
    "consented": "2025-01-24",
    "months_waiting": 18.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Wheal Martyn, Carthew - 1 Wind turbine",
    "repd_ref_id": 9499,
    "technology": "Wind Onshore",
    "capacity_mw": 1.3,
    "homes_equivalent": 1100,
    "consented": "2022-02-17",
    "months_waiting": 53.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Cornwall Gateway Trunk Road, Service Area - Solar Farm",
    "repd_ref_id": 14694,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.8,
    "homes_equivalent": 300,
    "consented": "2024-06-20",
    "months_waiting": 25.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Treloggan Road - Solar Panels",
    "repd_ref_id": 10735,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.4,
    "homes_equivalent": 100,
    "consented": "2022-04-13",
    "months_waiting": 51.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Watering Lane Nursery, Lobbs Shop - Solar PV Panels & Battery Storage System",
    "repd_ref_id": 16518,
    "technology": "Solar Photovoltaics",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2025-06-02",
    "months_waiting": 14.0,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 43478,
  "seat_total_gbp": 4000000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 0.0,
  "approved_mw": 167.9,
  "approved_24m_mw": 162.5,
  "refused_mw": 0.0,
  "submitted_mw": 0.0,
  "sites": [
   {
    "site_name": "Indian Queens Sub station, Carne Hill - Battery Energy Storage",
    "capacity_mw": 50.0,
    "status": "approved",
    "year": 2023,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Indian Queens National Grid Substation, Domelick Hill - Battery Storage",
    "capacity_mw": 50.0,
    "status": "approved",
    "year": 2024,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Indian Queens Sub-Station - Battery Storage",
    "capacity_mw": 47.5,
    "status": "approved",
    "year": 2022,
    "homes_while_discharging": 166000
   },
   {
    "site_name": "Mount Stamper Road, Treverbyn -  Battery Energy Storage",
    "capacity_mw": 10.0,
    "status": "approved",
    "year": 2024,
    "homes_while_discharging": 35000
   },
   {
    "site_name": "Eden Project",
    "capacity_mw": 5.0,
    "status": "approved",
    "year": 2019,
    "homes_while_discharging": 18000
   },
   {
    "site_name": "Menear Road - Solar & Battery storage",
    "capacity_mw": 5.0,
    "status": "approved",
    "year": 2026,
    "homes_while_discharging": 18000
   },
   {
    "site_name": "Victoria Business Park, Roche - Battery Energy Storage",
    "capacity_mw": 0.2,
    "status": "approved",
    "year": 2024,
    "homes_while_discharging": 700
   },
   {
    "site_name": "St Austell Road, Treverbyn - Micro Energy Storage",
    "capacity_mw": 0.2,
    "status": "approved",
    "year": 2026,
    "homes_while_discharging": 700
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Indian Queens National Grid Substation, Domelick Hill - Battery Storage",
   "repd_ref_id": 14687,
   "technology": "Battery",
   "capacity_mw": 50.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2024-04-23",
   "refused": null,
   "planning_authority": "Cornwall",
   "planning_ref": "PA23/06527",
   "operator": "EDF Energy Renewables (merged with Pivot Power)",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-04-23",
     "years_since_consent": 2.3
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Indian Queens Sub station, Carne Hill - Battery Energy Storage",
   "repd_ref_id": 14461,
   "technology": "Battery",
   "capacity_mw": 50.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2023-12-22",
   "refused": null,
   "planning_authority": "Cornwall",
   "planning_ref": "PA23/04504",
   "operator": "Renewable Connections Development Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-12-22",
     "years_since_consent": 2.6
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Burthy Row Farm, Trefullock Moor - Solar Farm & Battery Storage",
   "repd_ref_id": 12852,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Cornwall",
   "planning_ref": "PA23/01893",
   "operator": "JBM Solar Projects Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 3.4 years for a planning decision",
    "who": "Cornwall Council",
    "evidence": {
     "submitted": "2023-03-22",
     "months_waiting": 40
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Green Acres Farm, Scarcewater - Solar Farm",
   "repd_ref_id": 15619,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Cornwall",
   "planning_ref": "PA24/05312",
   "operator": "EDF Renewables",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 24 months for a planning decision",
    "who": "Cornwall Council",
    "evidence": {
     "submitted": "2024-08-13",
     "months_waiting": 24
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Indian Queens Sub-Station - Battery Storage",
   "repd_ref_id": 11725,
   "technology": "Battery",
   "capacity_mw": 47.5,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2022-10-17",
   "refused": null,
   "planning_authority": "Cornwall",
   "planning_ref": "PA22/05961",
   "operator": "Prime Energy Development Limited / Valero Energy / Sambar Power",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2027, 5 years after it was approved",
    "who": "the grid operator (NESO) and National Grid",
    "evidence": {
     "project": "Indian Queens Energy Centre",
     "connection_date": "2027-05-30",
     "mw": 47.5,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2027",
   "tec": {
    "project": "Indian Queens Energy Centre",
    "connection_date": "2027-05-30",
    "connection_year": 2027,
    "mw": 47.5,
    "stage": null,
    "who": "the grid operator (NESO) and National Grid",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Menear Road - Solar & Battery storage",
   "repd_ref_id": 11076,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 17.5,
