{
 "pcon24cd": "E14001413",
 "name": "Nuneaton",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 1.6,
  "stuck_mw_int": 2,
  "stuck_sites": 3,
  "homes_equivalent": 600,
  "homes_vs_seat_households": 0.01,
  "stuck_mw_12m_cut": 1.6,
  "consented_not_built_mw_any_age": 1.9,
  "operational_mw": 5.0,
  "operational_homes_equivalent": 1800,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 1.7,
  "rank": 364,
  "tech_mix": {
   "solar": 1.6
  },
  "tech_summary": "all solar",
  "waiting_vs_running": 0.3,
  "projects": [
   {
    "site_name": "Hamilton Way, Unit 12 - Solar Array",
    "repd_ref_id": 13563,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.7,
    "homes_equivalent": 300,
    "consented": "2023-04-27",
    "months_waiting": 39.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "St Georges Way - Solar photovoltaics",
    "repd_ref_id": 10982,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.6,
    "homes_equivalent": 200,
    "consented": "2022-05-06",
    "months_waiting": 50.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "North Warwickshire College, Hinckley Road - Solar Panel",
    "repd_ref_id": 14601,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2023-09-18",
    "months_waiting": 34.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "George eliot high school, Raveloe Drive - Solar Panels",
    "repd_ref_id": 19852,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2025-12-08",
    "months_waiting": 7.8,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 41893,
  "seat_total_gbp": 3900000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 0.0,
  "approved_mw": 49.9,
  "approved_24m_mw": 0.0,
  "refused_mw": 0.0,
  "submitted_mw": 0.0,
  "sites": [
   {
    "site_name": "Weddington Road - Battery Energy Storage",
    "capacity_mw": 49.9,
    "status": "approved",
    "year": 2026,
    "homes_while_discharging": 175000
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Weddington Road - Battery Energy Storage",
   "repd_ref_id": 17365,
   "technology": "Battery",
   "capacity_mw": 49.9,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2026-02-02",
   "refused": null,
   "planning_authority": "Nuneaton and Bedworth",
   "planning_ref": "40498",
   "operator": "Fig Power",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2026-02-02",
     "years_since_consent": 0.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001400",
  "E14001288",
  "E14001453"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}