{
 "pcon24cd": "E14001308",
 "name": "Keighley and Ilkley",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 0.2,
  "stuck_mw_int": 0,
  "stuck_sites": 1,
  "homes_equivalent": 100,
  "homes_vs_seat_households": 0.0,
  "stuck_mw_12m_cut": 1.7,
  "consented_not_built_mw_any_age": 2.4,
  "operational_mw": 0.0,
  "operational_homes_equivalent": 0,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 1.8,
  "rank": 550,
  "tech_mix": {
   "solar": 0.2
  },
  "tech_summary": "all solar",
  "waiting_vs_running": null,
  "projects": [
   {
    "site_name": "Sainsburys Centre, Cavendish Street - Solar Panels",
    "repd_ref_id": 20597,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.7,
    "homes_equivalent": 300,
    "consented": "2026-05-06",
    "months_waiting": 2.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Carlton Keighley, Green Head Road - Solar Array",
    "repd_ref_id": 17372,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.5,
    "homes_equivalent": 200,
    "consented": "2024-11-26",
    "months_waiting": 20.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "University Academy Keighley, Green Head Road - Solar Panels",
    "repd_ref_id": 18355,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.5,
    "homes_equivalent": 200,
    "consented": "2025-04-24",
    "months_waiting": 15.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Moorland Engineering Works, Lower Railway Road - Solar Panels",
    "repd_ref_id": 18677,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2025-06-06",
    "months_waiting": 13.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Universal Av Services, Horizon House - Solar Panels",
    "repd_ref_id": 12146,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2022-10-17",
    "months_waiting": 45.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Riverside Business Park, Ings Avenue - Solar PV System",
    "repd_ref_id": 18676,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2025-06-03",
    "months_waiting": 14.0,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 41851,
  "seat_total_gbp": 3800000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 0.0,
  "approved_mw": 0.0,
  "approved_24m_mw": 0.0,
  "refused_mw": 0.0,
  "submitted_mw": 0.0,
  "sites": []
 },
 "pipeline_projects": [],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001147",
  "E14001262",
  "E14001472",
  "E14001475",
  "E14001422"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}