   "homes_equivalent": 6400,
   "status": "Awaiting Construction",
   "consented": "2026-02-13",
   "refused": "2025-04-23",
   "planning_authority": "Cornwall",
   "planning_ref": "PA23/09532",
   "operator": "Anesco Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2026-02-13",
     "years_since_consent": 0.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Mount Stamper Road, Treverbyn -  Battery Energy Storage",
   "repd_ref_id": 16379,
   "technology": "Battery",
   "capacity_mw": 10.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2024-06-17",
   "refused": null,
   "planning_authority": "Cornwall",
   "planning_ref": "PA24/01713",
   "operator": "Aldustria Energy Storage",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-06-17",
     "years_since_consent": 2.1
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Eden Project Geothermal Energy Facility",
   "repd_ref_id": 4692,
   "technology": "Hot Dry Rocks (HDR)",
   "capacity_mw": 7.0,
   "homes_equivalent": null,
   "status": "Under Construction",
   "consented": "2010-12-16",
   "refused": null,
   "planning_authority": "Cornwall",
   "planning_ref": "PA10/04671",
   "operator": "EGS Energy/Eden Project Limited",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Tregorrick Farm",
   "repd_ref_id": 8303,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 6.0,
   "homes_equivalent": 2200,
   "status": "Appeal Refused",
   "consented": null,
   "refused": "2023-01-05",
   "planning_authority": "Cornwall",
   "planning_ref": "PA20/11504",
   "operator": "E H Energy Limited",
   "reason": {
    "reason": "refused",
    "label": "Refused by Cornwall Council in 2023",
    "who": "the planning appeal inspector",
    "evidence": {
     "refusal_date": "2023-01-05"
    },
    "all_matches": [
     "refused"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Eden Project",
   "repd_ref_id": 7373,
   "technology": "Battery",
   "capacity_mw": 5.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2019-04-10",
   "refused": null,
   "planning_authority": "Cornwall",
   "planning_ref": "PA19/03137",
   "operator": "Good Energy",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 7 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2019-04-10",
     "years_since_consent": 7.3
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Menear Road - Solar & Battery storage",
   "repd_ref_id": 11077,
   "technology": "Battery",
   "capacity_mw": 5.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2026-02-13",
   "refused": "2025-04-23",
   "planning_authority": "Cornwall",
   "planning_ref": "PA23/09532",
   "operator": "Anesco Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2026-02-13",
     "years_since_consent": 0.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Woodland Barton Farm -Solar Farm",
   "repd_ref_id": 17357,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 4.5,
   "homes_equivalent": 1600,
   "status": "Awaiting Construction",
   "consented": "2024-11-01",
   "refused": null,
   "planning_authority": "Cornwall",
   "planning_ref": "PA24/07060",
   "operator": "KPS SPV 4 Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-11-01",
     "years_since_consent": 1.8
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Goonamarth Farm - Wind Turbine",
   "repd_ref_id": 15275,
   "technology": "Wind Onshore",
   "capacity_mw": 4.3,
   "homes_equivalent": 3800,
   "status": "Under Construction",
   "consented": "2024-05-01",
   "refused": null,
   "planning_authority": "Cornwall",
   "planning_ref": "PA23/10069",
   "operator": "Clean Earth Energy Limited",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Higher Biscovillack Farm, Greensplat - Wind Turbine",
   "repd_ref_id": 20441,
   "technology": "Wind Onshore",
   "capacity_mw": 4.3,
   "homes_equivalent": 3800,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Cornwall",
   "planning_ref": "PA25/09581",
   "operator": "Clean Earth Energy Limited",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2026, still waiting for a decision",
    "who": "Cornwall Council",
    "evidence": {
     "submitted": "2026-01-21",
     "months_waiting": 6
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Burngullow Common - Wind Turbine",
   "repd_ref_id": 9725,
   "technology": "Wind Onshore",
   "capacity_mw": 4.1,
   "homes_equivalent": 3600,
   "status": "Awaiting Construction",
   "consented": "2025-01-24",
   "refused": null,
   "planning_authority": "Cornwall",
   "planning_ref": "PA23/09937",
   "operator": "Clean Earth Energy Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-01-24",
     "years_since_consent": 1.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Lower Longstones, St Mewan Wind Turbine",
   "repd_ref_id": 7952,
   "technology": "Wind Onshore",
   "capacity_mw": 4.1,
   "homes_equivalent": 3600,
   "status": "Awaiting Construction",
   "consented": "2021-03-01",
   "refused": null,
   "planning_authority": "Cornwall",
   "planning_ref": "PA20/09318",
   "operator": "Clean Earth Energy Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 5 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2021-03-01",
     "years_since_consent": 5.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Wheal Martyn, Carthew - 1 Wind turbine",
   "repd_ref_id": 9499,
   "technology": "Wind Onshore",
   "capacity_mw": 1.3,
   "homes_equivalent": 1100,
   "status": "Awaiting Construction",
   "consented": "2022-02-17",
   "refused": null,
   "planning_authority": "Cornwall",
   "planning_ref": "PA21/07216",
   "operator": "Clean Earth Energy / Imerys Minerals Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-02-17",
     "years_since_consent": 4.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001554",
  "E14001486",
  "E14001385"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}