 "pcon24cd": "E14001350",
 "name": "Makerfield",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 2.2,
  "stuck_mw_int": 2,
  "stuck_sites": 1,
  "homes_equivalent": 800,
  "homes_vs_seat_households": 0.02,
  "stuck_mw_12m_cut": 2.2,
  "consented_not_built_mw_any_age": 2.2,
  "operational_mw": 0.0,
  "operational_homes_equivalent": 0,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 1.8,
  "rank": 332,
  "tech_mix": {
   "solar": 2.2
  },
  "tech_summary": "all solar",
  "waiting_vs_running": null,
  "projects": [
   {
    "site_name": "Poundland Distribution Centre,Three Sisters Road - Solar Panel",
    "repd_ref_id": 11888,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 2.2,
    "homes_equivalent": 800,
    "consented": "2022-09-26",
    "months_waiting": 46.2,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 43820,
  "seat_total_gbp": 4000000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 0.0,
  "approved_mw": 70.0,
  "approved_24m_mw": 0.0,
  "refused_mw": 0.0,
  "submitted_mw": 0.0,
  "sites": [
   {
    "site_name": "Sandyforth Farm, Ashton Road - Battery Energy Storage",
    "capacity_mw": 70.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 245000
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Sandyforth Farm, Ashton Road - Battery Energy Storage",
   "repd_ref_id": 15930,
   "technology": "Battery",
   "capacity_mw": 70.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-02-25",
   "refused": null,
   "planning_authority": "Wigan",
   "planning_ref": "A/23/96568/MAJOR",
   "operator": "UKGEA",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-02-25",
     "years_since_consent": 1.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Poundland Distribution Centre,Three Sisters Road - Solar Panel",
   "repd_ref_id": 11888,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 2.2,
   "homes_equivalent": 800,
   "status": "Awaiting Construction",
   "consented": "2022-09-26",
   "refused": null,
   "planning_authority": "Wigan",
   "planning_ref": "A/22/93868/FULL",
   "operator": "Standard Life Assurance Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-09-26",
     "years_since_consent": 3.9
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001509",
  "E14001329",
  "E14001577",
  "E14001585",
  "E14001112"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}