 "pcon24cd": "E14001420",
 "name": "Oxford West and Abingdon",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 2.7,
  "stuck_mw_int": 3,
  "stuck_sites": 5,
  "homes_equivalent": 1000,
  "homes_vs_seat_households": 0.03,
  "stuck_mw_12m_cut": 2.7,
  "consented_not_built_mw_any_age": 2.7,
  "operational_mw": 0.0,
  "operational_homes_equivalent": 0,
  "refused_5y_mw": 50.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 2.9,
  "rank": 313,
  "tech_mix": {
   "solar": 2.7
  },
  "tech_summary": "all solar",
  "waiting_vs_running": null,
  "projects": [
   {
    "site_name": "Radley College, Kennington Gate - Solar Array & Battery Storage",
    "repd_ref_id": 13691,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 2.0,
    "homes_equivalent": 700,
    "consented": "2023-08-10",
    "months_waiting": 35.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Oxford High School, Belbroughton Road  - Solar Panels",
    "repd_ref_id": 16341,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2024-06-20",
    "months_waiting": 25.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Riverside House, Osney Mead - Solar Panels",
    "repd_ref_id": 12765,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2023-01-10",
    "months_waiting": 42.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Blacklands Way - Solar Panels",
    "repd_ref_id": 14466,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2023-08-23",
    "months_waiting": 35.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Wolfson College - Solar Panels",
    "repd_ref_id": 10762,
    "technology": "Solar Photovoltaics",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2023-09-04",
    "months_waiting": 35.0,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 38163,
  "seat_total_gbp": 3500000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 0.0,
  "approved_mw": 0.0,
  "approved_24m_mw": 0.0,
  "refused_mw": 0.0,
  "submitted_mw": 0.0,
  "sites": []
 },
 "pipeline_projects": [
  {
   "site_name": "Botley - Solar Photovoltaic Array",
   "repd_ref_id": 18174,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 50.0,
   "homes_equivalent": 18000,
   "status": "Application Refused",
   "consented": null,
   "refused": "2025-11-06",
   "planning_authority": "Vale of White Horse",
   "planning_ref": "P24/V2489/FUL",
   "operator": "Red House Solar Limited",
   "reason": {
    "reason": "refused",
    "label": "Refused by Vale of White Horse Council in 2025",
    "who": "Vale of White Horse Council",
    "evidence": {
     "refusal_date": "2025-11-06"
    },
    "all_matches": [
     "refused"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Radley College, Kennington Gate - Solar Array & Battery Storage",
   "repd_ref_id": 13691,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 2.0,
   "homes_equivalent": 700,
   "status": "Awaiting Construction",
   "consented": "2023-08-10",
   "refused": null,
   "planning_authority": "Vale of White Horse",
   "planning_ref": "P23/V0861/FUL",
   "operator": "Radley College",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-08-10",
     "years_since_consent": 3.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001591",
  "E14001197",
  "E14001280",
  "E14001419",
  "E14001090"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}