 "pcon24cd": "E14001415",
 "name": "Oldham East and Saddleworth",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 0.5,
  "stuck_mw_int": 0,
  "stuck_sites": 1,
  "homes_equivalent": 200,
  "homes_vs_seat_households": 0.0,
  "stuck_mw_12m_cut": 0.5,
  "consented_not_built_mw_any_age": 0.5,
  "operational_mw": 0.0,
  "operational_homes_equivalent": 0,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 1.7,
  "rank": 491,
  "tech_mix": {
   "solar": 0.5
  },
  "tech_summary": "all solar",
  "waiting_vs_running": null,
  "projects": [
   {
    "site_name": "Molnlycke Healthcare, Brook Street - Solar Panels",
    "repd_ref_id": 13218,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.5,
    "homes_equivalent": 200,
    "consented": "2023-03-29",
    "months_waiting": 40.2,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 42233,
  "seat_total_gbp": 3900000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 0.0,
  "approved_mw": 0.0,
  "approved_24m_mw": 0.0,
  "refused_mw": 0.0,
  "submitted_mw": 27.0,
  "sites": [
   {
    "site_name": "Lowerfields Farm, Warren Lane - Battery Energy Storage System",
    "capacity_mw": 27.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 95000
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Lowerfields Farm, Warren Lane - Battery Energy Storage System",
   "repd_ref_id": 19458,
   "technology": "Battery",
   "capacity_mw": 27.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Oldham",
   "planning_ref": "FUL/354740/25",
   "operator": "Renewable Connections Developments Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 12 months for a planning decision",
    "who": "Oldham Council",
    "evidence": {
     "submitted": "2025-07-24",
     "months_waiting": 12
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001287",
  "E14001515",
  "E14001070",
  "E14001416",
  "E14001177",
  "E14001446",
  "E14001147"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}