 "pcon24cd": "E14001484",
 "name": "South Devon",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 2.7,
  "stuck_mw_int": 3,
  "stuck_sites": 1,
  "homes_equivalent": 1000,
  "homes_vs_seat_households": 0.02,
  "stuck_mw_12m_cut": 2.7,
  "consented_not_built_mw_any_age": 2.7,
  "operational_mw": 54.4,
  "operational_homes_equivalent": 20000,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.3,
  "median_months_to_decision": 17.7,
  "rank": 312,
  "tech_mix": {
   "solar": 2.7
  },
  "tech_summary": "all solar",
  "waiting_vs_running": 0.0,
  "projects": [
   {
    "site_name": "Brokenbury Farm, Galmpton - Solar Farm",
    "repd_ref_id": 9181,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 2.7,
    "homes_equivalent": 1000,
    "consented": "2022-11-18",
    "months_waiting": 44.5,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 40872,
  "seat_total_gbp": 3800000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 0.0,
  "approved_mw": 0.0,
  "approved_24m_mw": 0.0,
  "refused_mw": 0.0,
  "submitted_mw": 99.0,
  "sites": [
   {
    "site_name": "Hood Barton, Staverton - Battery Energy Storage System",
    "capacity_mw": 99.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 347000
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Hood Barton, Staverton - Battery Energy Storage System",
   "repd_ref_id": 17261,
   "technology": "Battery",
   "capacity_mw": 99.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "South Hams",
   "planning_ref": "3628/24/FUL",
   "operator": "Energy Planning",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 20 months for a planning decision",
    "who": "South Hams Council",
    "evidence": {
     "submitted": "2024-12-12",
     "months_waiting": 20
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Brokenbury Farm, Galmpton - Solar Farm",
   "repd_ref_id": 9181,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 2.7,
   "homes_equivalent": 1000,
   "status": "Awaiting Construction",
   "consented": "2022-11-18",
   "refused": null,
   "planning_authority": "Torbay",
   "planning_ref": "P/2021/0658",
   "operator": "Torbay Development Agency",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-11-18",
     "years_since_consent": 3.7
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001495",
  "E14001381",
  "E14001551",
  "E14001155",
  "E14001552"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}