{
 "pcon24cd": "E14001476",
 "name": "Sleaford and North Hykeham",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 43.0,
  "stuck_mw_int": 43,
  "stuck_sites": 10,
  "homes_equivalent": 16000,
  "homes_vs_seat_households": 0.38,
  "stuck_mw_12m_cut": 44.3,
  "consented_not_built_mw_any_age": 112.2,
  "operational_mw": 59.4,
  "operational_homes_equivalent": 22000,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.3,
  "median_months_to_decision": 1.8,
  "rank": 156,
  "tech_mix": {
   "solar": 43.0
  },
  "tech_summary": "all solar",
  "waiting_vs_running": 0.7,
  "projects": [
   {
    "site_name": "Mareham Lane, Solar PV Panels",
    "repd_ref_id": 15180,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 50.0,
    "homes_equivalent": 18000,
    "consented": "2026-02-16",
    "months_waiting": 5.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Branston Solar Park (extension)",
    "repd_ref_id": 6456,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 40.0,
    "homes_equivalent": 15000,
    "consented": "2017-12-19",
    "months_waiting": 103.4,
    "status": "Under Construction"
   },
   {
    "site_name": "Whisby Quarry, Eagle Road - Solar Array",
    "repd_ref_id": 16797,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 18.0,
    "homes_equivalent": 6500,
    "consented": "2025-09-17",
    "months_waiting": 10.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Swinderby Quarry - Solar PV Array",
    "repd_ref_id": 14667,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 1.2,
    "homes_equivalent": 400,
    "consented": "2023-11-13",
    "months_waiting": 32.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Pilgrims Pride, Sleaford Road - Solar Panels",
    "repd_ref_id": 16631,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.7,
    "homes_equivalent": 300,
    "consented": "2024-08-21",
    "months_waiting": 23.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Beeswax Dyson Farming, Cyclone Way - Solar Arrays",
    "repd_ref_id": 16573,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.5,
    "homes_equivalent": 200,
    "consented": "2024-07-09",
    "months_waiting": 24.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Pilgrims UK, Sleaford Road - Solar Canopy",
    "repd_ref_id": 16652,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.5,
    "homes_equivalent": 200,
    "consented": "2024-08-29",
    "months_waiting": 23.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Noble Foods, Hives Lane - Solar Panels",
    "repd_ref_id": 12662,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.4,
    "homes_equivalent": 100,
    "consented": "2023-07-14",
    "months_waiting": 36.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Cargill & Frontier Agriculture, Camp Road - Solar Panels",
    "repd_ref_id": 13193,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.4,
    "homes_equivalent": 100,
    "consented": "2023-03-29",
    "months_waiting": 40.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Barn Farm, Navenby - Solar Panels",
    "repd_ref_id": 10980,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2022-05-24",
    "months_waiting": 50.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Boothby Graffoe - Solar photovoltaics panels",
    "repd_ref_id": 11152,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2022-05-24",
    "months_waiting": 50.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "North Kesteven Sports Centre, Moor Lane - Solar PV Panels",
    "repd_ref_id": 16575,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2024-07-10",
    "months_waiting": 24.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Skinnand Manor Farm, Navenby - Solar panels",
    "repd_ref_id": 11010,
    "technology": "Solar Photovoltaics",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2022-05-23",
    "months_waiting": 50.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "The Feed Mill, Lowfields - Solar Panels",
    "repd_ref_id": 15925,
    "technology": "Solar Photovoltaics",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2024-03-28",
    "months_waiting": 28.2,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 41558,
  "seat_total_gbp": 3800000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 0.0,
  "approved_mw": 0.0,
  "approved_24m_mw": 0.0,
  "refused_mw": 0.0,
  "submitted_mw": 2000.0,
  "sites": [
   {
    "site_name": "Hill Rise, Coleby - Battery Energy Storage",
    "capacity_mw": 1000.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 3504000
   },
   {
    "site_name": "Beacon Fen Energy Park",
    "capacity_mw": 600.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 2102000
   },
   {
    "site_name": "Green Man Road, Navenby - Battery Storage",
    "capacity_mw": 400.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 1402000
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Hill Rise, Coleby - Battery Energy Storage",
   "repd_ref_id": 18790,
   "technology": "Battery",
   "capacity_mw": 1000.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "North Kesteven",
   "planning_ref": "25/0533/FUL",
   "operator": "Navenby Energy Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 15 months for a planning decision",
    "who": "North Kesteven Council",
    "evidence": {
     "submitted": "2025-05-15",
     "months_waiting": 15
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Beacon Fen Energy Park",
   "repd_ref_id": 13600,
   "technology": "Battery",
   "capacity_mw": 600.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "The Planning Inspectorate - National Infrastructure",
   "planning_ref": "EN010151",
   "operator": "Low Carbon Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 16 months for a planning decision",
    "who": "the Planning Inspectorate (it decides nationally significant projects)",
    "evidence": {
     "submitted": "2025-04-08",
     "months_waiting": 16
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Beacon Fen Energy Park",
   "repd_ref_id": 13599,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 400.0,
   "homes_equivalent": 145000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "The Planning Inspectorate - National Infrastructure",
   "planning_ref": "EN010151",
   "operator": "Low Carbon Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 16 months for a planning decision",
    "who": "the Planning Inspectorate (it decides nationally significant projects)",
    "evidence": {
     "submitted": "2025-04-08",
     "months_waiting": 16
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Green Man Road, Navenby - Battery Storage",
   "repd_ref_id": 13977,
   "technology": "Battery",
   "capacity_mw": 400.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "North Kesteven",
   "planning_ref": "25/0491/FUL",
   "operator": "Windel Energy / Canadian Solar",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 15 months for a planning decision",
    "who": "North Kesteven Council",
    "evidence": {
     "submitted": "2025-05-09",
     "months_waiting": 15
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Fosse Green Energy",
   "repd_ref_id": 14100,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 350.0,
   "homes_equivalent": 127000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "The Planning Inspectorate - National Infrastructure",
   "planning_ref": "EN010154",
   "operator": "Windel Energy / Canadian Solar",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 13 months for a planning decision",
    "who": "the Planning Inspectorate (it decides nationally significant projects)",
    "evidence": {
     "submitted": "2025-07-18",
     "months_waiting": 13
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Mareham Lane, Solar PV Panels",
   "repd_ref_id": 15180,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 50.0,
   "homes_equivalent": 18000,
   "status": "Awaiting Construction",
   "consented": "2026-02-16",
   "refused": "2025-03-21",
   "planning_authority": "North Kesteven",
   "planning_ref": "23/1419/FUL",
   "operator": "Lighthouse Development Consulting",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2026-02-16",
     "years_since_consent": 0.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Branston Solar Park (extension)",
   "repd_ref_id": 6456,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 40.0,
   "homes_equivalent": 15000,
   "status": "Under Construction",
   "consented": "2017-12-19",
   "refused": null,
   "planning_authority": "North Kesteven",
   "planning_ref": "17/1546/FUL",
   "operator": "Ethical Power",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Whisby Quarry, Eagle Road - Solar Array",
   "repd_ref_id": 16797,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 18.0,
   "homes_equivalent": 6500,
   "status": "Awaiting Construction",
   "consented": "2025-09-17",
   "refused": null,
   "planning_authority": "North Kesteven",
   "planning_ref": "PL/0130/24",
   "operator": "Conrad  Energy",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-09-17",
     "years_since_consent": 0.9
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Barn Farm Lowfields, Navenby - Biomass boiler",
   "repd_ref_id": 11829,
   "technology": "Biomass (dedicated)",
   "capacity_mw": 1.6,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2022-09-12",
   "refused": null,
   "planning_authority": "North Kesteven",
   "planning_ref": "22/1018/FUL",
   "operator": "G E Porter & Sons Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-09-12",
     "years_since_consent": 3.9
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Skinnand Manor Farm, Parsons Lane - Biomass Boiler",
   "repd_ref_id": 12014,
   "technology": "Biomass (dedicated)",
   "capacity_mw": 1.6,
   "homes_equivalent": null,
   "status": "Under Construction",
   "consented": "2023-02-02",
   "refused": null,
   "planning_authority": "North Kesteven",
   "planning_ref": "22/1198/FUL",
   "operator": "G E Porter & Sons Limited",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Poplar Farm, Lowfields - Biomass Boiler",
   "repd_ref_id": 12044,
   "technology": "Biomass (dedicated)",
   "capacity_mw": 1.6,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2022-10-14",
   "refused": null,
   "planning_authority": "North Kesteven",
   "planning_ref": "22/1199/FUL",
   "operator": "G E Porter & Sons Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-10-14",
     "years_since_consent": 3.8
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Castle Farm, Castle Lane - Biomass Boiler & Agricultural Building",
   "repd_ref_id": 12052,
   "technology": "Biomass (dedicated)",
   "capacity_mw": 1.6,
   "homes_equivalent": null,
   "status": "Under Construction",
   "consented": "2023-06-06",
   "refused": null,
   "planning_authority": "North Kesteven",
   "planning_ref": "22/1200/FUL",
   "operator": "G.E. Porter & Sons Limited",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Swinderby Quarry - Solar PV Array",
   "repd_ref_id": 14667,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 1.2,
   "homes_equivalent": 400,
   "status": "Awaiting Construction",
   "consented": "2023-11-13",
   "refused": null,
   "planning_authority": "North Kesteven",
   "planning_ref": "PL/0055/23",
   "operator": "CEMEX UK Properties",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-11-13",
     "years_since_consent": 2.7
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001253",
  "E14001336",
  "E14001243",
  "E14001114",
  "E14001343",
  "E14001375"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}